Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 37458-2019 English PDF

US$759.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37458-2019: Guidelines for traffic safety evaluation of suburban arterial roads
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 37458-2019759 Add to Cart 6 days Guidelines for traffic safety evaluation of suburban arterial roads Valid

Similar standards

GB/T 39898   GB 38900   GB/T 38044   GB/T 45605   GB 45248   

Basic data

Standard ID: GB/T 37458-2019 (GB/T37458-2019)
Description (Translated English): Guidelines for traffic safety evaluation of suburban arterial roads
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: R80
Classification of International Standard: 93.080
Word Count Estimation: 38,366
Date of Issue: 2019-05-10
Date of Implementation: 2019-12-01
Quoted Standard: GB 5768.1; GB 5768.2; GB 5768.3; GB 50688; CJJ 37; CJJ 193; JTG B01; JTG B05-2015; JTG D20; JTG D81
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration
Summary: This standard specifies the general provisions for traffic safety evaluation of suburban arterial roads, as well as the basic requirements, evaluation methods and evaluation contents for traffic safety evaluation in the stages of design, delivery acceptance, and operation. This standard is applicable to the traffic safety evaluation of suburban arterial roads, and other road traffic safety evaluations can be implemented by reference.

GB/T 37458-2019: Guidelines for traffic safety evaluation of suburban arterial roads

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for traffic safety evaluation of suburban arterial roads ICS 93.080 R80 National Standards of People's Republic of China Suburban trunk road traffic safety evaluation guide Published on.2019-05-10 2019-12-01 implementation State market supervision and administration China National Standardization Administration issued

Content

Foreword I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General Provision 1 5 Design Stage Traffic Safety Assessment 2 5.1 Basic requirements 2 5.2 Evaluation Method 2 5.3 Basic information 2 5.4 Overall Evaluation 2 5.5 Design element evaluation 2 5.6 Evaluation Conclusion 8 6 Traffic safety assessment during the acceptance and acceptance stage 8 6.1 Basic requirements 8 6.2 Evaluation Method 9 6.3 Basic information 9 6.4 Overall rating 9 6.5 Evaluation of safety factors 9 6.6 Evaluation conclusion 14 7 Operational Stage Traffic Safety Assessment 14 7.1 Basic requirements 14 7.2 Evaluation method 14 7.3 Basic information 14 7.4 Traffic Accident Analysis 14 7.5 Overall evaluation 15 7.6 Evaluation of safety factors 15 7.7 Evaluation conclusion 20 Appendix A (informative appendix) Evaluation Process 21 Appendix B (informative) List of evaluation contents 22 Appendix C (informative) Evaluation Report Format 31 Reference 35

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the Ministry of Public Security of the People's Republic This standard is under the jurisdiction of the National Road Traffic Management Standardization Technical Committee (SAC/TC576). This standard is drafted by. Ministry of Public Security Traffic Management Science Research Institute. Participated in the drafting of this standard. Zhejiang Transportation Planning and Design Institute, Tongji University, Southeast University, Ningbo Municipal Public Security Bureau Traffic Police Check the bureau. The main drafters of this standard. Ma Zhaoyou, Yu Chunjun, Liu Yonghui, Wang Junxi, Guo Xiucheng, Li Pingfan, Shi Binfeng, Liu Shuo, Deng Yiping, Shi Yifeng, Wang Lizhen, Zhang Xiaotian, Gu Jingang, Zhao Yujuan, Sun Xiuping, Guo Min. Suburban trunk road traffic safety evaluation guide

1 Scope

This standard stipulates the general provisions for traffic safety evaluation of suburban trunk roads, as well as traffic safety during the stages of design, delivery acceptance, and operation. Basic requirements for evaluation, evaluation methods, and evaluation contents. This standard is applicable to the traffic safety evaluation of the urban trunk roads. Other road traffic safety evaluations can be referred to.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 5768.1 Road traffic signs and markings - Part 1. General GB 5768.2 Road traffic signs and markings - Part 2. Road traffic signs Road traffic signs and markings - Part 3. Road traffic markings GB 50688 Design code for urban road traffic facilities CJJ37 Urban Road Engineering Design Specification CJJ193 Urban Road Route Design Specification JTGB 01 Highway Engineering Technical Standard JTGB 05-2015 Highway Project Safety Evaluation Specification JTGD20 Highway Route Design Specification JTGD81 Highway Traffic Safety Facilities Design Code

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Suburbanarterialroad The main roads that have both road and urban road functions, including primary roads, secondary roads, urban expressways, trunk roads, and secondary trunks. Road and so on. 3.2 Traffic safety evaluation trafficsafetyevaluation Predict or evaluate the inherent or potential hazards of the transportation system, centered on road user safety.

4 General regulations

4.1 Traffic safety assessment of suburban trunk roads should analyze potential problems affecting traffic safety from road conditions, traffic facilities, traffic organization, etc. Promote the improvement of traffic safety conditions. 4.2 The traffic safety evaluation of the urban trunk roads is carried out according to the process shown in Appendix A. 4.3 The traffic safety assessment of suburban trunk roads should cover but not be limited to the contents of Appendix B.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 37458-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 37458-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 37458-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37458-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.