Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 31882-2015 English PDF

US$239.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31882-2015: General installation requirements of S-lay system equipment for ships
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 31882-2015239 Add to Cart 3 days General installation requirements of S-lay system equipment for ships Valid

Similar standards

GB/T 7094   CB 1146.9   GB/T 34430.4   GB/T 31885   

Basic data

Standard ID: GB/T 31882-2015 (GB/T31882-2015)
Description (Translated English): General installation requirements of S-lay system equipment for ships
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: U06
Classification of International Standard: 47.020.01
Word Count Estimation: 11,140
Date of Issue: 2015-09-11
Date of Implementation: 2015-12-01
Quoted Standard: CB/T 3958
Regulation (derived from): National Standard Announcement 2015 No.25
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This Standard specifies the conditions for S-lay installation operating line of equipment, pre-installation preparation and equipment installation. This Standard applies to S-lay vessel operating line equipment installation.

GB/T 31882-2015: General installation requirements of S-lay system equipment for ships

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General installation requirements of S-lay system equipments for ships ICS 47.020.01 U06 National Standards of People's Republic of China S line type pipe-laying equipment installed on board General skills requirement Issued on. 2015-09-11 2015-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by China State Shipbuilding Corporation. This standard by the National Standardization Technical Committee Marine Boats (SAC/TC12) centralized. This standard was drafted. Jiangsu Rongsheng Heavy Industries Co., Ltd., China Shipbuilding Technology and Economy Research Institute, Jiangsu Rongsheng Shipbuilding Co. The company, Jiangsu Rongsheng Ship Research and Design Institute Limited. The main drafters of this standard. Chen Qiang, Wu Jing, Dong Zhiguo, Zhong Hong Cai, Zheng Junli, Li Yaqin. S line type pipe-laying equipment installed on board General skills requirement

1 Scope

This standard specifies the S-lay equipment operating line (referred to pipe-laying equipment) installation conditions, preparation and installation of equipment before installation. This standard applies to S-type pipe-laying ship line equipment installation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. CB/T 3958 Ship steel weld magnetic particle testing, penetrant testing and quality classification

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 S-lay S-lay After the pipeline into the water pipe-laying method S-curve in the water. 3.2 Main operating line centerline centerlineofmainfiringline Theoretical centerline main operating line pipe installed vertically on the deck in the main operating line to the projector, see Figure 1. Figure 1 installation reference image 3.3 Main operating line center plane centralplaneofmainfiringline Through the main operating line centerline plane perpendicular to the deck attached to the device.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31882-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31882-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31882-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31882-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.