Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 32715-2016 English PDF

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 32715-2016150 Add to Cart Auto, < 3 mins Integral micro hydroturbine generator unit Valid

Similar standards

GB/T 2820.7   GB/T 2820.9   GB/T 2317.4   GB/T 30370   GB/T 12786   

Basic data

Standard ID: GB/T 32715-2016 (GB/T32715-2016)
Description (Translated English): Integral micro hydroturbine generator unit
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: K52
Classification of International Standard: 29.160.40
Word Count Estimation: 12,181
Date of Issue: 2016-08-29
Date of Implementation: 2017-03-01
Regulation (derived from): National Standard Announcement 2016 No.14
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 32715-2016: Integral micro hydroturbine generator unit

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Integral micro hydroturbine generator unit ICS 29.160.40 K52 National Standards of People's Republic of China Complete miniature hydroelectric generating units 2016-08-29 released 2017-03-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface III 1 Scope 1 2 normative reference document 1 3 Terms and definitions 1 4 basic parameters 1 5 Model 2 Technical requirements and test methods 3 7 factory inspection 4 8 nameplate, packaging, transportation and storage 4 9 Installation 5 10 Operation, maintenance and repair 6 Appendix A (informative) Full - scale micro - hydro - generator - turbine performance parameters

Foreword

This standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by the Ministry of Water Resources of the People's Republic of China. This standard is under the jurisdiction of the Ministry of Water Resources Rural Hydropower and Electrification Development Bureau. The drafting unit. the Ministry of Water Resources Product Quality Standards Institute, Hangzhou Jianghe Electrical and Mechanical Equipment Engineering Co., Ltd. The main drafters of this standard. Xie Yaqin, Jie Jianan, Liang Zhenhua, Liu Xian, Wu Yanming, Xu Hongquan, Zheng Yuan, Gu Rong. Complete miniature hydroelectric generating units

1 Scope

This standard specifies the terms and definitions of the complete micro-hydro-generator (hereinafter referred to as the unit). The basic parameters, type and technology Summarize the test method, and the factory inspection, nameplate, packaging, transportation and storage, installation, operation, maintenance and maintenance requirements. This standard applies to the rated power of 100kW and below the unit.

2 normative reference documents

The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article Pieces. For undated references, the latest edition (including all modifications) applies to this document. GB 755 Rotating motor quota and performance GB/T 1029 three - phase synchronous motor test method GB/T 2900.45 Electrotechnical terminology Hydrographic equipment for hydropower stations GB/T 3323 metal fusion welding joint radiography GB/T 4942.1 Protection class of the overall structure of the rotating electrical machine (IP code) classification GB/T 10585 basic technical requirements for small and medium synchronous motor excitation system Technical requirements for flow - through components of hydraulic turbine, pump and pump Technical specification for installation of GB/T 17525 micro hydroelectric power equipment Guide for Electromechanical Equipment for Small Hydropower Stations GB/T GB/T 21718 basic technical conditions for small turbines GB/T 22140 small water turbine on-site acceptance test procedures Specification for Static Balance of Small and Medium - sized Turbine Runners in JB/T 6752 Specification for packaging, transport and storage of JB/T 8660 hydroelectric units Safety operation rules for NY/T 666 micro hydroelectric power equipment

3 terms and definitions

GB/T 2900.45 The definitions and definitions of the following terms and definitions apply to this document. 3.1 The turbines and generators are integrated into one and include integrated devices for the controller. 3.2 Controller controler Set speed, excitation, control, protection and other functions in one integrated device.

4 basic parameters

4.1 The basic parameters of the unit The basic parameters of the unit are as follows.
......

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32715-2016_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32715-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically in 9 seconds (download/delivered in 9 seconds). The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32715-2016_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32715-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.