GB/T 28566-2012 English PDFUS$1129.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28566-2012: Security specification and its evaluation for generating unit interconnection Status: Valid
Basic dataStandard ID: GB/T 28566-2012 (GB/T28566-2012)Description (Translated English): Security specification and its evaluation for generating unit interconnection Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F20 Classification of International Standard: 27.100 Word Count Estimation: 51,585 Quoted Standard: GB 311.1-2012; GB 755-2008; GB/T 4703-2007; GB 4962-2008; GB/T 7064-2008; GB/T 7409.3-2007; GB/T 7894-2009; GB/T 8349-2000; GB 10963.2-2008; GB/T 14285-2006; GB/T 15468-2006; GB 16847-1997; GB/T 18482-2010; GB/T 20160-2006; GB/T 26218.1; GB/T 26218.2; GB/ Regulation (derived from): National Standards Bulletin No. 13 of 2012 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the electrical grid generator primary equipment and systems, secondary electrical equipment and systems, scheduling, operation and safety management of the three essential aspects of safety evaluation of projects and evaluation of GB/T 28566-2012: Security specification and its evaluation for generating unit interconnection---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Security specification and its evaluation for generating unit interconnection ICS 27.100 F20 National Standards of People's Republic of China Generators and network security conditions and evaluation Issued on. 2012-06-29 2012-11-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsPreface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 3 4 essential item 4 5 Evaluation Item 7 5.1 Electrical Equipment and System 7 5.1.1 generator 7 5.1.2 transformer and high voltage shunt reactors 9 5.1.3 high-voltage electrical equipment 10 5.1.4 plant (station) power system 14 5.1.5 Technical measures to prevent electrical misuse 15 5.2 Secondary Electrical Equipment and Systems 16 5.2.1 Excitation System 16 21 5.2.2 Relay 26 5.2.3 Automatic Safety Device 5.2.4 static frequency converter (SFC) 28 5.2.5 Dispatching Automation 29 34 5.2.6 Power System Communication 5.2.7 DC system 37 5.2.8 Primary Frequency 38 5.2.9 Secondary System Security 42 5.3 Dispatching and safety management 44 5.3.1 Dispatching 44 5.3.2 Security Management 45ForewordThis standard was drafted in accordance with GB/T 1.1-2009 given rules. The standard proposed by the State Electricity Regulatory Commission. This standard by the National Electricity Regulatory Standardization Technical Committee (SAC/TC296) centralized. This standard was drafted. State Electricity Regulatory Commission, Chinese Society of Electrical Engineering, the State Grid Corporation, China Southern Power Grid Co. The company, China Huaneng Group, China Datang Corporation, China Huadian Corporation, China Guodian Corporation, China Power Investment Set Group Company, Beijing Guohua Electric Power Co., Ltd., North China Electric Power Research Institute Co., Ltd., Beijing Institute of Electrical Engineering. The main drafters of this standard. Lu Yanchang, Chen Feng, pool army PROCEEDINGS OF THE Huangyou Ru, Wang Jinping, cold hi Wu, Zheng Yaodong, Liu Yinshun, Shen Yan red, Huxiang Yan, Ma Jixian Datong - Bai Yamin, Li Jinsong, Li Heping, Li Xian, Wu Maolin, Shen Bing Shen, Zhang Jie, Zhang Kui Zhang, Su Weimin, Yang Xinping, Yangzhen Yong Rong Yan, Han Fukun, Lei Weimin, Cai Xinhua, Fan Yulin.IntroductionGenerators and network security assessment is an important part of power production safety supervision and management, comprehensive diagnosis and evaluation grid Generators safe and stable operation capacity to ensure the safe and stable operation of the grid and grid power plants is very important. In order to standardize the work, Country Home Electricity Regulatory Commission entrusted Chinese Society of Electrical Engineering organized power generation companies, power companies and dispatch agencies, research institutes, intermediary organizations Experts prepared this standard. This standard is the basis of summing up the power industry for many years to carry generators and network security evaluation work experience, in accordance with laws and regulations, standard And quasi-normative documents, considering the power system development, technological advances and new issues associated with the emergence of new technologies proposed hair Turbines and network security prerequisites and specific evaluation projects to meet the objective needs of the current power system development to meet the electrical safety Supervision and management requirements. Generators and network security conditions and evaluation1 ScopeThis standard specifies the electrical grid generators and primary equipment and systems, electrical equipment and secondary systems, dispatching and security management three Aspect of the safety evaluation of the projects and the necessary evaluation of projects related evaluation methods and corresponding evaluation basis. This standard applies to stand-alone and network operation capacity of 50MW and above hydropower units, gas - steam combined cycle units, 100MW And above thermal power, nuclear power plants (conventional island portion). Other capacity of the above type of network operation and generators can be implemented by reference.2 Normative referencesThe following documents for the application of this standard is essential. For dated references, only the dated version applies to this standard quasi. For undated references, the latest edition (including any amendments) applies to this standard. GB 311.1-2012 insulation coordination - Part 1. Definitions, principles and rules GB 755-2008 rotating motor fixed and performance GB/T 4703-2007 Capacitor Voltage Transformer GB 4962-2008 the use of hydrogen safety technology GB/T 7064-2008 Technical requirements implicit pole synchronous generator GB/T 7409.3-2007 synchronous motor excitation system for large and medium synchronous generator excitation system technical requirements GB/T 7894-2009 hydroelectric basic technical conditions GB/T 8349-2000 metal enclosed bus Breakers for ac and dc. GB 10963.2-2008 household and similar circuit breakers for overcurrent protection - Part 2 GB/T 14285-2006 relaying protection and security automatic device technical regulations GB/T 15468-2006 turbine basic technical requirements GB 16847-1997 protection technology requirements for current transformers for transient performance GB/T 18482-2010 reversible pumped storage units start trial operation procedure GB/T 20160-2006 rotating electrical insulation resistance test GB/T 26218.1 under filthy conditions Insulators selection and sizing - Part 1. Definitions, information and general in principle GB/T 26218.2 under filthy conditions Insulators selection and sizing Part 2. AC system with porcelain and glass Glass insulators By GB/T 26218.3 filthy conditions Insulators selection and sizing Part 3. AC composite systems must Sub edge GB 50147-2010 electrical equipment installation engineering construction and acceptance of high-voltage electrical GB 50150-2006 works of electrical installations electrical equipment handover test standard GB 50217-2007 Code for design of cables of electric engineering GB 50229-2006 Code for fire protection design of power plant and substation AQ/T 9002-2006 production units Emergency Response Establishment Regulations DL408-1991 electrical safety regulations (power plants and substations electrical parts) ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28566-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28566-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 28566-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28566-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |