Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32716-2016 English PDF

US$579.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32716-2016: Technical guideline of stipulation for norm of water intake
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32716-2016579 Add to Cart 5 days Technical guideline of stipulation for norm of water intake Valid

Similar standards

GB/T 18920   GB/T 18921   GB/T 32224   GB/T 45892.1   GB/T 19923   

Basic data

Standard ID: GB/T 32716-2016 (GB/T32716-2016)
Description (Translated English): Technical guideline of stipulation for norm of water intake
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: P40
Classification of International Standard: 13.060.01
Word Count Estimation: 29,279
Date of Issue: 2016-08-29
Date of Implementation: 2017-03-01
Regulation (derived from): National Standard Announcement 2016 No.14
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32716-2016: Technical guideline of stipulation for norm of water intake

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guideline of stipulation for norm of water intake ICS 13.060.01 P40 National Standards of People's Republic of China Preparation of technical guidelines for water quota 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 General 2 4.1 Principles of preparation 2 4.2 base year and guarantee rate 2 4.3 Data requirements 3 4.4 Preparation of water with water quota 3 5 Agricultural water quota 4 5.1 Preparation 4 5.2 Preparation method of irrigation water quota 4 5.3 Establishment of fishery water quota 4 5.4 Development of livestock quota 4 6 Industrial water quota 4 6.1 Preparation 4 6.2 Preparation of common quota 5 6.3 Preparation of advanced quota 6 7 Water supply for services and construction 6 7.1 Preparation 6 7.2 Preparation method 7 8 Domestic water quota 9 8.1 Preparation 9 8.2 Preparation method 9 Appendix A (informative) Structural analysis 10 Appendix B (informative appendix) Method of calculation of school standard number 13 Appendix C (Informational Appendix) Survey of Water Use in Service Industry Reference 26

Foreword

This standard is prepared in accordance with the rules given in GB/T 1.1-2009. This standard is proposed and centralized by the Ministry of Water Resources of the People's Republic of China. The drafting unit of this standard. Ministry of Water Resources Ministry of Communications National Energy Bureau Nanjing Water Conservancy Research Institute, Ministry of Water Resources Water Management Center, China Water Institute of Hydropower and Science. The main drafters of this standard. Qin Fuxing, Chen Ming, Yan Yong, Liu Yongpan, Chen Ying, Wan Yusheng, Zhang Jiqun, Qi Bingqiang, Wang Jian, Yang Cong, Geng Leihua, Sun Rongqiang, Chen Xiaoyan, Zhang Guoyu, Lu Qiong, Zhang Yuming, Yuan Fengchen, Zhang Teng. Preparation of technical guidelines for water quota

1 Scope

This standard specifies the basic principles, contents and methods of water quota preparation. This standard applies to the preparation and specification of industry water quota preparation and revision.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. Classification of National Economy GB/T 12452 General rules for water balance testing General rules for examination and management of water abstraction technology GB/T 17367 GB/T 18916 water quota Guidance on the preparation of irrigation water quotas GB/T Standard for Domestic Water Consumption for Urban Residents GB/T 50331

3 terms and definitions

The following terms and definitions apply to this document. 3.1 Water quantity Water intake of water users. Note. including water from the public water supply project (including recycled water, desalination water), self-surface water (including rainwater collection and utilization), groundwater, the market purchased aquatic products Etc., does not include re-use of water. The agricultural water contains the following water loss (or wellhead). From the water supply project of industrial and domestic water is not included Water loss for water supply projects. 3.2 Reclaimed water Urban sewage treatment plant after the depth of treatment, to achieve a certain water quality indicators to meet the requirements of the water. 3.3 Industrial water quantity quantity ofwaterintakeforindustry Industrial enterprises of the main production of water, auxiliary production of water and ancillary production of water and the sum. Note. Does not contain the amount of water supplied to the outside. Industrial infrastructure and technological transformation, scientific research water classified as auxiliary production water. 3.4 Water quota normofwaterintake The limit of water consumption per unit of water for a certain period of time. Note. including agricultural water quota, industrial water quota, service and construction water quota and domestic water quota. 3.5 Agricultural water quota normofwaterintakeforagriculture A certain period of time by the corresponding accounting unit to determine the various types of agricultural units of water limit. Note. including farmland irrigation water quota, vegetable, fruit and pasture irrigation water quota, fishery water quota and livestock water quota.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32716-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32716-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32716-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32716-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.