| GB/T 36663-2018 English PDFUS$279.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36663-2018: Ships and marine technology - Ship's mooring and towing fittings - Closed chocks Status: Valid 
 Basic dataStandard ID: GB/T 36663-2018 (GB/T36663-2018)Description (Translated English): Ships and marine technology - Ship's mooring and towing fittings - Closed chocks Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: U21 Classification of International Standard: 47.020.50 Word Count Estimation: 14,194 Date of Issue: 2018-09-17 Date of Implementation: 2019-04-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 36663-2018: Ships and marine technology - Ship's mooring and towing fittings - Closed chocks---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Ships and marine technology - Ship's mooring and towing fittings - Closed chocks ICS 47.020.50 U21 National Standards of People's Republic of China Ship and offshore technology ship mooring and towing equipment Closed cable guide Closedchocks (ISO 13729.2012, IDT) Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard uses the translation method equivalent to ISO 13729.2012 "ship and marine technology ship mooring and towing equipment closed cable hole". This standard has made the following editorial changes. --- Added the informative Appendix NA to explain the mark. This standard is proposed and managed by the National Ship Armor Standardization Technical Committee (SAC/TC129). This standard was drafted. China Shipbuilding Industry Corporation, the 7th Fourth Institute. The main drafters of this standard. Deng Lijuan, Yang Longxia, Hu Fangzhen, Liu Lihong. Ship and offshore technology ship mooring and towing equipment Closed cable guide1 ScopeThis standard specifies the design, dimensions and technical requirements for closed cable guides for ship rope mooring and towing. This standard applies to the design, manufacture and acceptance of closed cable guide holes.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. IMOCircularMSC/Circ.1175 Boat Towing and Mooring Equipment Guide (Guidanceonshipboardtowingand Mooringequipment)3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Safe working load safeworkingload; SWL The maximum load that a mooring line is allowed to withstand under normal operating conditions, in kilohertz (kN).4 classification4.1 Type Closed guide holes are divided into the following two according to the installation position. ---A type. deck closed cable guide hole; ---B type. bulwark closed cable hole. 4.2 Nominal size The nominal size of the closed cable guide, L × H × D, represents the opening width, height and depth of the guide hole in millimeters. by The size of the closed type cable guides of Class A and Class B is the same, so for different safe working loads, the nominal size (L×H×D) is small according to D. The order is as follows. 250 ×.200 × 214, 300 × 250 × 286, 350 × 250 × 333, 400 × 250 × 381, 450 × 250 × 381, 500 × 250 × 381, 400 × 250 × 428, 450 × 250 × 428, 500 × 250 × 428, 500 × 400 × 428, 500 × 250 × 525A, 500 × 400 × 525 A, 500 × 250 × 525 B, 500 × 400 × 525 B.5 sizeThe dimensions and specifications of the closed cable guide holes are shown in Figure 1, Table 1, Figure 2 and Table 2. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36663-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36663-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 36663-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36663-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |