Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 29814-2013 English PDF

US$1214.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29814-2013: On-line analyser systems -- Guide to design and installation
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 29814-20131214 Add to Cart 5 days On-line analyser systems -- Guide to design and installation Valid

Similar standards

GB/T 40219   GB/T 25930   GB/T 25929   GB/T 15074   GB/T 29813   GB 29812   

Basic data

Standard ID: GB/T 29814-2013 (GB/T29814-2013)
Description (Translated English): On-line analyser systems -- Guide to design and installation
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: N53
Classification of International Standard: 71.040.01
Word Count Estimation: 61,675
Quoted Standard: GB 3836.14-2000; GB 3836.15-2000; GB 3836.17-2007; GB 4208-2008; GB/T 27867-2011; IEC 60079-1-2007; IEC 60079-2-2001; IEC 60079-11-2005; IEC 60079-15-2000; IEC 60746-1; IEC 60746-2; IEC 60746-3; IEC 60746-4; IEC 60746-5; IEC 61115; IEC 61207; IEC 61241-2-
Adopted Standard: IEC/TR 61831-1999, IDT
Regulation (derived from): National Standards Bulletin No. 22 of 2013
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard applies to the online analyzer system, guiding line analyzer system suppliers and users to establish or design process from sampling to the output terminal display or control a complete analyzer system.

GB/T 29814-2013: On-line analyser systems -- Guide to design and installation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
On-line analyser systems.Guide to design and installation ICS 71.040.01 N53 National Standards of People's Republic of China Online Analyzer System Design and Installation Guide (IEC /T R61831.1999, IDT) Issued on. 2013-11-12 2014-03-15 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ Introduction Ⅳ 1 General 1 1.1 Scope 1 1.2 Normative references 1 1.3 Evaluation 2 basis 1.4 Supplementary Assessment 2 1.5 Reliability 3 1.6 Design of 3 1.7 Integrated 3 1.8 site installation 3 1.9 pre-assembled system 3 2 Health and safety 3 2.1 Introduction 3 2.2 Fire and Explosion Prevention 4 2.3 Toxic hazard protection 5 5 2.4 site safety 5 2.5 radiation risks 5 2.6 Safety Facilities 2.7 Manual closing means 5 2.8 Noise 6 2.9 alarm indication 6 3 analyzer protection 6 3.1 Introduction 6 3.2 Definition 6 3.3 Analyzer protection selection 7 3.4 Regional Classification and toxic hazard 8 Manufacture and installation 8 3.5 3.6 Analyzer protection ventilation requirements 9 10 3.7 Design of natural ventilation 3.8 Forced ventilation design 11 3.9 Protective Security Analyzer monitors and alarms 12 4 sampling system 16 4.1 Introduction 16 4.2 Defining 16 17 4.3 General Requirements 4.4 location of sampling points 17 4.5 rapid circulatory system 18 4.6 Bypass System 18 4.7 Sample Recovery System 18 18 4.8 Special Requirements More than 4.9 channel system 19 Manufacturing 19 4.10 4.11 effluent treatment 21 4.12 calibration device 22 Automatic calibration 22 4.13 5 Communication Analyzer 23 5.1 Introduction 23 5.2 signaling 23 5.3 Security 23 5.4 cable 24 5.5 Linearization 24 Use 24 5.6 signals 5.7 Alarm 24 5.8 Verification/Calibration 24 Appendix A (informative) nominal pipe size (NPS) is not less than 2 "in the process of analysis of a typical sampling probe on line 25 OK Annex B (informative) sampling probe length 26 Annex C (informative) Calculation sampling system 32 Annex D (informative) Calculation of natural ventilation 42 Annex E (informative) forced ventilation calculation 46 Annex F (informative) computer data validation/calibration procedures Example 47 Cottages Appendix G (informative) with forced ventilation --- flammable dangerous work recommended shutdown control operation Summary Table 48 Appendix H (informative) with forced air ventilation fault analysis lodge --- and flammable gas detection shutdown logic 49 Schematic Annex I (informative) Typical analyzer system 51 Schematic Annex J (informative) Typical wear plate 53 References 54

Foreword

This standard was drafted in accordance with the rules of GB/T 1.1-2009 and GB/T 20000.2-2009 given. This standard uses the translation method is equivalent to using IEC /T R61831.1999 "online analyzer system design and installation guide." Correspondence between the consistency of the standards of international documents and normative references of the following documents. --- GB 12476 (all parts) combustible dust electrical equipment [IEC 61241 (all parts), IDT] --- GB/T 18403 (all parts) performance of gas analyzers [IEC 61207 (all parts), IDT] --- GB/T 19768-2005 process analyzer sample system performance indicates (IEC 61115.1992, IDT) --- GB/T 20245 (all parts) performance of electrochemical analyzers [IEC 60746 (all parts), IDT] Functional safety --- GB/T 20438 (all parts), electrical/electronic/programmable electronic safety-related systems [IEC 61508 (all section Points), IDT] --- GB 29812-2013 industrial process control cabin safety analysis (IEC 61285.2004, IDT) For ease of use, this standard made the following editorial changes. --- With the "References" instead of "Appendix K"; --- Rearrange the order of the equation of the comments; --- Standard and normative literature references cited in the informative annex to organize references. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. The standard proposed by China Machinery Industry Federation. The standard measurement and control of the instruments Standardization Technical Committee Technical Committee (SAC/TC124/by the National Industrial Process SC6) centralized. Limited Shanghai Measurement and Testing Technology Research Institute, Beijing North sub-Mai Hake Analytical Instruments Co., Ltd., Shanghai Precision & Scientific Instrument Co., Ltd., Focused Photonics (Hangzhou) Co., Ltd., Nanjing Analytical Instrument Factory Co., Ltd., Beijing Analytical Instrument Institute. The main drafters of this standard. Maya Juan, Fangpei Ji, Xiongbin Feng, Zhang Bo, Qu Changhong, Gu Minjie, Chen Yingbin, Hu Liu, Louxing Jun.

Introduction

Although the technical performance analyzer and sample systems, and related security and other aspects have a wide variety of criteria, but in the whole Lack of design and installation of online analyzer system corresponding guidance, the standard developed precisely for this purpose. Although the practical application of user online Analyzer is different, but the basic methods and approaches are similar. Therefore, this standard is conducive to work Industry standardization, reduce design and operational costs, and improve security. The term refers to throughout the text analyzer various online Analyzer. Process Analyst, mass analyzer, process quality and quality measurement instruments Monitor. The reference to European standards or international standards, should also comply with the requirements of relevant laws and regulations. Online Analyzer System Design and Installation Guide

1 General

1.1 Scope This standard applies to the online analyzer system, directed by the online analyzer system suppliers and users to establish or design process from sampling to the terminal Output display or control a complete analyzer system. 1.2 Normative references The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB 3836.14-2000 Electrical apparatus for explosive gas atmospheres - Part 14. Classification of hazardous areas (IEC 60079-10. 1995, IDT) GB 3836.15-2000 Electrical apparatus for explosive gas atmospheres - Part 15. Electrical installations in hazardous locations (except coal mines) (Eqv, IEC 60079-14.1996) GB 3836.17-2007 Electrical apparatus for explosive gas atmospheres - Part 17. Construction and use of rooms or buildings of positive pressure (IEC 60079-13. 1982, IDT) GB 4208-2008 housing protection (IP Code) (IEC 60529.2001, IDT) GB/T 27867-2011 petroleum liquids pipeline automatic sampling method (ISO 3171.1998, IDT) IEC 60079-1.2007 for explosive gas atmospheres - Part 1. the flameproof enclosure "d" protection device (Electricalapparatus forexplosivegasatmospheres-Part 1. Flameproofenclosure "d") IEC 60079-2.2001 Electrical apparatus for explosive gas atmospheres Part 2. Pressurized enclosures type "p" (Electricalapparatus forexplosivegasatmospheres-Part 2. Pressurizedenclosures "p") IEC 60079-11.2005 Explosive atmospheres - Part 11. the intrinsically safe "i" protection device (Electricalappa- ratusforexplosivegasatmospheres-Part 11. Intrinsicsafety "i") IEC 60079-15.2000 Electrical apparatus for explosive gas atmospheres - Part 15. Hazardous areas electrical installation (other than mines) (Electricalapparatusforexplosivegasatmospheres-Part 15. Electricalinstalationinhazardousareas (Otherthanmines) IEC 60746 (all parts) performance of electrochemical analyzers (Expressionofperformanceofelectrochemicalan- alyzers) IEC 61115 process analyzer sample system performance representation (Expressionofperformanceofsamplehandling systemsforprocessanalyzers) IEC 61207 performance of gas analyzers (Expressionofperformanceofgasanalyzers) IEC 61241 (all parts) of combustible dust Electrical Equipment (Electricalapparatusforuseinthepresence ofcombustibledust) IEC 61285 industrial process control analysis cabin safety requirements (Industral-processcontrol-Safetyofanalyzer houses) IEC 61508 (all parts), Functional safety of electrical/electronic/programmable electronic safety-related systems (Functionalsafetyof
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29814-2013_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29814-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29814-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29814-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.