Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 39972-2021 English PDF

US$339.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39972-2021: Technical specification of‘Inteplan’information system for implementation and supervision of spatial planning
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 39972-2021339 Add to Cart 4 days Technical specification of‘Inteplan’information system for implementation and supervision of spatial planning Valid

Similar standards

GB/T 41239   GB/T 40212   GB/T 40814   GB/T 45228   GB/T 45341   

Basic data

Standard ID: GB/T 39972-2021 (GB/T39972-2021)
Description (Translated English): Technical specification of��Inteplan��information system for implementation and supervision of spatial planning
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: L67
Word Count Estimation: 18,177
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 39972-2021: Technical specification of‘Inteplan’information system for implementation and supervision of spatial planning


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of'Inteplan'information system for implementation and supervision of spatial planning ICS 35.240.01 CCSL67 National Standards of People's Republic of China "One Picture" Implementation Supervision of Land and Space Planning Information System Technical Specifications Released on 2021-03-09 2021-10-01 implementation State Administration of Market Supervision and Administration Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅲ Introduction Ⅳ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 General requirements 2 4.1 Overall objective 2 4.2 Overall Framework 2 4.3 Relationship with other related systems 3 4.4 Functional composition 3 4.5 Construction Mode 4 5 Data requirements 4 5.1 Basic requirements 4 5.2 Data content 4 5.2.1 General requirements 4 5.2.2 Basic status data 5 5.2.3 Planning Outcome Data 5 5.2.4 Planning and Implementation Data 5 5.2.5 Planning supervision data 5 5.3 Data management requirements 6 6 Functional requirements 6 6.1 Application of "One Picture" in Land and Space Planning 6 6.1.1 General requirements 6 6.1.2 Resource browsing 6 6.1.3 Comparative analysis 6 6.1.4 Query Statistics 6 6.1.5 Thematic mapping 6 6.1.6 Sharing results 7 6.2 Land and space analysis and evaluation 7 6.2.1 General requirements 7 6.2.2 Evaluation of the carrying capacity of resources and environment and the suitability of land and space development 7 6.2.3 Assessment of implementation of land and space planning and risk assessment of land and space development and protection 7 6.3 Review and management of land and space planning results 7 6.3.1 General requirements 7 6.3.2 Outcome quality control 7 6.3.3 Auxiliary review of results 8 6.3.4 Results management 8 6.3.5 Dynamic update of results 8 6.4 Supervision on the implementation of land and space planning 8 6.4.1 Monitoring, evaluation and early warning for implementation of land and space planning 8 6.4.1.1 General requirements 8 6.4.1.2 Dynamic monitoring 8 6.4.1.3 Periodic evaluation 8 6.4.1.4 Timely warning 9 6.4.2 Monitoring and early warning of resource and environment carrying capacity 9 6.4.2.1 General requirements 9 6.4.2.2 Comprehensive supervision 9 6.4.2.3 Dynamic evaluation 9 6.4.2.4 Decision Support 9 6.4.3 The entire process of land and space planning is automatically mandatory to leave traces 9 6.5 Index model management of territorial and spatial planning 9 6.5.1 General requirements 9 6.5.2 Index Management 10 6.5.3 Model Management 10 6.6 Social public services 10 6.6.1 General requirements 10 6.6.2 Public announcement 10 6.6.3 Consultation 10 6.6.4 Public supervision 10 7 Environmental requirements 10 7.1 Network environment 10 7.2 Software and hardware environment 11 8 Security Operation and Maintenance Requirements 11 8.1 Safety requirements 11 8.2 Operation and maintenance requirements 11 Reference 12

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by the Ministry of Natural Resources of the People's Republic of China. This document is under the jurisdiction of the National Standardization Technical Committee for Natural Resources and Land and Space Planning (SAC/TC93). This document was drafted by. Bureau of Land and Space Planning of the Ministry of Natural Resources, Information Center of the Ministry of Natural Resources, Urban and Rural Planning Management of the Ministry of Natural Resources Xin, China Urban Science Research Association, Zhongcheng Wisdom (Beijing) Urban Planning and Design Institute Co., Ltd., China Electronics Standardization Institute, Nanjing City Planning and Research Center, Nanjing University, Beijing Tsinghua Tongheng Planning and Design Research Institute Co., Ltd., Shanghai Shuhui System Technology Co., Ltd., Guangzhou Aoge Intelligent Technology Co., Ltd., China Urban Planning and Design Institute, Changchun City Planning and Research Center. The main drafters of this document. Zhang Bing, Fan Yanping, Men Xiaoying, Wang Wei, Wu Hongtao, Zhang Xin, Deng Songping, Liu Juanjuan, Zhao Yue, Li Zhijun, Wan Biyu, Jiang Dong, Lin Yuxian, Xu Hui, Li Dong, Chai Xun, Zhang Hongwei, Wu Lili, Li Gongli, Yang Haigang, Wang Yao, Zhang Bo, Sun Yuting, Zhai Jian, Zhen Feng, Ma Chao, Peng Jinshuang.

Introduction

Land and space planning is a guide for national spatial development, a spatial blueprint for sustainable development, and the basic basis for various development, protection and construction activities. according to. Establish a territorial and spatial planning system and supervise its implementation, and integrate spatial planning such as major functional area planning, land use planning, urban and rural planning, etc. In order to achieve unified land and space planning, to achieve "multiple planning in one", and to strengthen the guiding and restrictive role of land and space planning on various special plans, it is the Party Central Committee, Major deployment made by the State Council. The "One Picture" implementation supervision information system for land and space planning is to establish a land and space planning system and supervise the implementation. The important technical support for implementation, based on new technologies and new methods, provides full-cycle management for the preparation, approval, revision and implementation of supervision of land and space planning Information technology support lays the foundation for creating smart planning that is perceivable, learnable, good governance and adaptive. In order to standardize the construction of the “one map” of the national land and space planning, the construction of the supervision information system was implemented, and the planning practice based on the “one map” of the land and space planning Implement a supervision system and formulate this document. "One Picture" Implementation Supervision of Land and Space Planning Information System Technical Specifications

1 Scope

This document specifies the overall requirements, data requirements, functional requirements, and environmental requirements for the implementation of the “One Picture” Supervision Information System for National Land and Spatial Planning. Summing and safe operation and maintenance requirements. This document is applicable to the construction and management of the "one map" implementation supervision information system of national, provincial, municipal, and county territorial and spatial planning.

2 Normative references

The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 22239 Information Security Technology Network Security Level Protection Basic Requirements GB/T 25070 Information Security Technology Network Security Level Protection Security Design Technical Requirements GB/T 28827.1 Information Technology Service Operation and Maintenance Part 1.General Requirements GB/T 33453-2016 Basic Geographic Information Database Construction Specification

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Basicspatialinformationplatform In accordance with the principle of “co-construction, sharing, interconnection, and sharing”, the integration, integration and unified management of various types of land and space data and information at all levels is a unified operation. Encourage the responsibilities of the owner of all natural resources and assets of the whole people, uniformly exercise all land and space use control and ecological protection and restoration responsibilities, and enhance the land The space governance system and modernization level of governance capabilities provide infrastructure for basic services, data services, special services and business application services. 3.2 "Inteplan"ofspatialplanning "Inteplan"ofspatialplanning Based on the basic geographic information and natural resource survey and monitoring results data, the unified national surveying and mapping benchmarks and surveying and mapping systems are applied to integrate Integrate the current status data required for the preparation and implementation of land and space planning, the results data of land and space planning at all levels, and the actual land and space planning. Implementation of supervision data, the formation of a comprehensive, dynamic update, authoritative and unified land and space planning data resource system. 3.3 Land and Space Planning "One Picture" Implementation Supervision Information System'Inteplan'informationsystemforimplementationand supervisionofspatialplanning Based on the basic territorial and spatial information platform (3.1), construct a “map” (3.2) of territorial and spatial planning to prepare, approve, and approve territorial and spatial planning. Revise and implement the information system that supervises and provides technical support.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39972-2021_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39972-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39972-2021_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39972-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.