GB/T 38174-2019 English PDFUS$1704.00 · In stock
Delivery: <= 11 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 38174-2019: Wind energy generation systems - Availability for wind power stations Status: Valid
Basic dataStandard ID: GB/T 38174-2019 (GB/T38174-2019)Description (Translated English): Wind energy generation systems - Availability for wind power stations Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F11 Classification of International Standard: 27.180 Word Count Estimation: 90,983 Date of Issue: 2019-10-18 Date of Implementation: 2020-05-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 38174-2019: Wind energy generation systems - Availability for wind power stations---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Wind energy generation systems-Availability for wind power stations ICS 27.180 F11 National Standards of People's Republic of China Wind power generation system availability (IEC /T S61400-26-3..2016, Windenergygenerationsystems- Part 26-3. Availability for windpowerstations, IDT) Published on October 18,.2019 2020-05-01 implementation State Administration of Market Supervision Published by China National Standardization Administration ContentsForeword I Introduction III 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 1 3.1 Terms and definitions 1 3.2 Abbreviations of available information 3 3.3 Acronyms of unavailable information 5 4 Wind farm information model 5 4.1 Overview 5 4.2 Service 7 4.3 Information Category Priority 8 4.4 Information model for supporting facilities of wind farms 8 5 Information available (wind farm) 8 5.1 Overview 8 5.2 Operation 9 5.3 In service 10 5.4 No service 12 5.5 Non-Run 14 5.6 Force Majeure 17 6 Unavailable information 18 Appendix A (informative) List of entry and exit conditions 19 Appendix B (Informative) Application Scenarios-Example 20 Appendix C (informative) Supporting facilities for wind farms 29 Appendix D (informative) Determination of potential output of wind farms --- Example 31 Appendix E (informative) Service output availability index-example 32 Schedule F (informative) Example of optional information category of level 5 38 References 84ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard uses the translation method equivalent to IEC /T S61400-26-3..2016 "Wind Power Generation System Part 26-3. Wind Farms Availability ". The Chinese documents that have a consistent correspondence with the international documents referenced normatively in this standard are as follows. --- GB/T 2900 (all parts) Electrical term [IEC 60050 (all parts)] --- GB/T 2900.53-2001 Electrical terminology for wind turbines (idtIEC 60050-415..1999) The following editorial changes have been made to this standard. --- According to the standard content, correct the following information in IEC /T S61400-26-3 "3.2 Abbreviations of available information". ● "IAPP" is corrected to "IASP"; ● "IAPA" is corrected to "IASA"; ● "IAOPA" corrected to "IAOSA"; ● "IAOPP" is corrected to "IAOSP"; ● "IAOSPA" is corrected to "IAOSSA"; ● "IAOSPP" corrected to "IAOSSP"; ● "IAOSFPPA" was corrected to "IAOSFPSA"; ● "IAOSFPPP" corrected to "IAOSFPSP"; ● "IAOSPPPA" was corrected to "IAOSPPSA"; ● "IAOSPPPP" corrected to "IAOSPPSP"; ● "IAOSPPDRPA" was corrected to "IAOSPPDRSA"; ● "IAOSPPDRPP" was corrected to "IAOSPPDRSP"; ● "IAOSPPDGPA" was corrected to "IAOSPPDGSA"; ● "IAOSPPDGPP" is corrected to "IAOSPPDGSP"; ● "IAOSRSPA" is corrected to "IAOSRSSA"; ● "IAOSRSPP" corrected to "IAOSRSSP"; ● "IAOOSPA" was corrected to "IAOOSSA"; ● "IAOOSPP" is corrected to "IAOOSSP"; ● "IAOOSTSPA" is corrected to "IAOOSTSSA"; ● "IAOOSTSPP" corrected to "IAOOSTSSP"; ● "IAOOSENPA" was corrected to "IAOOSENSA"; ● "IAOOSENPP" was corrected to "IAOOSENSP"; ● "IAOOSENCPA" is corrected to "IAOOSENCSA"; ● "IAOOSENCPP" corrected to "IAOOSENCSP"; ● "IAOOSENOPA" is corrected to "IAOOSENOSA"; ● "IAOOSENOPP" is corrected to "IAOOSENOSP"; ● "IAOOSELPA" was corrected to "IAOOSELSA"; ● "IAOOSELPP" corrected to "IAOOSELSP"; ● "IAOOSRSPA" was corrected to "IAOOSRSSA"; ● "IAOOSRSPP" corrected to "IAOOSRSSP"; ● "IANOPA" is corrected to "IANOSA"; ● "IANOPP" is corrected to "IANOSP"; ● "IANOSMPA" was corrected to "IANOSMSA"; ● "IANOSMPP" is corrected to "IANOSMSP"; ● "IANOPCAPA" is corrected to "IANOPCASA"; ● "IANOPCAPP" was corrected to "IANOPCASP"; ● "IANOFOPA" is corrected to "IANOFOSA"; ● "IANOFOPP" was corrected to "IANOFOSP"; ● "IANOSPA" was corrected to "IANOSSA"; ● "IANOSPP" is corrected to "IANOSSP"; ● "IAFMPA" is corrected to "IAFMSA"; ● "IAFMPP" is corrected to "IAFMSP". --- Increased the number of references. This standard is proposed by China Machinery Industry Federation. This standard is under the jurisdiction of the National Wind Machinery Standardization Technical Committee (SAC/TC50). This standard was drafted. Zhejiang Yunda Wind Power Co., Ltd., Hohhot Branch of China Academy of Agricultural Mechanization Science Co., Ltd. Division, Xinjiang Goldwind Technology Co., Ltd., Gamesa Wind Power (Tianjin) Co., Ltd., Longyuan Power Group Co., Ltd., China Hydroelectric Cheng Consulting Group Co., Ltd., China Three Gorges New Energy Co., Ltd., China Guangdong Nuclear Power Co., Ltd., China Resources Power Technology Research Institute Co., Ltd., Huaneng New Energy Co., Ltd. Zhejiang Branch, CEC Energy Wind Power Co., Ltd., Hebei Jiantou New Energy Co., Ltd., China Electric Power Research Institute Co., Ltd., Beijing Jianheng Certification Center Co., Ltd., China Classification Society Quality Certification Company, China Shipbuilding Industry Corporation Haizhuang Wind Power Co., Ltd., Vestas Wind Technology (China) Co., Ltd., Guangdong Wind Power Co., Ltd. The main drafters of this standard. Shi Xiaoming, Wang Jianping, Wang Qing, Xie Shengqing, Li Haoyuan, Ren Jing, Li Zhiyong, Li Yue, Liu Junqi, Peng Jiali, Wu Qiren, Shuai Zhengfeng, Ning Hongtao, Wang Tieqiang, Jin Dezhi, Xue Wenliang, Tan Jianxin, Xue Yang, Li Peng, Yuanye, Tang Juan, Chen Qiang, and Liu Donghai.IntroductionThis standard is intended for owners, power companies, creditors, operators, manufacturers, consultants, regulators, When the certification agencies, insurance companies and other related parties exchange information about the availability of wind farm indicators, a common foundation is established. During power generation and In the field of power transmission, a large number of interactive interfaces related to energy or information have emerged from many related parties. Figure 1 clarifies the relationship between power generation and asset management Related internal and external factors, and put forward a series of related terms. This standard provides the division of specific time periods by building an information model. Method for allocating different information categories. When calculating the availability of wind turbines, the model provides a basis for how to allocate time. Figure 1 Related parties of wind farm data In order to explain the availability, service life, maintenance, and maintenance interval standards of wind turbines and components, this standard defines wind Generic terms for power plant systems, environmental constraints, and calculations of energy availability measurements for wind turbines. Wind Turbines A group contains all the devices between it and the access point 1). The availability is related to the time and/or power generation of the wind turbine, and at the same time Taking environmental factors into consideration. These environmental factors include wind and other weather conditions, as well as the state of the power grid and substations. In addition, this standard also Provides the terminology required for performance indicators related to the availability of wind turbine power generation. In this standard, basic information categories are indicated by double quotation marks, and optional information categories are indicated in bold. 1) See IEC 60050-415..1999,415-04-01 for definitions. Wind power generation system availability1 ScopeThis standard provides a calculation framework for the time availability and service output availability performance indicators of wind farms, and describes the data categories. Method, and an example of applying the data to calculate the availability index is given. This standard applies the terms and definitions in GB /Z 35482-2017 and GB /Z 35483-2017 models to wind farms. The basic method of this standard is to assume that the entire wind farm can be modeled as a single wind turbine to represent the entire wind farm. The wind farm is an aggregate of all wind turbines, functional services and supporting facilities of the wind farm at the grid connection point. The purpose of this standard is not to specify calculation methods for time availability and service output availability, nor to measure power curve performance. Provide evidence; see IEC 61400-12 for power curve measurements. However, its appendix should provide detailed examples and instructions for the calculation method of the availability index. south. The informative appendix of this standard includes. ● Examples of extending the model to more services; ● Examples of wind farm information categories; ● Examples of extending the model to supporting facilities of wind farms; ● Calculation example of service output loss; ● Example of service output availability algorithm; ● Examples of other availability indicators; ● Application examples.2 Normative referencesThe following documents are essential for the application of this document. For dated references, only the dated version applies to this article Pieces. For undated references, the latest version (including all amendments) applies to this document. GB /Z 35482-2017 Time availability of wind turbines (IEC /T S61400-26-1..2011, IDT) GB /Z 35483-2017 wind turbine generating capacity availability (IEC /T S61400-26-2..2014, IDT) IEC 60050 (all parts) International electrotechnical vocabulary IEC 60050-415 International Electrotechnical Vocabulary Part 415. Wind Power Generation System (Internationalelectrotechnicalvo- cabulary-Part 415. Windturbinegeneratorsystems) 3 Terms, definitions and abbreviations 3.1 Terms and definitions The terms and definitions defined in GB /Z 35482-2017, GB /Z 35483-2017 and IEC 60050-415 and the following apply to this file. 3.1.1 Actual service Measurements of actual service at a wind farm connection point. Note. Actual output can only be classified as a measurable service. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 38174-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 38174-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 7 ~ 11 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 38174-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 38174-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |