| GB/T 14598.127-2013 English PDFUS$434.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 14598.127-2013: Measuring relays and protection equipment -- Part 127: Functional requirements for over/under voltage protection Status: Valid 
 Basic dataStandard ID: GB/T 14598.127-2013 (GB/T14598.127-2013)Description (Translated English): Measuring relays and protection equipment -- Part 127: Functional requirements for over/under voltage protection Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: K45 Classification of International Standard: 29.120.70 Word Count Estimation: 22,262 Quoted Standard: IEC 60044-1; IEC 60044-2; IEC 60044-3; IEC 60044-5; IEC 60044-6; IEC 60044-7; IEC 60044-8; IEC 60255-1 Adopted Standard: IEC 60255-127-2010, IDT Regulation (derived from): National Standards Bulletin 2013 No. 10 Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China Summary: This standard specifies: Over/under voltage relay minimum requirements. This standard includes protection, measurement characteristics and delay characteristics technical specifications. This standard provides for the steady-state accuracy and dynamic per GB/T 14598.127-2013: Measuring relays and protection equipment -- Part 127: Functional requirements for over/under voltage protection---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Measuring relays and protection equipment Part 127. Functional requirements for over/under voltage protection ICS 29.120.70 K45 National Standards of People's Republic of China Measuring relays and protection equipment Part 127. Over/under voltage protection requirements Part 127. Functionalrequirementsforover/undervoltageprotection (IEC 60255-127.2010, IDT) Issued on. 2013-07-19 2013-12-02 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released Table of ContentsIntroduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Functional Specification 2 4.1 Overview 2 4.2 input energizing quantity/energizing 3 4.3 switch input signal 3 4.4 Function Logic 3 4.4.1 operating characteristic 3 4.4.2 reversion characteristic 6 4.5 switching outputs 8 4.5.1 start signal 8 4.5.2 Action (trip) signal 8 4.5.3 Additional switching outputs 8 5 Performance Specifications 8 5.1 and features related to the accuracy of the amount of 8 5.2 accuracy and time-related actions 8 5.3 accuracy and reset time-related 8 5.4 Transient Performance 9 5.4.1 Overshoot time 9 5.4.2 Characteristics of the amount of change over time in response to 9 5.5 voltage transformer requirements 9 6 function test methods 9 6.1 Overview 9 6.2 and features related to the amount of steady-state error of measurement 9 6.2.1 value (start value) accuracy 9 6.2.2 reversion coefficient measuring 10 6.3 steady-state error start time and operation time of measurement 10 Steady-state error reset time measurement 11 6.4 6.5 Transient Performance Measurement 12 6.5.1 undervoltage protection overshoot time 6.5.2 response characteristic variation with time it definite time relay 12 13 7 Documentation Requirements 13 7.1 Type test report 7.2 Other user documentation 13 Appendix A (informative) just for the trip output relay reset time is measured 15 References 16 1 a schematic block diagram in Figure 3 protection 2 over-voltage relay independent time characteristic 4 Figure 3 under voltage relay independent time characteristic 4 Figure 4 overvoltage protection it definite time characteristic 5 Figure 5 undervoltage protection it definite time characteristic 6 Figure 6 definite time reset characteristic 7 7 definite time reset feature (options. instantaneous relay after reset) 7 8 12 test waveforms Figure A.1 it definite time slot time determination 15 Table 1 Overvoltage element test point 11 Table 2 undervoltage element test point 11 Table 3 Overvoltage element test point 11 Table 4 under voltage element 12 pilot sites Table 5 Test recommended 13ForewordGB/T 14598 "for measuring relays and protection equipment" is divided into several parts. --- GB/T 14598.1 Electrical relays - Part 23. Contact performance; --- GB/T 14598.2 metric Part 1 relays and protection equipment. General requirements; --- GB/T 14598.3 Electrical relays - Part 5. Measuring relays and protection equipment insulation coordination requirements and tests; --- GB/T 14598.4 Electrical relays Part XIV. Endurance test for electrical relay contacts - contact loads excellent First value; --- GB/T 14598.5 Electrical relays Part XV. characteristic electrical relay contacts life test test equipment specification; --- GB/T 14598.6 Electrical relays - Part 18. There are no size or generic relay; --- GB/T 14598.7 Electrical relays - Part 3. Single input dependent or independent time energizing quantity measuring relays; --- GB/T 14598.8 Electrical relays - Part 20. Protection System; --- GB/T 14598.9 metric Part 22-3 relays and protection equipment. Electrical disturbance tests - Radiated electromagnetic field disturbance test; --- GB/T 14598.10 measuring relays and protection equipment - Part 22-4. Electrical disturbance tests - Electrical fast transient/burst Immunity test; --- GB/T 14598.11 metric Part 11 relays and protection equipment. Auxiliary power port voltage dips, short interruptions, power Pressure variations and ripple; --- GB/T 14598.13 Electrical relays - Part 22-1. Electrical disturbance tests for measuring relays and protection equipment - 1MHz burst immunity test; --- GB/T 14598.14 measuring relays and protection equipment - Part 22-2. Electrical disturbance tests - Electrostatic discharge tests; --- GB/T 14598.15 Electrical relays - Part 8. Thermal electrical relays; --- GB/T 14598.16 Electrical relays - Part 25. Electromagnetic emission tests measure relays and protection equipment; --- GB/T 14598.17 Electrical relays - Part 22-6. Measuring relays and protection equipment - Electrical disturbance tests - RF Field-induced immunity to conducted disturbances; --- GB/T 14598.18 metric 22-5 Part relays and protection equipment. Electrical disturbance tests - Surge immunity test; --- GB/T 14598.19 Electrical relays - Part 22-7. Measuring relays and protection equipment - Electrical disturbance tests - frequency Immunity test; --- Part 26 GB/T 14598.20 Electrical relays. measurement of electromagnetic relays and protection equipment compatibility requirements; --- GB 14598.27 metric Part 27 relays and protection devices. product safety requirements; --- GB/T 14598.127 metric Part 127 relays and protection devices. Over/under voltage protection requirements; --- GB/T 14598.151 metric Part 151 relays and protection equipment. over/under current protection requirements; --- GB/T 14598.300 microprocessor transformer protection equipment requirements; --- GB/T 14598.301 microprocessor-based generator and transformer fault recorder technology requirements; --- GB/T 14598.303 digital motor protection devices General. This section GB/T 14598 Part 127. This section drafted in accordance with GB/T 1.1-2009 given rules. This section uses the translation method identical with IEC 60255-127.2010 "Measuring relays and protection equipment - Part 127. Over/under power Voltage protection function requirements. " Consistency correspondence between this part of the international standard documents and normative references of our files are as follows. --- GB/T 14598.2-2011 metric Part 1 relays and protection equipment. General requirements (IEC 60255-1.2009, IDT). This part is proposed by the China Electrical Equipment Industrial Association. This section relays and protection equipment Standardization Technical Committee (SAC/TC154) is administered by the national measure. This section is drafted. Beijing Purple Control Co., Ltd., Xuchang smart grid equipment Test and Research Institute, Nanjing NARI-RELAYS Electric Co. Company, Beijing Sifang Automation Co., Ltd., Guodian Nanjing Automation Co., Ltd., XJ Electric Co., Ltd., Xuchang Cape Electrical Testing Institute, integrated into Electronics Co., Ltd., Dongfang Electronics Co., Ltd., Zhuhai Wanlida Electric Co., Ltd., Hebei North Heng Electrical Technology Co., Ltd. Shanghai relay, Schneider Electric (China) Investment Co., Ltd., ABB (China) Limited Company Jiang Su Jinzhi Technology Co., Schneider Electric (China) Investment Co., Ltd. Shanghai Branch, Shenzhen NARI Technologies Co. Secretary, Chongqing New Century Electric Co., Ltd. The main drafters of this section. GE Rong Shang, Li Zhiyong, Ling Gang, Tu Liming, Wangyou Long, Fanzhan Feng, Chen, Du Sheng-yun, right constitution Jun, Zhu Zhiwei, Tian Jianjun, Yizhi Ming, Yao Li, Li Yan, Shen Jun, Song gather in Zhang Guangjia, Zhangtai Qin, Yao Zhiqing, YANG Hui-xia, Zhang Xiling, Chiang former crown. Measuring relays and protection equipment Part 127. Over/under voltage protection requirements1 ScopeThis section provides the over/under voltage relay minimum requirements. This section includes protection, measurement technology characteristics and delay characteristics specification. This section specifies the factors affecting the accuracy of the steady-state and dynamic performance, including test methods for testing the performance and accuracy. This section covers the over/undervoltage functions are as follows. IEEEStdC37.2 Function code IEC 61850-7-4 Logical nodes Phase undervoltage protection 27 PTUV Positive sequence undervoltage protection 27D PTUV Overvoltage protection 59 PTOV The remaining/residual overvoltage protection 59N/59G PTOV Negative sequence/unbalance overvoltage protection 47 PTOV Measuring relays and protection equipment - General requirements according to the provisions of IEC 60255-1.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. IEC 60044 (all parts) instrument transformers (Instrumenttransformers) IEC 60255-1 Part 1 measurement relays and protection equipment. General requirements (Measuringrelaysandprotection equipment-Part 1. Commonrequirments)3 Terms and DefinitionsThe following terms and definitions apply to this document. 3.1 Time - characteristic values \u200b\u200bof the theoretical curve theoreticalcurveoftimeversuscharacteristicquantity A graph showing the relationship between the theory of operation time and its characteristic values. 3.2 Upper limit and lower limit operation time curve curvesofmaximumandminimumlimitsoftheoperatetime Time - characteristic values \u200b\u200bof the theoretical curve on both sides of the limit error curve, representing each characteristic value corresponding to the maximum, the minimum operating time. 3.3 Characteristic amount value (start value) settingvalue (start) ofthecharacteristicquantity GS The characteristic curve of the reference value of the theoretical amount - for a predetermined time. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 14598.127-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 14598.127-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 14598.127-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 14598.127-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |