GB/T 36674-2018: General technical requirements for the energy construction monitoring system in public institutions
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 36674-2018759 Add to Cart 6 days General technical requirements for the energy construction monitoring system in public institutions Valid

Similar standards

GB 36893   GB 37478   GB 37479   GB 17167   GB/T 36675   

Basic data

Standard ID: GB/T 36674-2018 (GB/T36674-2018)
Description (Translated English): General technical requirements for the energy construction monitoring system in public institutions
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F01
Classification of International Standard: 27.010
Word Count Estimation: 38,334
Date of Issue: 2018-09-17
Date of Implementation: 2019-04-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 36674-2018: General technical requirements for the energy construction monitoring system in public institutions


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General technical requirements for the energy construction monitoring system in public institutions ICS 27.010 F01 National Standards of People's Republic of China General technical requirements for public institution energy consumption monitoring systems Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 energy monitoring system 1 4.1 Energy consumption monitoring object 1 4.2 System Architecture 2 4.3 On-site measurement and monitoring subsystem 2 4.3.1 Equipped with energy management equipment 2 4.3.2 Functional requirements for the metrology and monitoring subsystem 3 4.4 Data Acquisition Subsystem 3 4.5 Information Management Subsystem 3 4.5.1 Overview 3 4.5.2 Basic software 3 4.5.3 Application Software 3 4.5.4 Basic Hardware 3 5 Data indicator 3 5.1 Indicator Item Requirements 3 5.1.1 Basic indicator 3 5.1.2 Energy efficiency indicators and economic and technical indicators 3 5.2 Basic situation data collection indicators 4 5.2.1 Overview 4 5.2.2 Basic item 4 5.2.3 Additional item 4 5.3 Energy consumption data collection indicator 4 5.3.1 Classification energy consumption 4 5.3.2 Sub-item power consumption 5 5.3.3 Sub-item water consumption 5 5.3.4 Sub-item gas consumption 5 5.3.5 Sub-renewable energy consumption 5 6 Data Acquisition 5 6.1 Raw Data Collection 5 6.2 Collection method 5 6.2.1 Overview 5 6.2.2 Online Reporting Method 6 6.2.3 Online monitoring mode 6 6.2.4 Sharing data with other system platforms 6 6.3 Acquisition equipment 6 6.3.1 System Connection Mode 6 6.3.2 Data Collector Function 6 6.3.3 Performance of the data collector 7 6.3.4 Electromagnetic compatibility 8 7 data transmission 8 7.1 Transmission between metering device and data collector 8 7.2 Transmission between the data collector and the relevant platform 8 7.3 Index data transmission between platforms 9 7.4 Data Transfer Network Security 9 7.5 Timeout retransmission mechanism 9 8 Information Management Platform 9 8.1 Overview 9 8.2 System Platform Features 9 8.2.1 Energy consumption monitoring and energy consumption data analysis 9 8.2.2 Energy Conservation Assessment and Supervision 10 8.2.3 Analysis of energy saving potential 10 8.2.4 Energy Saving Forecasting and Warning 10 8.2.5 Statistical analysis of energy consumption and water consumption and report management 11 8.2.6 Carbon Emission Analysis 11 8.2.7 Energy Control Management 11 8.3 Date and Time Management 13 8.4 Public Service 13 8.5 External environmental factors data 13 8.6 User Management 13 8.7 Information System Maintenance 14 8.8 Data Quality Assurance 14 9 Information System Security 14 9.1 System Platform Security 14 9.2 Data Security between Data Collector and Related Platforms 14 9.3 Data Storage Security 14 Appendix A (informative) Public institution infrastructure, energy efficiency and economic and technical indicators 15 Appendix B (informative) ubiquitous green community control network protocol for ISO /IEC /IEEE18880 17 B.1 Ubiquitous Green Community Control Network Architecture 17 B.1.1 Networking Architecture 17 B.1.2 System Model and Deployment 17 B.1.3 Control objects and point identification 18 B.2 Ubiquitous Green Community Control Network Protocol Architecture 19 B.2.1 Communication Protocol 19 B.2.2 Application Interface API 22 B.2.3 Data structure 26 B.2.4 Protocol Binding 34

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and managed by the National Energy Foundation and Management Standardization Technical Committee (SAC/TC20). This standard was drafted. China National Institute of Standardization, Guangdong Youhua IOT Intelligent Control Technology Co., Ltd., Yantai Oriental Energy Technology Company, Anhui Antai Technology Co., Ltd., China Telecom Co., Ltd., China Academy of Building Research Ltd., Landwell (Beijing) Yun Energy Technology Co., Ltd., Great Wall Computer Software and Systems Co., Ltd., Beijing Taihao Intelligent Engineering Co., Ltd., Beijing Hexin Yunda Technology Co., Ltd., Beijing Construction Technology Development Co., Ltd., Beijing Huadian Zhongxin Technology Co., Ltd., Wuhan Apa Technology Ltd., Shandong Energy Conservation Association, Beijing University of Science and Technology, Shenzhen Haiyida Technology Co., Ltd. The main drafters of this standard. Sun Liang, Lin Biao, Nie Min, Ren Zhiyuan, Zhu Weiping, Yu Zhen, Lu Hang, Wang Yinping, Xu Jiantang, Zhu Ping, Dong Shiyun, Liu Caifeng, Tang Xiaoming, Tian Haitao, Peng Jie, Zhao Jie, Li Huai, Gao Caifeng, Li Wei, Pan Chongchao, He Yucheng. General technical requirements for public institution energy consumption monitoring systems

1 Scope

This standard specifies the structure of the public institution energy consumption monitoring system, basic data definition requirements, data collection requirements, data transmission requirements, letters Content management system construction, functions and security requirements. This standard applies to public institutions to establish and rebuild energy monitoring systems.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 9254-2008 Radio disturbance limits and methods of measurement for information technology equipment GB 17167 Energy-using unit energy metering equipment management and general rules GB/T 17618-2015 Information technology equipment immunity limits and methods of measurement GB/T 17626.2-2006 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.3-2016 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test GB/T 17626.4-2008 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test GB/T 17626.5-2008 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test GB/T 19582.1 Industrial automation network specification based on Modbus protocol Part 1. Modbus application protocol GB/T 22239 Information Security Technology Information System Security Level Protection Basic Requirements GB/T 29149 Public institution energy resource measurement equipment provision and management requirements GB 50034 Architectural Lighting Design Standard CJ/T 188 household metering data transmission technical conditions DL/T 645 Multi-function Energy Meter Communication Protocol GA/T 390 Computer Information System Security Level Protection General Technical Requirements

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Public institution publicinstitutions State organs, institutions, and organizations that use financial funds in whole or in part.

4 energy monitoring system

4.1 Energy consumption monitoring object According to the size and energy characteristics of public institutions, energy consumption monitoring objects are classified. a) State organs; b) education; c) technology; d) culture; e) health; f) sports; g) group organization; h) Other. Others refer to objects other than the seven types of public institutions mentioned above. 4.2 System Architecture The energy consumption monitoring system architecture should include on-site measurement and monitoring subsystems, data acquisition subsystems, and information management subsystems. As shown in Figure 1. Figure 1 Architecture diagram of public institution energy consumption monitoring system Public institution energy consumption monitoring system should have energy saving plan, energy metering management, energy monitoring, energy consumption analysis, data reporting, and key energy use. Equipment energy management and other functions. 4.3 On-site measurement and monitoring subsystem 4.3.1 Equipment and management of energy metering equipment Energy metering equipment provisioning and management requirements include but are not limited to. a) Equipped with energy measuring instruments for the total energy ingress and energy nodes and key energy-using equipment to realize digital reading and remote transmission of energy data. Yes, the measurement accuracy level should meet the requirements of GB 17167 and GB/T 29149; b) Prepare the calibration and calibration plan of the source measuring instrument, and periodically check and calibrate the measuring instrument by the relevant qualification department (personnel). Ensure the accuracy of energy metering devices; c) Establish a sound measurement management system, clarify job responsibilities, organize training of energy measurement instruments, and improve energy measurement Data foundation management capabilities, standardizing energy measurement management systems. 4.3.2 Functional requirements for metering and monitoring subsystems The on-site metering and monitoring system measures, monitors and manages energy use. For electricity, water, gas, coal, oil and other forms Energy consumption is monitored to enable automatic collection and upload of energy usage data. 4.4 Data Acquisition Subsystem A special device for energy consumption data collection using an embedded microcomputer system, which should have data acquisition, data processing, data storage, and number According to the functions of transmission and on-site equipment operation status monitoring and fault diagnosis, it has a mainstream data transmission interface. 4.5 Information Management Subsystem 4.5.1 Overview The information management subsystem realizes centralized control of energy management through basic software, application software, and basic hardware construction. 4.5.2 Basic software The public institution energy consumption monitoring system realizes the basis of data collection, transmission and storage, and completes system monitoring, data analysis, processing and Prerequisites for processing. Should include network supervision software, operating system, development tool software, backup software, remote operation and maintenance software, real-time Database, operator station monitoring software, server platform software, server driver, web publishing client authorization, field operating station software, real-time Library client authorization software and interface software for interfacing with other energy information systems. 4.5.3 Application Software The application software system developed on the basis of the basic software, the public institution adopts different application software systems according to the type characteristics. Should be The following requirements are met. First, the monitoring system collects the real-time data of different energy media collected and presents the real-time deployment of the human-machine community. Second; the second is the basic energy management system, energy planning management, energy dispatch management, energy use process management, energy metering management, energy consumption According to statistical analysis, energy performance management assessment, energy cost accounting, etc.; third is the operation and maintenance system, data collection of public institution energy consumption monitoring system The set, network support, basic and application software systems are the whole of synchronous operation, relying on the operation and maintenance system to ensure the overall continuous and stable operation. 4.5.4 Basic hardware The basis for constructing a public institution energy monitoring system should include computer equipment, communication equipment, network security equipment, communication lines, and Infrastructure construction such as air conditioning and power systems and security systems.

5 data indicators

5.1 Indicator item requirements 5.1.1 Basic indicators The basic indicator defines the consumption index of the energy consumption unit. This indicator should be used in conjunction with a certain statistical period (time range). It can also be used as a summary of the energy-using units (object range) in a statistical range of a certain type or a specified area. For specific indicators, please refer to Record A in Table A.1. 5.1.2 Energy efficiency indicators and economic and technical indicators See Table A.2 for energy efficiency indicators and economic and technical indicators for public institutions. 5.2 Basic situation data collection indicators 5.2.1 Overview The basic data collection indicators of public institutions are divided into basic items and additional items according to the scale, function and energy consumption characteristics. 5.2.2 Basic items The basic items are the basic conditions of the size and function of the public institution. The basic items of the 8 types of objects include the name, address, construction age, Building number, function, total area, air conditioning area, heating area, air conditioning system form, heating system form, building structure form, building exterior wall material Material form, building exterior wall insulation form, building exterior window type, building glass type, window frame material type, economic indicators (electricity price, water price, gas price, Hot price), date of completion, energy monitoring project acceptance date. 5.2.3 Additional items The additional items are basic situation data that distinguishes the characteristics of the energy consumption of public institutions. The additional items of the eight types of objects include. a) State organs. number of office workers; b) Education. number of students in the school; c) Science and technology. number of scientific research; d) Culture. number of visitors to the theaters and exhibition halls; e) Health. hospital grade, hospital category (specialty hospital or general hospital), number of visits, number of beds; f) Sports. the traffic volume or attendance rate of the stadium; g) Group organization. number of community services, etc.; h) Other. Basic data of energy-using units that are distinguished from the above seven categories of energy use characteristics in other public institutions. 5.3 Energy consumption data collection indicators 5.3.1 Classification energy consumption According to the energy consumption category of public institutions, the classification energy consumption data collection index is 15 items, including. a) electricity consumption; b) natural gas consumption; c) artificial gas consumption; d) central heating (cold) heat consumption (cold); e) steam (low pressure) consumption; f) coal consumption (anthracite, clean coal); g) LPG consumption; h) LNG consumption; i) gasoline consumption; j) kerosene consumption; k) diesel consumption; l) fuel oil consumption; m) water consumption; n) renewable energy consumption; o) Other energy applications. 5.3.2 Sub-item power consumption Among the sub-items of energy consumption, the electricity should be divided into four sub-items, including lighting socket electricity, air-conditioning electricity, power electricity and special electricity. 4 of electricity Item sub-items are mandatory items, and each sub-item can be flexibly subdivided into first-level sub-items and second-level sub-items according to the actual situation of the energy-using system. 5.3.3 Sub-item water consumption In the water use item, for domestic water supply (hand washing, flushing), car washing and road pouring, canteen, greening, heating and air conditioning, water, concentrated bathing, rain Water, water, solar hot water and other water should be metered separately. 5.3.4 Sub-item gas consumption In the gas classification, for other gas consumption such as canteens, boilers, direct combustion engines, etc., it should be metered separately. 5.3.5 Sub-renewable energy consumption In the renewable energy sub-item, for solar energy utilization and shallow geothermal utilization, it should be measured separately.

6 data collection

6.1 Raw data collection The original data collection refers to the energy classification, sub-item, household, and functional area measurement principles, and is divided into the following four aspects. a) Unit basic information Unit basic information is the basic basis for understanding and analyzing the energy consumption data of the unit. Each platform should be targeted according to its own business needs. Collect relevant basic information. The basic information should collect the following information. 1) Unit key identification information data; 2) For the unit type, regional jurisdiction, energy management department (college, education, text, health, body) and other classified attribution information data; 3) Static data for analysis of unit size (area, number of people, etc.); 4) Information data of the unit energy manager. b) Energy consumption data collection at the overall level of the energy unit Energy consumption data collection at the overall level of the energy unit should be based on the system business requirements to define which data to collect, usually should include The following two aspects of data. 1) The amount of physical energy actually consumed by the energy-using unit during the statistical reporting period shall be converted into tons according to the prescribed calculation methods and units. The sum after the standard coal; 2) Energy and energy efficiency (single consumption) of the main service or activity of the energy unit. c) Energy consumption data of key areas According to the different energy characteristics of science, culture, culture and health, the energy use behavior and energy efficiency carried by the key energy-using areas are targeted. According to collection, such as the machine room, boiler room and so on. d) Energy consumption data at key energy-consuming equipment levels The purpose of data collection by key energy-consuming equipment is to monitor and count key key energy-consuming devices (transformers, motors, fans, pumps, etc.) Use energy and energy efficiency. The platform can collect basic information data of key energy-consuming equipment for business needs, and count the number of various types of equipment. Energy consumption, elimination, and basic operational status information. 6.2 Collection method 6.2.1 Overview Energy consumption data collection methods for public institution energy consumption monitoring systems can include online reporting methods, online monitoring methods, and sharing with other platforms. Data method. 6.2.2 Online reporting method The data collected through online reporting includes public institution basic information, energy use data, and energy consumption and energy efficiency indicators, mainly Data collection indicators for basic units of energy units and other energy consumption data that cannot be monitored online, such as coal and gasoline consumed by energy units. Energy consumption such as diesel. 6.2.3 Online monitoring method Real-time acquisition by automatic metering device, real-time transmission to data transfer station or related platform through automatic transmis......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 36674-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 36674-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 36674-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36674-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.