GB/T 32299-2015 English PDFUS$399.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32299-2015: Space project risk management Status: Valid
Basic dataStandard ID: GB/T 32299-2015 (GB/T32299-2015)Description (Translated English): Space project risk management Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: V00 Classification of International Standard: 49.020 Word Count Estimation: 19,137 Date of Issue: 2015-12-31 Date of Implementation: 2016-07-01 Regulation (derived from): State Standard Announcement 2015 No.43 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China GB/T 32299-2015: Space project risk management---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Space project risk management ICS 49.020 V00 National Standards of People's Republic of China Aerospace project risk management (ISO 17666..2003, Spacesystem-Riskmanagement, MOD) 2015-12-31 released 2016-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Management Committee released Directory Preface I Introduction II 1 Scope 1 2 terms and definitions3 Principles of risk management 2 4 Risk management process 3 5 Risk Management Implementation 8 6 Risk Management Document 9 7 Risk Management Requirements 9 Appendix A (informative) This standard differs from ISO 17666..2003 Technical differences and their causes 12 Appendix B (informative) Example of risk registration and risk sequencingForewordThis standard is drafted in accordance with the rules given in GB/T 1.1-2009. This standard uses the re-drafting method to modify ISO 17666..2003 "Aerospace System Risk Management". There are technical differences between this standard and ISO 17666..2003, and the terms involved in these differences have passed through the margin The vertical single line (|) is marked. A list of the corresponding technical differences and their causes is given in Appendix A. This standard has made the following editorial changes. - Added information on Appendix A to guide the use; --- Replace original appendix A with appendix B. This standard is proposed by China Aerospace Science and Technology Corporation. This standard is nationalized by the National Aeronautical Technology and Its Application Standardization Technical Committee (SAC/TC425). The drafting of this standard. China Aerospace Standardization Institute, China Space Technology Research Institute. The main drafters of this standard. Ye Xiaolei, case this, too Ping, Yang Weiyuan, Yang Xiaoming.IntroductionRisk is a threat to the successful achievement of project objectives that have a negative impact on the cost, schedule and technical performance of the project ring. But reasonable control of risk may also lead to new opportunities that have a positive impact. The goal of project risk management is to systematically, comprehensively, comprehensively and economically and effectively, under the constraints of project technology and planning. Do not evaluate, reduce, accept and control the risk of aerospace projects. The risks should be related to the usual management, planning (such as cost, schedule) and technology (such as weight, Energy, credibility, security) and other areas of the project resources to conduct a comprehensive trade-off. Risk management is a repetition throughout the project's lifecycle Iteration process, the number of iterations depends on the progress of the project phase and the baseline changes that have been identified. Baseline changes will affect the project resources. Risk management should be implemented at all levels in the customer-supplier network. Project risk management should take full advantage of systems engineering, safety analysis, key projects, credibility, critical path, cost analysis, etc. The method of project risk. The primary objective of risk management is to prioritize the success of project objectives in accordance with risk Focus on the main risks. Aerospace project risk management1 ScopeThis standard specifies the general principles, procedures, implementation and documentation requirements for aerospace project risk management. This standard applies to the risk management of aerospace project life cycle.2 terms and definitionsThe following terms and definitions apply to this document. 2.1 Risk of risk Does not expect the state or condition, it has the possibility of occurrence, and may have potential negative consequences for the project. Note. the risk arises from the lack of uncertainty about the predictions or controls of the events, the risks are everywhere, and the uncertainty is uncertain; Sex will reduce the risk. 2.2 Single risk individualrisk Exist in the project, as individual risk terms, can be individually identified, assessed and reduced risk. 2.3 Total risk overalrisk The integration of the individual risks of the project and the assessment of its mutual impact. Note. Total risk can be expressed qualitatively and quantitatively. 2.4 Risk management policy riskmanagementpolicy Organizational attitudes to risk include how to manage risk, risk acceptance criteria, and key requirements for risk management programs. 2.5 Risk management riskmanagement In accordance with the established project risk management policy, the project resources system and repeated iterative optimization. 2.6 Risk management process riskmanagementprocess Including all activities such as risk identification, assessment, reduction, acceptance and feedback. 2.7 Risk reduction Reduce the likelihood of risk occurrence or the implementation of its serious measures. 2.8 Risk information communication Communicate the information and data needed for project risk management to project managers and related personnel. 2.9 Risk index The value of measuring the size of the risk is a combination of the likelihood of the risk and the seriousness of the consequences. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32299-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 32299-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32299-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32299-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |