| GB/T 36718-2018 English PDFUS$199.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36718-2018: General principles for energy conservation assessment -- Alumina project Status: Valid 
 Basic dataStandard ID: GB/T 36718-2018 (GB/T36718-2018)Description (Translated English): General principles for energy conservation assessment -- Alumina project Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F01 Classification of International Standard: 27.010 Word Count Estimation: 10,166 Date of Issue: 2018-09-17 Date of Implementation: 2019-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 36718-2018: General principles for energy conservation assessment -- Alumina project---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.General principles for energy conservation assessment - Alumina project ICS 27.010 F01 National Standards of People's Republic of China Energy Conservation Assessment Technical Guidelines Alumina Project Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Energy Foundation and Management Standardization Technical Committee (SAC/TC20). This standard was drafted. China International Engineering Consulting Co., Ltd., China National Institute of Standardization, National Electric Investment Group Shanxi Aluminum Co., Ltd. Division, Shenyang Aluminum and Magnesium Design and Research Institute Co., Ltd. The main drafters of this standard. Zhang Yingjian, Yan Shufang, Xu Chunfang, Chen Haihong, Liu Meng, Wei Wei, Yang Lan. Energy Conservation Assessment Technical Guidelines Alumina Project1 ScopeThis standard specifies the content and requirements for energy conservation assessment of alumina projects. This standard is applicable to the energy conservation assessment of new or modified or expanded bauxite production metallurgical grade alumina projects, and other alumina technical transformation projects. Can refer to the implementation.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 2589 General rules for comprehensive energy consumption calculation GB/T 3484 Enterprise Energy Balance General GB 17167 Energy-using unit energy metering equipment management and general rules GB/T 23331 Energy Management System Requirements GB 25327 Alumina unit product energy consumption limit GB/T 28749 enterprise energy balance network diagram drawing method GB/T 28751 Enterprise Energy Balance Table Preparation Method GB/T 31341 Energy Conservation Assessment Technical Guidelines YS/T 126 alumina production special equipment energy consumption grade HJ473 Cleaner Production Standard Alumina Industry3 Terms and definitionsThe terms and definitions defined in GB 25327 and GB/T 31341 apply to this document.4 Energy conservation assessment content and requirements4.1 Preparation 4.1.1 Determining the scope of assessment The scope of energy conservation assessment should be consistent with the scope of investment construction, and should reflect the integrity of the project, covering energy purchase storage, processing conversion, and transportation. The entire process of distribution and terminal use. When the project relies on the construction of existing facilities, the relevant energy use of existing facilities should also be included in the scope of assessment. The organization undertaking the energy conservation assessment shall fully communicate with the project construction unit, clarify the boundary of the energy use system of the project, and determine the scope of energy conservation assessment. 4.1.2 Collecting basic information Collect basic data of alumina projects, including. a) Basic situation of the construction unit. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36718-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36718-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 36718-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36718-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |