GB/T 36570-2018: Code of operation and maintenance of fire facilities for hydropower plant
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 36570-2018359 Add to Cart 4 days Code of operation and maintenance of fire facilities for hydropower plant Valid

Similar standards

DL/T 345   DL/T 805.4   DL/T 435   GB/T 43794   GB/T 37141.1   

Basic data

Standard ID: GB/T 36570-2018 (GB/T36570-2018)
Description (Translated English): Code of operation and maintenance of fire facilities for hydropower plant
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: F23
Classification of International Standard: 27.100
Word Count Estimation: 18,191
Date of Issue: 2018-09-17
Date of Implementation: 2019-04-01
Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration

GB/T 36570-2018: Code of operation and maintenance of fire facilities for hydropower plant

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Operation and maintenance procedures for fire protection facilities in hydropower plants) ICS 27.100 F23 National Standards of People's Republic of China Operation and maintenance procedures for fire protection facilities in hydropower plants Published on.2018-09-17 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic Provisions 1 5 Firefighting facilities run 2 6 Fire protection facilities maintenance 4 Appendix A (informative appendix) Reference table for fire alarm records of hydropower plants 9 Appendix B (informative appendix) Typical equipment fire treatment instruction table for hydropower plants 10 Appendix C (informative appendix) Reference table for maintenance of fire protection facilities in hydropower plants 12

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuing organization of this document is not responsible for identifying these patents. This standard is proposed and managed by the China Electricity Council. This standard was drafted. State Grid Xinyuan Holdings Co., Ltd., State Grid Xinyuan Holdings Co., Ltd. Technology Center, East China Tianhuangping Pumped Storage Limited Liability Company, East China Tongbai Pumped Storage Power Generation Co., Ltd., State Grid Xinyuan Holdings Co., Ltd. Beijing Shisanling Storage Power Plant, Dragon Beach Hydropower Development Co., Ltd. Longtan Hydropower Plant. The main drafters of this standard. Feng Yiping, Wang Yong, Li Qiang, Jin Genming, Jiang Weihai, Zhang Yawu, Zhang Zhengping, Liu Dianhai, Chang Yuhong, Yi Chuanbao, Lu Weiguo, Xiao Cixi, Li Jianguang, Zhang Liang, Fu Jiahui, Zhang Cheng, Chang Long, Wan Jingying, Zhang Chenghua. Operation and maintenance procedures for fire protection facilities in hydropower plants

1 Scope

This standard specifies the technical requirements for the operation and maintenance of fire protection facilities in hydropower plants. This standard applies to large and medium-sized hydropower plants (including pumped storage power plants).

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 5907.1 Fire vocabulary Part 1. General terms GB/T 5907.2 Fire Fighting Vocabulary Part 2. Fire Prevention GB/T 5907.3 Fire Fighting Vocabulary Part 3. Fire Fighting Rescue Maintenance and management of GB 25201 building fire protection facilities GB 50016 Building Design Fire Code GB 50444 Building Fire Extinguisher Configuration Acceptance and Inspection Specifications GB 50872 Hydropower Engineering Design Fire Protection Code GB 50974 Technical specification for fire water supply and fire hydrant systems GB 50987 Water Engineering Design Fire Protection Code GA95 fire extinguisher maintenance GA503 Building Fire Protection Facilities Testing Technical Regulations

3 Terms and definitions

The following terms and definitions as defined in GB/T 5907.1, GB/T 5907.2, GB/T 5907.3 apply to this document. 3.1 Hydroelectric power plant fire facilities firefacilitiesforhydropowerplant Fire protection systems and equipment for fire prevention, fire alarm, fire fighting and safe evacuation of hydropower plants (buildings) and production equipment. Note. including fire water supply system, automatic fire alarm system, automatic fire extinguishing system, fire hydrant system, smoke control system, fire separation system, emergency Broadcasting, emergency lighting and evacuation instructions, safe evacuation facilities, mobile fire equipment, etc.

4 Basic regulations

4.1 Hydroelectric power plants shall establish a fire safety responsibility system, formulate fire safety management systems, fire safety operation procedures, and fire extinguishing and response. Urgent evacuation plans and regular targeted fire drills. 4.2 The hydropower plant shall clarify the fire safety responsibility of the post and determine the fire safety responsible persons at all levels and positions. 4.3 Hydropower plants should regularly organize fire safety inspections to eliminate fire safety defects and hidden dangers in a timely manner. 4.4 The evacuation passages, safety exits and fire truck passages of hydropower plants shall be unblocked. 4.5 The fire prevention and smoke prevention division and fire separation distance of hydropower plants shall comply with the requirements of GB 50016, GB 50872 and GB 50987.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 36570-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 36570-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 36570-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 36570-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.