GB/T 32045-2015 English PDFUS$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32045-2015: Guidance on implementation of measurement and verification of energy savings Status: Valid
Basic dataStandard ID: GB/T 32045-2015 (GB/T32045-2015)Description (Translated English): Guidance on implementation of measurement and verification of energy savings Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F01 Classification of International Standard: 27.010 Word Count Estimation: 17,151 Date of Issue: 2015-09-11 Date of Implementation: 2016-04-01 Quoted Standard: GB/T 2587; GB/T 6422; GB/T 8222; GB/T 13234; GB/T 28750; GB/T 31349-2014 Regulation (derived from): National Standard Announcement 2015 No.25 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This Standard specifies the energy-saving technological transformation projects (hereinafter: Project) savings measurement and verification of implementation procedures, techniques and reporting. This Standard applies to the measurement and verification of energy savings project implementation. GB/T 32045-2015: Guidance on implementation of measurement and verification of energy savings---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.(Energy savings measurement and verification Implementation Guide) ICS 27.010 F01 National Standards of People's Republic of China Energy savings measurement and verification Implementation Guide Issued on. 2015-09-11 2016-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 implementation steps 1 5 Techniques 3 5.1 division of the project boundary of 3 5.1.1 General requirements 3 5.1.2 The project boundary includes only energy systems or equipment 3 5.1.3 The project boundary includes the entire energy units 3 OK 3 5.2 statistical base period and reporting period 5.2.1 General requirements 3 5.2.2 Test of 4 Select 4 5.3 Calculation Method 5.3.1 General requirements 4 5.3.2 "base period consumption - factors" model law 4 5.3.3 Direct comparison method ( "on - off" method) 5 5.3.4 simulation software Method 6 5.3.5 calibration energy value adjustment 6 Get Data 7 5.4 5.4.1 obtain energy consumption data 7 Get 5.4.2 Factors Affecting Data 7 5.4.3 Sampling 7 Uncertainty Analysis 5.5 7 Preparation of 86 reports Appendix A (normative) Measurement and verification program Example 9 Annex B (informative) Example 11 Regression Model Annex C (normative) framework for measurement and verification report 13 References 14ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard by the National Standardization Technical Committee for Energy and Management (SAC/TC20) and focal points. This standard drafting units. China National Institute of Standardization, Tongji University, China Institute of Metrology, Beijing Zhicheng Wang Yip intelligent control technology Ltd., Shanghai Bao-liter saving technology companies. The main drafters of this standard. Li Pengcheng, Pan Yi Group, Liu Meng, Jiang Yun, Hai Hung Chen, Tian Jianwei, Pan Chong Chao, Zhang Wei, Wu Gang, Chen Lili. Energy savings measurement and verification Implementation Guide1 ScopeThis standard specifies the energy-saving technological transformation projects (hereinafter. Project) savings measurement and verification of implementation procedures, techniques and reporting prepared by. This standard applies to project energy savings measurement and verification of implementation.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 2587 General equilibrium energy using equipment GB/T 6422 energy-using equipment to test guidelines GB/T 8222 General electrical equipment, energy balance GB/T 13234 method of calculating energy companies GB/T Section 28750 of energy measurement and verification techniques General GB/T 31349-2014 energy measurement and verification section technical requirements for central air conditioning system3 Terms and DefinitionsGB/T 13234, the terms and definitions GB/T 28750 apply to this document defined.4 implementation stepsMeasurement and verification of energy savings includes the following implementation steps. a) Prepare measurement and verification program. Measurement and verification program preparation, including division of the project boundary, determine the statistical base period and the reporting period, the election Take methodology, the data collection program and results accuracy requirements and other four job content. This work is a four cycle Reciprocating dynamic process, the need to constantly revise and improve relevant content until a technically feasible and economically reasonable measurement and verification Program. b) identify and record the measurement and verification program. Before the start of the project construction and implementation, should step a) the content of the work of a written text Member. Content measurement and verification programs should be consistent with GB/T 28750 requirements. Measurement and verification program example in Appendix A. in For implementation of the project on the measurement and verification program changes should be recorded in writing to change the situation. c) to determine the energy consumption data and factors influencing the base period. d) the design, installation and commissioning of test equipment. According to the requirements of measurement and verification programs in project design and construction process should be synchronized set Design, installation and commissioning for the measurement and verification of test equipment. e) determining the statistical reporting of energy consumption data and factors. f) to determine the energy savings. If necessary, it is reasonable to set the calibration value to adjust the energy consumption and energy consumption should be a written record set calibration adjustment value Setting process and results. g) the audit report or savings have been identified. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32045-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 32045-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 32045-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32045-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |