GB/T 17824.1-2022 English PDFUS$269.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 17824.1-2022: Construction for intensive pig farms Status: Valid GB/T 17824.1: Historical versions
Basic dataStandard ID: GB/T 17824.1-2022 (GB/T17824.1-2022)Description (Translated English): Construction for intensive pig farms Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: B43 Classification of International Standard: 65.020.30 Word Count Estimation: 14,163 Date of Issue: 2022-10-14 Date of Implementation: 2023-05-01 Older Standard (superseded by this standard): GB/T 17824.1-2008 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 17824.1-2022: Construction for intensive pig farms---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Construction for intensive pig farms ICS 65.020.30 CCSB43 National Standards of People's Republic of China Replacing GB/T 17824.1-2008 Large-scale pig farm construction Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration forewordThis document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document is part 1 of GB/T 17824.GB/T 17824 has published the following parts. --- Part 1.Construction of scale pig farms; --- Part 2.Technical regulations for the production of large-scale pig farms; --- Part 3.Environmental parameters and environmental management of large-scale pig farms. This document replaces GB/T 17824.1-2008 "Large-scale Pig Farm Construction". Compared with GB/T 17824.1-2008, except for structural adjustment and compilation In addition to the editorial changes, the main technical changes are as follows. a) site selection has been changed (see Chapter 4, Chapter 6 of the.2008 edition); b) Changed the layout of the pig farm (see Chapter 5, Chapter 7 of the.2008 edition); c) Change "construction area" to "construction land" (see Chapter 6, Chapter 5 of the.2008 edition); d) Changed herd turnover (see 7.1, 4.1 of the.2008 edition); e) increase the herd production parameters (see 7.2); f) Changed herd structure (see 7.3, 4.2 of the.2008 edition); g) Changed the house configuration (see 7.4, 4.3 of the.2008 edition); h) Changed the equipment selection (see 8.2, 10.2 of the.2008 edition); i) Changed water and electricity supply (see Chapter 9, Chapter 9 of the.2008 edition); j) Changed the construction requirements (see Chapter 10, Chapter 8 of the.2008 edition). Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by the Ministry of Agriculture and Rural Affairs of the People's Republic of China. This document is under the jurisdiction of the National Standardization Technical Committee of Animal Husbandry (SAC/TC274). This document is drafted by. Institute of Animal Husbandry and Veterinary Medicine, Beijing Academy of Agriculture and Forestry, Engineering Construction Service Center of the Ministry of Agriculture and Rural Affairs, Ministry of Agriculture and Rural Affairs Planning and Design Institute, China Agricultural University, Beijing Institute of Animal Husbandry and Veterinary Sciences, Chinese Academy of Agricultural Sciences. The main drafters of this document. Ji Haifeng, Wang Sixin, Zhang Dongyan, Geng Rulin, Ding Xiaoming, Wang Jing, Liu Hui, Cao Nan, Chen Meixia, Zang Jianjun, Chen Yiyuan, Zheng Shanshan, Wang Shuaiqin. The previous versions of this document and its superseded documents are as follows. ---First published in.1999 as GB/T 17824.1-1999; --- In the first revision in.2008, the content of GB/T 17824.3-1999 "Medium and Small Intensive Pig Farm Equipment" was incorporated; ---This is the second revision.IntroductionLarge-scale breeding is the mainstream direction of the development of pig industry, with high technological content, which is conducive to improving breeding efficiency and controlling product quality. Pig Rules Model breeding involves the main contents of pig farm hardware construction, pig production management technology and pig production environment. Good pig farm hardware, feeding management Technology and production environment conditions can greatly improve the health level and production performance of the pig herd, and drive the high-level development of the pig industry. GB/T 17824 It aims to provide advanced and practical scientific and technological support for large-scale pig breeding, and consists of three parts. --- Part 1.Construction of scale pig farms. The purpose is to standardize the site selection, farm layout, construction land, and feeding of large-scale pig farms. Process, facility equipment, water and electricity supply and pig house building requirements, improve the biosecurity level of pig farms, improve the breeding conditions of pig herds, Improve the health and performance of your herd. --- Part 2.Technical regulations for the production of large-scale pig farms. The purpose is to standardize the production technology, introduction and retention of various links in large-scale pig farms. Technical requirements such as species, feed requirements, pig herd management, veterinary epidemic prevention and production records, etc., to improve the production management level of large-scale pig farms and breeding Production efficiency. --- Part 3.Environmental parameters and environmental management of large-scale pig farms. The purpose is to regulate the farm area and pig house environment of large-scale pig farms. According to the number and management requirements, to create good environmental conditions for pig farms and pigs in the house, and to promote the healthy, efficient and efficient production of pigs on a large scale. sustainable development. The construction of large-scale pig farms is a necessary condition for the development of the pig industry. GB/T 17824.1 regulates the site selection and layout of pig farms for large-scale pig farms Bureau, construction land, breeding technology, facilities and equipment, water and electricity supply and pig house construction requirements are of great significance to the high-quality development of large-scale pig farms. Large-scale pig farm construction1 ScopeThis document specifies the site selection, farm layout, construction land, breeding techniques, facilities and equipment, water and electricity supply and pig farm construction for large-scale pig farms. House building requirements. This document is applicable to newly-built, renovated and expanded pig farms, and other types of pig farms can be referred to.2 Normative referencesThe contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB 5749 Hygienic Standard for Drinking Water GB/T 17824.3 Environmental parameters and environmental management of large-scale pig farms GB 50016 Code for fire protection of building design NY/T 388 Environmental Quality Standard for Livestock and Poultry Farms3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Scale pig farms intensivepigfarms Adopt modern pig raising technology and facilities and equipment, implement batch, all-in and all-out production process, and keep more than 100 basic sows or annual output. Self-propagating and self-raising pig farms, professional sow farms, and professional fattening pig farms with more than 500 commercial pigs. 3.2 foundation sow foundationsow breedingsow breedingsow Breeding sows with normal reproductive capacity. Note. Including empty pregnant sows, pregnant sows and lactating sows. 3.3 Professional sow farm sowfarm Pig farms dedicated to raising sows for breeding piglets. 3.4 Professional fattening farm pig-fattingfarm Pig farms dedicated to growing and finishing pigs.4 Site selection4.1 The site selection of pig farms shall comply with the laws and regulations of the state and local governments, and shall meet the conditions for animal epidemic prevention. should not be in the following areas ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 17824.1-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 17824.1-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 17824.1-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 17824.1-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB/T 17824.1-2022?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 17824.1-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |