GB/T 25382-2010 English PDFUS$189.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 25382-2010: Regulations for operational acceptance test of off-grid wind/solar hybrid generator system Status: Valid
Basic dataStandard ID: GB/T 25382-2010 (GB/T25382-2010)Description (Translated English): Regulations for operational acceptance test of off-grid wind/solar hybrid generator system Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F11 Classification of International Standard: 27.180�� Word Count Estimation: 8,820 Date of Issue: 2010-11-10 Date of Implementation: 2011-03-01 Quoted Standard: GB/T 2297; GB/T 2900.53; GB/T 5465.2; GB/T 19064-2003; GB/T 20319-2006; GB/T 20321.1; GB/T 20321.2; DL/T 499-2001; JB/T 6939.1; JB/T 6939.2; YD/T 1058-2007 Regulation (derived from): Announcement of Newly Approved National Standards 2010 No. 8 (No. 163 overall) Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies the storage type DC bus type, the total system (Hybrid) Power 100 kW and below the off-grid wind and solar power generation system acceptance procedures, methods and documents to close the face and other norms. This standard applies to off-grid wind turbine and solar photovoltaic modules (array) consisting of DC bus energy storage type, the total system (Hybrid) Power 100 kW and the following complementary centralized power system put into operation before the face of the closing. GB/T 25382-2010: Regulations for operational acceptance test of off-grid wind/solar hybrid generator system---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Regulations for operational acceptance test of off-grid wind/solar hybrid generator system ICS 27.180 F11 National Standards of People's Republic of China Off-grid wind and solar power generation system Operational Acceptance Specification Issued on. 2010-11-10 2011-03-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Acceptance Procedure 1 5 Acceptance Test Method 3 6 acceptance documents 4ForewordThe standard proposed by China Machinery Industry Federation. This standard by the National Standardization Technical Committee on mechanical wind (SAC/TC50) centralized. This standard was drafted. Chinese Academy of Agricultural Mechanization Sciences Branch of Hohhot, Beijing Far East Bo wind power Equipment Co., Ltd. The main drafters of this standard. MATERNAL are Zhijie, Liling Rui. Off-grid wind and solar power generation system Operational Acceptance Specification1 ScopeThis standard specifies the storage type DC bus type, system total (mixing) and below 100kW of power off-grid wind and solar power generation system Acceptance procedures, methods and acceptance specifications and other documents. This standard applies to the off-grid wind turbine and solar photovoltaic modules (array) consisting of energy storage DC bus type, total system (Hybrid) power 100kW and below complementary centralized supply system before running into acceptance.2 Normative referencesThe following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard. GB/T 2297 solar photovoltaic energy systems - GB/T 2900.53 Electrotechnical terminology Wind turbine generator (GB/T 2900.53-2001, IEC 60050-415.1999, IDT) GB/T 5465.2 electrical equipment - Graphical symbols - Part 2. Graphical symbols (GB/T 5465.2-2008, IEC 60417 DB.2007, IDT) GB/T 19064-2003 household solar photovoltaic power system technical requirements and test methods GB/T 20319-2006 acceptance of wind turbines GB/T 20321.1 inverter Part 1 Off-grid wind and solar power system. technical conditions Test Method. GB/T 20321.2 off-grid wind and solar inverter systems - Part 2 Generation DL/T 499-2001 Technical Specification for the rural low voltage power JB/T 6939.1 off-grid wind turbine controller with Part 1. Technical conditions JB/T 6939.2 off-grid wind turbine controller with Part 2. Test methods YD/T 1058-2007 communication frequency switching power supply system3 Terms and DefinitionsGB/T 2297, the terms and definitions GB/T 2900.53 established in applicable to this standard.4 Acceptance Program4.1 General Acceptance of the system is divided into pre-acceptance stage and the final acceptance stage. The basic function of the pre-acceptance phase main assessment system and various equipment And control parameter settings, etc; completion and acceptance of the main assessment phase power conversion control system performance, security features, quality of power supply and so on. 4.2 pre-acceptance 4.2.1 Field Test 4.2.1.1 After the installation completed, check the equipment before applying power shall meet the following requirements. a) site should be cleared; b) The device installation is completed and confirmed; c) The correct installation and construction equipment, placed firmly, closely connected; d) between the wind turbines, photovoltaic arrays, buildings, trees and power lines from the local power grid overhead safety, rational layout, no shadow Normal response of each device, safe operation and easy operation personnel; ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 25382-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 25382-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 25382-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 25382-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |