GB/T 32899-2016 English PDFUS$439.00 ยท In stock  
  Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32899-2016: Test code of SFC starting device for pumped storage power unit Status: Valid 
 Basic dataStandard ID: GB/T 32899-2016 (GB/T32899-2016)Description (Translated English): Test code of SFC starting device for pumped storage power unit Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P55 Classification of International Standard: 27.140 Word Count Estimation: 22,280 Date of Issue: 2016-08-29 Date of Implementation: 2017-03-01 Regulation (derived from): National Standard Announcement 2016 No.14 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 32899-2016: Test code of SFC starting device for pumped storage power unit---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Test code of SFC starting device for pumped storage power unit ICS 27.140 P55 National Standards of People's Republic of China Test procedure for static frequency conversion starting device of pumped storage unit 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 2 4 test classification 2 4.1 Type test 2 4.2 Factory test 2 4.3 Field test 2 4.4 Periodic test 3 5 Test items and related requirements 3 5.1 General provisions 3 5.2 Test items 3 5.3 Test record requirements 3 5.4 Periodic test period 3 6 basic test method 3 6.1 General provisions 3 6.2 input (output) transformer test 3 6.3 input/output circuit breaker, filter circuit breaker test 3 6.4 AC reactor test 4 6.5 DC reactor test 4 6.6 disconnector (including bypass switch), ground switch test 4 6.7 High voltage cable test 4 6.8 Bus test 4 6.9 Filter test 4 6.10 arrester test 4 6.11 Current Transformer Test 4 6.12 voltage transformer test 4 6.13 rectifier bridge, inverter bridge test 4 6.14 Auxiliary equipment test 5 6.15 Static frequency converter controller test 6 6.16 System intermodulation 7 Appendix A (normative) Type test, factory test, field test and periodic test item 10 Appendix B (informative) Regular inspection of the test cycle Table 16 ForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents. This standard is proposed by the China Electricity Council and centralized. This standard is responsible for the drafting unit. State Grid New Source Holdings Limited, the South network peak shunting FM power generation company, State Power Nairui Technology Co., Ltd. limited the company. This standard participates in the drafting unit. Hebei Zhanghewan energy storage power generation limited liability company, Anhui Xiangshuijian Pumped Storage Co., Ltd., East China Tong Bo Pumped Storage Power Co., Ltd., State Grid New Source Holdings Co., Ltd. Panjiakou Energy Storage Power Plant, East China Tianhuangping Pumped Storage Co., Ltd. the company. The main drafters of this standard. Lin Mingshan, Li Jianguang, He Yichun, Fang Junmin, Yang Wendao, Chang Yuhong, Huang Xiaofeng, Zhang Xin, Wang Guozhu, Ma Zhiqiang, Yi Cheng, Zhu Weifei, Wang Yong, Zhang Lei Lei, Lu Jian, Li Jianhui, Shao Yixiang, Xu Qiping, Xiao Fafu, Hu Zhiping, Liu Fu, Cheng Shiming. Test procedure for static frequency conversion starting device of pumped storage unit1 ScopeThis standard specifies the pilot classification, test items, basic test methods and requirements of the static frequency conversion starting device of the pumped storage unit. This standard applies to a variety of capacity of the pump storage unit static variable frequency starting device test.2 normative reference documentsThe following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB 1094.1 Power transformers - Part 1. General GB 1094.2 Power transformers - Part 2. Temperature rise of liquid immersion transformers GB 1094.3 Power transformers - Part 3. Insulation level, insulation test and external insulation air gap GB/T 1094.4 Power transformers - Part 4. Lightning shock and operational shock test guidelines for power transformers and reactors Power transformers - Part 6. Reactors GB/T Power transformers - Part 11. Dry - type transformers High - voltage AC circuit breakers High - voltage AC disconnectors and earthing switches GB/T 4109 Insulation sleeve with AC voltage higher than 1000V GB/T 7260.3 Uninterruptible power supply (UPS) - Part 3. Methods and test requirements for determining performance Test method for hydraulic hose assembly GB/T GB/T 11022 high voltage switchgear and control equipment standard common technical requirements GB 11032 AC gapless metal oxide surge arresters Technical specification for relay protection and safety automatic device GB/T 14285 GB/T 15153.2 Telecontrol equipment and systems - Part 2. Working conditions - Part 2. Environmental conditions (climate, machinery and other non - Electric influence factor) GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test Transformer transformers - Part 1. Transformers for industrial use GB 20840.2 Transformers - Part 2. Supplementary technical requirements for current transformers GB/T 20840.7 Transformers - Part 7. Electronic voltage transformers Transformers - Part 8. Electronic current transformers GB/T GB 50150 electrical installations installation engineering electrical equipment transfer test standards Code for fire protection design of thermal power plants and substations GB 50229 Code for construction of industrial metal piping GB 50235 Specification for preventive test of electrical equipment Overvoltage protection and insulation fit for DL/T 620 AC electrical installations DL/T 799.3 Technical specification for labor environment monitoring in the power industry - Part 3. Productivity noise monitoring Code for inspection of DL/T 995 relay protection and grid safety automatic device Guide for testing and adjusting microcomputer excitation regulators for large and medium - sized hydro - generators ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32899-2016_English be delivered?Answer: Upon your order, we will start to translate GB/T 32899-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32899-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32899-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |