Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 16453.6-2008 English PDF

US$189.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 16453.6-2008: Comprehensive control of soil and water conservation -- Technical specification -- Technique for erosion control of collapse hill
Status: Valid

GB/T 16453.6: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 16453.6-2008189 Add to Cart 3 days Comprehensive control of soil and water conservation -- Technical specification -- Technique for erosion control of collapse hill Valid
GB/T 16453.6-1996279 Add to Cart 3 days Regulation of techniques for comprehensive control of soil erosion--Technique for erosion control of collapse hill Obsolete

Similar standards

NY/T 1121.10   GB 20287   NY/T 1121.11   GB/T 16453.3   GB/T 16453.4   GB/T 16453.2   

Basic data

Standard ID: GB/T 16453.6-2008 (GB/T16453.6-2008)
Description (Translated English): Comprehensive control of soil and water conservation -- Technical specification -- Technique for erosion control of collapse hill
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: B11
Classification of International Standard: 13.080
Word Count Estimation: 8,814
Date of Issue: 2008-11-14
Date of Implementation: 2009-02-01
Older Standard (superseded by this standard): GB/T 16453.6-1996
Quoted Standard: GB/T 16453.2; GB/T 16453.3-2008
Regulation (derived from): National Standard Approval Announcement 2008 No.18 (Total No.131)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This standard specifies the planning dilapidated granite governance, design, such as construction and management of technical requirements. This section applies to southern China region has weathered granite hillock various forms of collapse hazard areas.

GB/T 16453.6-2008: Comprehensive control of soil and water conservation -- Technical specification -- Technique for erosion control of collapse hill


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Comprehensive control of soil and water conservation. Technical specification. Technique for erosion control of collapse hill ICS 13.080 B11 National Standards of People's Republic of China Replacing GB/T 16453.6-1996 Soil and Water Conservation Technical Specifications Collapsing Management Technology Posted 2008-11-14 2009-02-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

GB/T 16453 "soil and water conservation technical specifications" is divided into six parts. --- GB/T 16453.1-2008 soil and water conservation technical specifications slope land; --- GB/T 16453.2-2008 soil and water conservation technical specifications wasteland control technology; --- GB/T 16453.3-2008 soil and water conservation technical specifications Gully control technology; --- GB/T 16453.4-2008 soil and water conservation technical specifications for small storage discharge water diversion project; --- GB/T 16453.5-2008 soil and water conservation technical specifications sand control technology; --- GB/T 16453.6-2008 soil and water conservation technical specifications Collapsing Management technology. This Part replaces GB/T 16453.6-1996 "soil and water conservation technical specifications Collapsing Management technology." This section compared with the GB/T 16453.6-1996, modified as follows. a) "basic provisions" to "General"; b) 3.3.3 "Development of fruit production" to "the development of bamboo, tea, forestry, fruit and other economic plants"; c) 4.2.1 "catchment area" to "catchment area"; d) Remove 4.2.2,4.2.3,4.2.4 and 4.2.5, use the new provisions; e) 5.2.2 drainage ditches in function to the corresponding gradient drainage ditches laid; f) Remove the contents of the provisions of 5.3.2. Appendix A of this section is an informative annex. This part is proposed by the Ministry of Water Resources. This part of the jurisdiction of the Department of International Cooperation, Science and Technology. Drafting this Part. Division of Soil and Water Conservation, Ministry of Water Resources Monitoring Center, the middle reaches of the Yellow River Conservancy Commission on Management Bureau of Rural Water Conservation Bureau CONSERVANCY Yellow River Conservancy Commission, the Soil Conservation Service Changjiang Water Resources Commission, Songliao Water Resources Commission Water Conservancy Department, pearl River Water Resources Commission Water Conservancy Department, the Haihe River Water Resources Commission Water Conservancy Department, the Huaihe River Water Resources Commission Water Conservancy Department, Beijing Forestry University water Soil conservation institute. The main drafters of this section. Section Qiao Fu, Liu Wan Quan Wuchang Tian, \u200b\u200bXu Chuan early Tong Weili Lu Sheng force, rather heap tiger, cable Guo Yan, Chang India, Zhao Yongjun, Chen Fayum, FORESTRY AND Chen Lihua, Cong Peijuan, often Dandong, Feng Wei, Li Qi. This part of the standard replaces the previous editions are. --- GB/T 16453.6-1996.

Introduction

GB/T 16453.6-1996 been implemented ten years, in terms of soil and water conservation has played an important role in guiding. along with Changes in economic and social development of China's rural industrial structure, the content of soil and water conservation, nature, etc. has undergone profound changes. In order to adapt to the soil and water conservation work under the new situation, to further regulate soil and water conservation technical specifications, according to the Department of International Cooperation & SCIENCE Technology Division, Division of Soil and Water Conservation unified arrangements have been revised. Soil and Water Conservation Technical Specifications Collapsing Management Technology

1 Scope

GB/T 16453 provisions of this part of the planning, design, construction management and technical requirements for Dilapidated Granite governance. This section applies to southern China region has weathered granite in various forms Dilapidated Granite hazard areas.

2 Normative references

The following documents contain provisions which, through GB/T 16453 reference in this text, constitute provisions of this part. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. GB/T 16453.2 soil and water conservation technical specifications wasteland Treatment Technology GB/T 16453.3-2008 soil and water conservation technical specifications Gully Treatment Technology

3 General

3.1 According to the characteristics and law of development of Collapsing Hill should be taken of both prevention and treatment approach that might produce Collapsing Hill slopes, take preventive Protection measures; for Dilapidated Granite has been generated, integrated management measures should be taken. 3.2 Preventive measures should meet the following requirements. 3.2.1 weathered granite hillside prohibited digging roots, stripping vegetation and ground damage vegetation and ground vegetation should be restored as soon as possible through the enclosure. 3.2.2 Slope natural waterway network, should be beefing drainage ditches, gutters and storage tanks and other types of small and Drainage Project, impoundment, dispersed Table runoff discharged into the collapse to prevent the occurrence and development of post chipping caused. 3.3 Collapsing Management shall meet the following requirements. 3.3.1 Each chipping as a catchment area, according to local conditions, Comprehensive Measures. 3.3.3 Governance and Development in combination. the use of chipping inside and outside of land resources, the development of bamboo, tea, forestry, fruit and other economic plants.

4 Planning

4.1 Collapsing Management Planning 4.1.1 Slump Gully development areas should be administrative division (county, township and village) or natural divisions (catchment) as a unit, in the investigation of soil erosion Dilapidated Granite carried out a special investigation, to identify the number of ports in the planning of collapse, size (length, width, depth), and other development and damages. 4.1.2 soil and water conservation planning, governance should be prepared collapse Kong Special Plan proposes specific control measures and the Hazard severity and treatment Li urgency, arrange the order of governance. 4.1.3 Collapsing Hill slopes may arise, should propose specific preventive measures in soil and water conservation plan, including protection, restoration and ground vegetation Storing, dispersed runoff measures. 4.2 chipping management planning 4.2.1 chipping upstream catchment area, according to the different terrain and slope, cut drainage measures taken to prevent runoff into the chipping. Bengbi intraoral 4.2.2 collapse, slope cutting should first repair order, stability of the slope, and then plant trees and grass, consolidate Bengbi.
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 16453.6-2008_English be delivered?

Answer: Upon your order, we will start to translate GB/T 16453.6-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 16453.6-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 16453.6-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 16453.6-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 16453.6-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.