GB/T 29813-2013 English PDFUS$534.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29813-2013: Analyser systems -- Guide to technical enquiry and bid evaluation Status: Valid
Basic dataStandard ID: GB/T 29813-2013 (GB/T29813-2013)Description (Translated English): Analyser systems -- Guide to technical enquiry and bid evaluation Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: N53 Classification of International Standard: 71.040.01 Word Count Estimation: 27,247 Quoted Standard: IEC 60079-1; IEC 60079-2; IEC 60079-10; IEC 60079-11; IEC 60079-13; IEC 60079-14; IEC 61082-1; IEC 61285; IEC 61355; IEC 61506; IEC/TR 61831; ISO 9000; enterprise monitoring equipment and facilities VDI/VDE 351.6-1978 table 1 gas analysis; enterprise moni Adopted Standard: IEC/TR 61832-1999; IDT Regulation (derived from): National Standards Bulletin No. 22 of 2013 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard applies to: guidance to help suppliers understand the analyzer and its auxiliary systems technical specifications, well submit for evaluation of tenders. The standard itself does not involve the design specifications, has deliberately ignore GB/T 29813-2013: Analyser systems -- Guide to technical enquiry and bid evaluation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Analyser systems. Guide to technical enquiry and bid evaluation ICS 71.040.01 N53 National Standards of People's Republic of China Analyzer system technical advice and tender Evaluation Guide (IEC /T R61832.1999, IDT) Issued on. 2013-11-12 2014-03-15 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Basic Description 2 3.1 Brief description of the program 2 3.2 Scope of supply 2 3.3 Suppliers are expected to answer questions 2 3.4 bid rejected based primarily on 2 Technical specifications 4 2 4.1 Supplier/2 user interface 4.2 Procurement Responsibility 3 4.3 implementation of standards and specifications 3 4.4 Documentation requirements 3 4.5 Quality assurance 4 4 4.6 General technical specifications 4.7 Analysis cabin Technical Specification 5 4.8 Sampling System Technical Specifications 6 Analyzer 4.9 Technical Specifications 7 4.10 inspection and testing 8 Evaluation of bids 9 5 5.1 Objective 9 The correct answer 9 5.2 Bid 9 5.3 technology 5.4 Technical Description restrictions 9 5.5 Bid qualification will be 9 5.6 Tender Assessment Checklist 9 Appendix A (informative) Technical Specifications Table 10 Analyzer Annex B (informative) analyzer status alarm "failure", "Maintenance request" and "outage" 14 Examples Appendix C (informative) Comparison of the tender evaluation process 16 Annex D (informative) Example of a quote Assessment Checklist 19 References 20 Appendix EForewordThis standard was drafted in accordance with the rules of GB/T 1.1-2009 and GB/T 20000.2-2009 given. This standard uses the translation method is equivalent to using IEC /T R61832.1999 "analysis system offer technical advice and Evaluation Guide." Correspondence between the consistency of the standards of international documents and normative references of the following documents. --- GB 3836.2-2010 explosive atmospheres - Part 2. the flameproof enclosure "d" protection equipment (IEC 60079-1.2007, MOD) --- GB 3836.4-2010 Explosive atmospheres - Part 4. the intrinsically safe "i" protection equipment (IEC 60079-11. 2006, MOD) --- GB 3836.5-2004 Electrical equipment for explosive gas atmospheres - Part 5. pressurized enclosure type "p" (IEC 60079-2. 2001, MOD) --- GB 3836.14-2000 Electrical apparatus for explosive gas atmospheres - Part 14. Classification of hazardous areas (IEC 60079-10. 1995, IDT) --- GB 3836.15-2000 Electrical apparatus for explosive gas atmospheres - Part 15. Electrical installations in hazardous locations (except coal mines Outside) (eqv IEC 60079-14.1996) --- GB 3836.17-2007 Electrical apparatus for explosive gas atmospheres - Part 17. Structure and positive pressure rooms or buildings Use (IEC 60079-13. 1982, IDT) --- GB/T 6988 (all parts), Preparation of documents used in electrical technology [IEC 61082 (all parts), IDT] --- GB/T 19001-2008 quality management system requirements (ISO 9001.2008, IDT) --- GB/T 19898-2005 industrial process measurement and control applications software documentation set (IEC 61506.1997, IDT) --- GB/T 26853.1-2011 complete sets of equipment, systems and device files Classification and designation - Part 1. Rules and classification tables (IEC 61355-1.2008, IDT) --- GB 29812-2013 industrial process control cabin safety analysis (IEC 61285.2004, IDT) --- GB/T 29814-2013 online analyzer system design and installation guide (IEC /T R61831.1999, IDT) The standard proposed by China Machinery Industry Federation. The standard measurement and control of the instruments Standardization Technical Committee Technical Committee (SAC/TC124/SC6) by the National Industrial Process Centralized. Research Institute, Beijing North sub-Mai Hake Analytical Instruments Co., FPI (Hangzhou) Co., Ltd., Shanghai Precision & Scientific Instrument Co., Division, Nanjing Analytical Instrument Factory Co., Ltd., Sichuan-Chongqing Analytical Instruments Co., Ltd., Beijing Analytical Instrument Institute. The main drafters of this standard. Maya Juan, Fangpei Ji, Zhang Bo, Qu Changhong, Gu Haitao, Gu Minjie, Liu Hu, Xiong Binfeng, Louxing Jun.IntroductionThe standard Chapter 2 describes the entire analyzer system technology projects names and descriptions of specifications. But not all of the analyzer system EC are the same, the specific needs of the total content there is a difference. However, this style of presentation makes some of the provisions of this standard according to need Seeking freedom to choose. The recommended practice is the standard to include all sections of the project, a statement can be made as appropriate "not applicable." The standard Chapter 3 describes the tender evaluation process as well as specific recommendations for the evaluation. The term used in this standard "analyzer" refers to a lot of equipment, such as online analyzers, process analyzers, mass analyzer, quality measurement Instrument, monitor process quality, continuous emission monitors, monitor water pollution and health and safety-related process monitor. When reference to other standards, we should pay attention to industry or local regulations may be mandatory. Analyzer system technical advice and tender Evaluation Guide1 ScopeThis standard is used to guide to help suppliers understand the technical specifications analyzer and its auxiliary systems, as well as the tender submitted for evaluation. The standard itself does not involve the design specifications, it has deliberately ignored the Design Guide section. But it should be with reference to specific design criteria related to, for example, Germany State Chemical and Pharmaceutical Industry Association of users of process control technology (NAMUR), Engineering Equipment and Materials Users Association (EEMUA), American Meter Association (ISA) and other standards, IEC /T R61831 technical report is also available as supplementary design guidelines. This standard provides a technical framework, expected by simplifying technical specifications and bidding process, to provide advice and documents intended for the equipment supplier See related procedures feedback.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. IEC 60079-1 Electrical apparatus for explosive gas atmospheres - Part 1. the flameproof enclosure "d" protection device (Electricalap- paratusforexplosivegasatmospheres-Part 1. Constructionandverificationtestofflameproofenclo- suresofelectricalapparatus) IEC 60079-2 Electrical apparatus for explosive gas atmospheres Part 2. Pressurized enclosures type "p" (Electricalapparatusfor explosivegasztmospheres-Part 2. Electricalapparatus-Typeofprotection "P") Electrical apparatus for explosive gas atmospheres - Part 10 IEC 60079-10. Classification of hazardous areas (Electricalapparatusfor explosivegasztmospheres-Part 10. ClassificationofHazardousareas) IEC 60079-11 Electrical apparatus for explosive gas atmospheres - Part 11. the intrinsically safe "i" protection equipment (Electrical apparatusforexplosivegasztmospheres-Part 11. IntrinsicSatety "i") IEC 60079-13 Electrical apparatus for explosive gas atmospheres - Part 13. Construction and use of rooms or buildings of positive pressure (Elec- tricalapparatusforexplosivegasztmospheres-Part 13. Constructionanduseofroomsorbuildings protectedbypressurization) IEC 60079-14 Electrical apparatus for explosive gas atmospheres - Part 14. Electrical installations in hazardous locations (except coal mines) (Electricalapparatusforexplosivegasztmospheres-Part 14. Electricalinstalationsinhazardous areas (otherthenmines)) IEC 61082 (alparts) preparation of documents used in electrotechnology (Preparationofdocumentsusedinelectrotechnolgy) IEC 61285 industrial process control - Analysis of cabin safety (Industrial-processcontrol-Safetyofanalyserhouses) IEC 61355 equipment, systems and device files and classification codes (Classificationanddesignationofdocuments forplants, systemsandequipment) IEC 61506 industrial process measurement and control applications software documentation set (Industrial-processmeasuremrntand control-Documentationofapplicationsoftware) IEC /T R61831 online analyzer system design and installation guide (Guidetothedesignandinstalationofon- lineanalysersystems) ISO 9000 (alparts) quality management and quality assurance standards (Qualitymanagementandqualityassurancestand- ards) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29813-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 29813-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 29813-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29813-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |