Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 37911.2-2019 PDF English

US$279.00 · In stock · Download in 9 seconds
GB/T 37911.2-2019: Application interface of BDS timing for power system -- Part 2: Testing specification
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 37911.2-2019279 Add to Cart 3 days Application interface of BDS timing for power system -- Part 2: Testing specification Valid

Similar standards

JT/T 808   JT/T 1078   GB/T 19392   GB/T 14733.10   

GB/T 37911.2-2019: Application interface of BDS timing for power system -- Part 2: Testing specification


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT37911.2-2019
(Power system Beidou satellite timing application interface Part 2. Inspection specifications) ICS 33.200 M50 National Standards of People's Republic of China Power system Beidou satellite timing application interface Part 2. Test Specifications ApplicationinterfaceofBDStimingforpowersystem- Part 2. Testing specification Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued Content Foreword I Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 3 5 Composition 3 5.1 Overview 3 5.2 Beidou satellite timing time synchronization device composition 3 5.3 Beidou satellite timing application interface composition 4 6 Testing requirements 4 6.1 Environmental conditions 4 6.2 Test Equipment 5 7 Test Method 6 7.1 Test principle 6 7.2 Interface Test 6 7.3 Functional Test 8 7.4 Environmental Test 9 7.5 Power Adaptation Test 9 7.6 Insulation performance test 9 7.7 Mechanical performance test 10 7.8 Electromagnetic Compatibility Test 10

Foreword

GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts. --- Part 1. Technical specifications; --- Part 2. Test specifications. This part is the second part of GB/T 37911. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China. This section drafted by. China Electric Power Research Institute, National Electric Power Dispatch and Communication Center, State Grid Electric Power Research Institute, North China Electric Power Engineering Co., Ltd., China Electronics Technology Standardization Institute, Beijing Sifang Jibao Automation Co., Ltd., Zhengzhou Wickham Technology Co., Ltd. Co., Ltd., Wuhan Zhongyuan Huadian Technology Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Shandong Kehui Power Automation Unit Co., Ltd., Xuchang Kaipu Electrical Testing Technology Co., Ltd., Guodian NARI Technology Co., Ltd. The main drafters of this section. Lu Tianjian, Nan Guilin, Shi Yuxiang, Zhang Daonong, Chen Qian, Hu Wei, Yang Yuqing, Deng Zhigang, Liu Lin, Wang Junyong, Yu Yuehai, Wu Shuqin, Dong Yantao, He Chun, Xiong Chunhui, Han Shijie, Xu Zhijing, Yang Wei, Li Jinsong.

introduction

The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface. Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis Level, adapt to the needs of the development of China's power system. Power system Beidou satellite timing application interface Part 2. Test Specifications

1 Scope

This part of GB/T 37911 specifies the group of the power system Beidou satellite timing application interface and the Beidou satellite timing time synchronization device. Formation, testing requirements, test methods, etc. This part is applicable to the detection of the Beidou satellite timing application interface of the power system and the Beidou satellite timing time synchronization device.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2887-2011 General specification for computer sites GB/T 9361-2011 Computer Site Safety Requirements GB/T 13729-2002 Telecontrol terminal equipment GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test GB/T 17626.6-2017 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test GB/T 17626.9-2011 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test GB/T 17626.10-2017 Electromagnetic compatibility test and measurement technique Damping oscillating magnetic field immunity test GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology ringing wave immunity test GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and Immunity test for voltage changes GB/T 19391-2003 Global Positioning System (GPS) terms and definitions GB/T 26866-2011 Time synchronization system test specification for power systems GB/T 37911.1-2019 Power system Beidou satellite timing application interface Part 1. Technical specifications DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification

3 Terms and definitions

The following terms and definitions as defined in GB/T 19391-2003 and DL/T 1100.1-2018 apply to this document. For convenience For use, some of the terms and definitions in GB/T 19391-2003 and DL/T 1100.1-2018 are repeated below. 3.1 Coordinated Universal Time universaltimecoordinated; UTC World time is used as the initial reference for time, and atomic time is used as the standard time based on time unit (s). [GB/T 19391-2003, definition 5.3] GB/T 37911.2-2019 (Power system Beidou satellite timing application interface Part 2. Inspection specifications) ICS 33.200 M50 National Standards of People's Republic of China Power system Beidou satellite timing application interface Part 2. Test Specifications ApplicationinterfaceofBDStimingforpowersystem- Part 2. Testing specification Published on.2019-08-30 2020-03-01 implementation State market supervision and administration China National Standardization Administration issued Content Foreword I Introduction II 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 3 5 Composition 3 5.1 Overview 3 5.2 Beidou satellite timing time synchronization device composition 3 5.3 Beidou satellite timing application interface composition 4 6 Testing requirements 4 6.1 Environmental conditions 4 6.2 Test Equipment 5 7 Test Method 6 7.1 Test principle 6 7.2 Interface Test 6 7.3 Functional Test 8 7.4 Environmental Test 9 7.5 Power Adaptation Test 9 7.6 Insulation performance test 9 7.7 Mechanical performance test 10 7.8 Electromagnetic Compatibility Test 10

Foreword

GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is divided into the following two parts. --- Part 1. Technical specifications; --- Part 2. Test specifications. This part is the second part of GB/T 37911. This part is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This part is proposed and managed by the Ministry of Industry and Information Technology of the People's Republic of China. This section drafted by. China Electric Power Research Institute, National Electric Power Dispatch and Communication Center, State Grid Electric Power Research Institute, North China Electric Power Engineering Co., Ltd., China Electronics Technology Standardization Institute, Beijing Sifang Jibao Automation Co., Ltd., Zhengzhou Wickham Technology Co., Ltd. Co., Ltd., Wuhan Zhongyuan Huadian Technology Co., Ltd., China Southern Power Grid Super High Voltage Transmission Company, Shandong Kehui Power Automation Unit Co., Ltd., Xuchang Kaipu Electrical Testing Technology Co., Ltd., Guodian NARI Technology Co., Ltd. The main drafters of this section. Lu Tianjian, Nan Guilin, Shi Yuxiang, Zhang Daonong, Chen Qian, Hu Wei, Yang Yuqing, Deng Zhigang, Liu Lin, Wang Junyong, Yu Yuehai, Wu Shuqin, Dong Yantao, He Chun, Xiong Chunhui, Han Shijie, Xu Zhijing, Yang Wei, Li Jinsong.

introduction

The purpose of compiling GB/T 37911 "Power System Beidou Satellite Timing Application Interface" is to standardize the Beidou satellite navigation system as a standard The application of quasi-time source in China's power system, and clarify the technical requirements and detection methods of the power system for the Beidou satellite timing application interface. Multi-time source management of strong power systems to meet the needs of power system for time synchronization, improve power system security and stability control and accident analysis Level, adapt to the needs of the development of China's power system. Power system Beidou satellite timing application interface Part 2. Test Specifications

1 Scope

This part of GB/T 37911 specifies the group of the power system Beidou satellite timing application interface and the Beidou satellite timing time synchronization device. Formation, testing requirements, test methods, etc. This part is applicable to the detection of the Beidou satellite timing application interface of the power system and the Beidou satellite timing time synchronization device.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2887-2011 General specification for computer sites GB/T 9361-2011 Computer Site Safety Requirements GB/T 13729-2002 Telecontrol terminal equipment GB/T 17626.2-2018 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test GB/T 17626.4-2018 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test GB/T 17626.6-2017 Electromagnetic compatibility test and measurement technology Conducted disturbance immunity of RF field induction GB/T 17626.8-2006 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test GB/T 17626.9-2011 Electromagnetic compatibility test and measurement technology Pulse magnetic field immunity test GB/T 17626.10-2017 Electromagnetic compatibility test and measurement technique Damping oscillating magnetic field immunity test GB/T 17626.12-2013 Electromagnetic compatibility test and measurement technology ringing wave immunity test GB/T 17626.29-2006 Electromagnetic compatibility test and measurement technology DC power input port voltage dip, short interruption and Immunity test for voltage changes GB/T 19391-2003 Global Positioning System (GPS) terms and definitions GB/T 26866-2011 Time synchronization system test specification for power systems GB/T 37911.1-2019 Power system Beidou satellite timing application interface Part 1. Technical specifications DL/T 1100.1-2018 Time synchronization systems for power systems - Part 1. Technical specification

3 Terms and definitions

The following terms and definitions as defined in GB/T 19391-2003 and DL/T 1100.1-2018 apply to this document. For convenience For use, some of the terms and definitions in GB/T 19391-2003 and DL/T 1100.1-2018 are repeated below. 3.1 Coordinated Universal Time universaltimecoordinated; UTC World time is used as the initial reference for time, and atomic time is used as the standard time based on time unit (s). [GB/T 19391-2003, definition 5.3] ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 37911.2-2019 be delivered?Answer: The full copy PDF of English version of GB/T 37911.2-2019 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 37911.2-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37911.2-2019_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 37911.2-2019 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 37911.2-2019?

A step-by-step guide to download PDF of GB/T 37911.2-2019_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 37911.2-2019".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9