GB/T 30591-2014 English PDFUS$189.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30591-2014: Requirements for size coordination for opening of windows and doors in building Status: Valid
Basic dataStandard ID: GB/T 30591-2014 (GB/T30591-2014)Description (Translated English): Requirements for size coordination for opening of windows and doors in building Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: P32 Classification of International Standard: 91.060.50 Word Count Estimation: 8,850 Date of Issue: 6/9/2014 Date of Implementation: 12/1/2014 Quoted Standard: GB/T 5823; GB/T 5824 Regulation (derived from): National Standards Bulletin No. 11 of 2014 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This Standard specifies the size of the window and door openings building standards coordination and application requirements. This Standard applies to civil commonly used standard sizes coordination outside doors and openings. GB/T 30591-2014: Requirements for size coordination for opening of windows and doors in building---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Requirements for size coordination for opening of windows and doors in building ICS 91.060.50 P32 National Standards of People's Republic of China Building size window and door openings coordination requirements Issued on. 2014-06-09 2014-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic of China. This standard by the national building curtain wall windows and doors Standardization Technical Committee (SAC/TC448) centralized. This standard drafting unit. China Academy of Building Research, China Academy of Building Standard Design, China Construction Metal Structure Association, Guangdong Province Building Research Institute, Shenzhen, the new mountain walls Technical Advisory Co., Ltd., Guangdong Kin Long Hardware Products Co., Ltd., Zhongshan Shengxing shares Ltd., Schüco curtain wall system (Beijing) Co., Ltd., Dalian Shide Group Co., Ltd., Beijing Jiayu Fenestration Company Limited Secretary, Hebei Austrian Shunda run Window Co., Ltd., Sichuan product quality supervision and inspection Institute, Beijing window Milan saving building materials Co., Ltd., Shenzhen Shenzhen Fu-curtain wall decoration Engineering Co., Ltd., Beijing, Ltd., Chongqing Maxim Meissen and industrial doors, windows and doors Chongqing Huaxia Limited liability company, Zhejiang dream day Wood Co., Ltd., Wuhan Hong Kong and Technology Co., Ltd., Shandong Xin Ze Decoration Engineering Co., Ltd., China Metallurgical home Industry Co., Ltd. Nanjing, Beijing Peace Aluminum Limited. The main drafters of this standard. Wang Hongtao, Gutai Chang, Liu Huitao, Huang Qi, Tanxian Shun, Yan Lei, Liang Yuefeng, stone Man Cheung, Dou Tiebo, Duwan Ming, Jiang Qinghai, De-rock, Cheng Xiansheng, Zhang Guofeng, Weihe Dong, Chen Hong roots, Pan Fu, Cai Xianci, Shen Takeo, Xiaming Xian Lai Roughs, Yao Xiong Wu, Li Jinggang, Xuheng Fu, horse source Wangyou Qing, Qiu Ming, Wan Chan, Liu Bin.IntroductionBuilding civil construction door and window openings error is much larger than the size of windows and doors processing accuracy, leading to the actual installation location of doors and windows in the hole The presence of a large positioning error, resulting in the installation of doors and windows after the performance decline, and even affect the safe use. Doors and windows of the building and size of the hole Regulate and coordination are key measures to achieve standardization of building windows and doors, industrial production and ensure the quality of the installation. This standard is part of the basic parameters commonly used as a standard size doors and windows doors and windows, and doors and windows with standard hole size coordination conducive to real Doors and windows are now large quantities of industrial production, the quality assurance process and installation quality and stability. Standard doors and windows box should be completed in the factory, fan assembly After installing the hardware and overall factory, the overall installation and after completion of the renovation or renovation phase hole to simplify the installation process for the subsequent replacement service Facilitate the advancement of technology building doors and windows. Building size window and door openings coordination requirements1 ScopeThis standard specifies the construction standard size window and door openings coordination and application requirements. This standard applies to civil commonly used standard size coordinate external doors, windows and openings.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 5823 building windows and doors term GB/T 5824 series hole size doors and windows3 Terms and DefinitionsGB/T 5823, GB/T 5824 defined by the following terms and definitions apply to this document. 3.1 Appendent-frame attached to the frame Embedded or pre-installed on the door and window openings for doors and windows fixing lever system. [GB/T 5823-2008, the definition 2.4] 3.2 Wide hole in the installation is complete, high structure size widthandheightofdecoratedopening After incubation, the complete decorative door and window openings width, height, including the actual size of the inner and outer two types of installation surface structure size.4 Dimensions coordination4.1 size of the hole series Door and window openings sized to the size of window and door openings flag represents, common standards for window and door openings should be consistent with the requirements in Table 1 and Table 2. Table 1 common standard door opening flag size series in millimeters Flag size hole width 700 800 9,001,000,120,015,001,800 Hole height No. 1,234,567 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30591-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 30591-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 30591-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30591-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |