Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32797-2016 English PDF

US$494.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32797-2016: Cogeneration systems -- Technical declarations for planning, evaluation and procurement
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32797-2016494 Add to Cart 3 days Cogeneration systems -- Technical declarations for planning, evaluation and procurement Valid

Similar standards

GB/T 14478   GB/T 15468   JB/T 10384   GB/T 33627   GB/T 33632   

Basic data

Standard ID: GB/T 32797-2016 (GB/T32797-2016)
Description (Translated English): Cogeneration systems -- Technical declarations for planning, evaluation and procurement
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K56
Classification of International Standard: 27.040
Word Count Estimation: 25,293
Date of Issue: 2016-08-29
Date of Implementation: 2017-03-01
Regulation (derived from): National Standard Announcement 2016 No.14
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32797-2016: Cogeneration systems -- Technical declarations for planning, evaluation and procurement


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Cogeneration systems - Technical declarations for planning, evaluation and procurement ICS 27.040 K56 National Standards of People's Republic of China Combined heat and power generation system Technical specifications for planning, evaluation and procurement (ISO 26382..2010, IDT) 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 Key project information and assessment analysis 3 5 CHP system assessment 7 6 Main information and work on cogeneration system procurement 9 Appendix A (informative) Typical Cogeneration System Planning Assessment Procedure 11 Appendix B (informative) Typical life cycle cost analysis 12 Appendix C (informative) Typical cogeneration system diagram and flow chart 13 Appendix D (informative) Time period calculation method with equivalent expenditure of cogeneration system and conventional system 17 Appendix E (informative) Calculation method of total profit of power plant life cycle Appendix F (informative) Information and work division of cogeneration systems Reference 21

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard uses the translation method equivalent to ISO 26382..2010 "Technical specification for CHP for planning, evaluation and procurement". This standard is proposed by the China Machinery Industry Federation. This standard is under the jurisdiction of the National Gas Turbine Standardization Technical Committee (SAC/TC259). The drafting of this standard. Zhejiang Electric Power Design Institute, Nanjing Gas Turbine Research Institute, China United Engineering Company, Hangzhou Huadian Xiasha Thermal Power Limited company. The main drafters of this standard. Shen Youxing, light Xu, Yang Jiaqiang, Qiao Feng, Zhu Da. Combined heat and power generation system Technical specifications for planning, evaluation and procurement

1 Scope

This standard provides technical specifications for the planning, evaluation and procurement of simultaneous cogeneration systems for the provision of electricity, heat and/or cold. This standard applies to the identification of research content in the project evaluation, the main information on CHP system assessment and cogeneration system procurement jobs. This standard also specifies the necessary inspection items during the planning of the cogeneration system, providing a project for the realization of the project cogeneration system Reasonable configuration of the program, and contains a detailed development steps of the detailed flow chart.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB/T 19829.2-2005 Oil and gas industry life cycle cost analysis Part 2. Methodology and calculation methods Application Guide (ISO 15663-2..2001, IDT)

3 terms and definitions

The following terms and definitions apply to this document. 3.1 Assets The resources owned by an organization are often used to generate revenue or add value. 3.2 Auxiliary heat source and/or cold source auxiliaryheatingand/orcoolingsources Installed in the cogeneration system, on-demand additional heat and/or cooling equipment. Such as steam boilers and/or hot water boilers, direct-fired absorption chillers/heaters and motor-driven equipment. 3.3 Availability Within the specified time period (usually a calendar year), the CHP system generates electricity, heat and/or cold total time shares as required. 3.4 Capital expenditure capitalexpenditure Used to purchase, install and commission a capital asset. [ISO 15663-1..2000, definition 2.1.6] 3.5 Cogeneration system cogenerationsystem CGS At the same time as the power generation, the use of engine or prime mover exhaust, row (pumping) steam or waste heat to produce heat and/or cold facilities.
......
Image