GB 50496-2018 PDF EnglishUS$510.00 · In stock · Download in 9 seconds
GB 50496-2018: Code for construction of mass concrete Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid GB 50496: Historical versions
Similar standardsGB 50496-2018: Code for construction of mass concrete---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50496-2018GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB/T 50496-2018 Standard for construction of mass concrete Issued on. APRIL 25, 2018 Implemented on. DECEMBER 01, 2018 Issued by. Ministry of Housing and Urban-Rural Development of PRC. State Administration for Market Regulation. Standard for construction of mass concrete Main drafting organization. Ministry of Housing and Urban-Rural Development of PRC Approved by. Ministry of Housing and Urban-Rural Development of PRC Date of implementation. December 01, 2018 China Construction Industry Press 2018 Beijing Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China 2018 No.77 Table of ContentsForeword... 5 1 General provisions... 8 2 Terms and symbol... 8 3 Basic requirements... 13 4 Materials, mix proportioning, production and transportation... 14 5 Construction... 18 6 Temperature monitor and control... 23 Appendix A Computing method for concrete pump output and carriers... 26 Appendix B Computing method of thermal stress and shrinkage stress during construction of mass concrete... 27 Appendix C Computing method of insulation layer thickness of mass concrete... 37 Explanation of wording in this standard... 40 List of quoted standards... 411 General provisions1.0.1 This standard is formulated in order to implement national technical and economic policies in mass concrete construction, ensure project quality, achieve advanced technology, reasonable process, resource saving, environment protection. 1.0.2 This standard applies to mass concrete construction in concrete structures. It is not applicable to the construction of roller compacted concrete and hydraulic mass concrete. 1.0.3 In addition to complying with this standard, mass concrete construction shall also comply with the relevant current national standards.2 Terms and symbol2.1 Terms 2.1.1 Mass concrete A large volume concrete which has a minimum physical dimension of not less than 1 m, OR concrete which is expected to cause harmful cracks due to temperature changes and shrinkage caused by hydration of the cementitious materials in the concrete. 2.1.2 Cementitious material A general term for Portland cement and active mineral admixtures used to prepare concrete. 2.1.5 Vertical construction seam The vertical reserved joint which is left in appropriate positions, when the pouring pause time may exceed the initial setting time of concrete, during the noncontinuous placing of concrete. 2.1.6 Horizontal construction seam The horizontal reserved joint which is left in appropriate positions, when the pouring pause time may exceed the initial setting time of concrete, during the noncontinuous placing of concrete. 2.1.7 Thermal stress The stress generated inside the concrete, when the temperature deformation of the concrete is restrained. 2.1.8 Shrinkage stress The stress generated inside the concrete, when the shrinkage deformation of the concrete is restrained. 2.1.9 Peak value of rising temperature The maximum temperature rise inside the concrete cast block. 2.1.10 Temperature difference of core and surface The difference -- between the maximum temperature inside the concrete block and the temperature 50 mm inside the outer surface. 2.2 Symbol 2.2.1 Temperature and material properties a - Thermal diffusivity of concrete; C - Specific heat capacity of concrete;3 Basic requirements3.0.1 Mass concrete construction shall prepare a construction program or construction technical plan, which shall include technical measures for environmental protection and safe construction. 3.0.4 The temperature control indicators for mass concrete construction shall comply with the following requirements. 3.0.6 Mass concrete construction shall adopt energy-saving, material-saving, water- saving, land-saving, environmental protection measures. It shall comply with the relevant provisions of the current national standard "Code for green construction of building" GB/T 50905.4 Materials, mix proportioning, production and transportation4.1 General requirements 4.1.1 In addition to meeting the design requirements for strength grade, durability, impermeability, volume stability, the mass concrete's mix proportion design shall also meet the requirements for mass concrete construction technology; it shall use materials rationally and reduce the adiabatic temperature rise of concrete. 4.2 Materials 4.2.1 The selection and quality of cement shall comply with the following requirements. 4.2.2 When cement used for mass concrete enters the site, it shall check the cement variety, code, strength grade, packaging or bulk number, date of exit-factory, etc.; it shall inspect the strength, stability, setting time, heat of hydration of the cement. The inspection results shall comply with the relevant provisions of the current national standard "Common Portland cement" GB 175. 4.3.2 Before preparing concrete, it should conduct tests on technical parameters such as adiabatic temperature rise, bleeding rate, pumpability, etc. that have an impact on the control of cracks in mass concrete. If necessary, the mix proportioning design shall be verified through trial pumping. 4.3.3 When determining the concrete mix proportioning, it shall propose the technical measures for coarse and fine aggregate and mixing water during concrete preparation and control of temperature of mixture placing to mold, based on the requirements of the concrete adiabatic temperature rise and temperature control construction plan. 4.4 Production and transportation 4.4.4 The number of mixer trucks shall meet the requirements of concrete pouring technology; the calculation method can be determined according to Appendix A of this standard.5 Construction5.1 General requirements 5.1.1 The construction program of mass concrete construction shall include the following main contents. 5.1.3 The thickness of the thermal insulation covering layer can be determined based on Appendix C of this standard, according to the requirements of the temperature control indicators. 5.1.4 Mass concrete construction should adopt overall layered or push-type continuous pouring construction. 5.2 Technology preparation 5.2.1 Before the construction of mass concrete, it shall carry out joint review of the drawings; propose comprehensive anti-cracking measures during the construction stage; formulate the construction work instructions for key locations. 5.2.2 Mass concrete construction shall be carried out on the basis that the concrete formwork and brackets, steel bar engineering, embedded pipe fittings and other work have been completed and accepted. 5.3 Formwork 5.3.1 It shall check the bearing capacity, stiffness, overall stability of mass concrete formwork and brackets; it shall design the thermal insulation structure based on the maintenance methods used for mass concrete. 5.3.2 Safety and stability measures must be taken, during the installation, use, removal of formwork and support systems. 5.5 Curing 5.5.1 Mass concrete shall be cured with thermal insulation and moisturizing. After each concrete placing, in addition to regular curing as ordinary concrete, thermal insulation curing shall comply with the following requirements. 5.6 Construction in special climate 5.6.1 When mass concrete construction encounters high temperatures, winter, strong winds or rain or snow, measures must be taken to ensure the quality of concrete pouring.6 Temperature monitor and control6.0.1 The temperature difference of core and surface of the mass concrete, the descending speed of temperature, the ambient temperature shall be tested not less than 4 times every day and night after the concrete is placed; the temperature of mixture placing to mold shall be measured not less than 2 times per shift. 6.0.3 Strain test should be carried out according to project needs. 6.0.4 The selection of test components shall comply with the following requirements. 6.0.6 During the test process, the temperature change curve of each point and the cross- section temperature distribution curve shall be drawn. 6.0.7 When abnormal monitoring results are found, it shall sound the alarm immediately and take corresponding measures. 6.0.8 Temperature control measures can be adjusted in real time based on the following principles or methods and combined with monitoring data. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB 50496-2018 be delivered?Answer: The full copy PDF of English version of GB 50496-2018 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB 50496-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB 50496-2018_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 50496-2018 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.Question 5: Should I purchase the latest version GB 50496-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50496-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.How to buy and download a true PDF of English version of GB 50496-2018?A step-by-step guide to download PDF of GB 50496-2018_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB 50496-2018". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |