GB 50386-2016 English PDFGB 50386: Historical versions
Basic dataStandard ID: GB 50386-2016 (GB50386-2016)Description (Translated English): Code for acceptance of engineering installation for mechanical equipment of rolling mill Sector / Industry: National Standard Classification of Chinese Standard: P93 Classification of International Standard: 77.180 Word Count Estimation: 196,154 Date of Issue: 2016-08-18 Date of Implementation: 2017-04-01 Older Standard (superseded by this standard): GB 50386-2006 Quoted Standard: GB 50231; GB 50656; GB 50720; GB 50825; JGJ 46; JGJ 59; JGJ 80; JGJ 130; JGJ 166; JGJ 276 Regulation (derived from): Ministry of Housing and Urban - Rural Development Notice No.1274 of 2016 Issuing agency(ies): Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China Summary: This standard applies to the new, alteration and expansion of the rolling mill machinery and equipment installation acceptance. GB 50386-2006: Code for acceptance of engineering installation for mechanical equipment of rolling mill---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. GB UDC NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA P GB 50386-2006 Code for acceptance of engineering installation for mechanical equipment of rolling mill Issued on: SEPTEMBER 06, 2006 Implemented on: APRIL 01, 2007 Issued by. Ministry of Housing and Urban-Rural Development of the People’s Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (AQSIQ). NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Code for acceptance of engineering installation for mechanical equipment of rolling mill Chief editorial department. China Metallurgical Construction Association Approval department. Ministry of Housing and Urban-Rural Development of the People’s Republic of China Enforcement date. April 1, 2007 China Planning Press 2007·Beijing ForewordThis Code is organized by China Metallurgical Construction Association and specifically prepared by China Twentieth Metallurgical Construction Company, jointly with other organizations concerned according to the requirements in Notice on Printing and Distributing ‘Engineering Construction Standard Specifications Preparation and Revision Plan (Second Batch) for 2005’ (Jiao Biao Han [2005] No.124). In preparation process, specification preparation group studied the relevant existing national laws, regulations and standards, made an investigation, summed up experience on quality acceptance of engineering installation for mechanical equipment of rolling mill, conducted repeated revisions and discussions for provisions of the Code, extensively solicited opinions of relevant organizations and experts and finalized it after review. This Code is divided into 15 chapters, including general principles, basic regulations, foundation bolt and base plate, equipment and material approaching, installation works of host rolling mill column equipment, installation works of shearing machine, installation works of recoiling machine uncoiling machine, installation works of roller way, installation works of cooling bed, installation works of rolled products transportation equipment, installation works of overturn and transfer equipment, installation works of straightening machine, installation works of looping equipment, installation works of heating furnace, installation works of other devices of rolling mill as well as 4 annexes. Clauses of chapter 3 “Equipment foundation, foundation bolt and base plate” and chapter 4 “equipment and material approaching” involve sub-divisional works and are quality control elements that sub-divisional works have common character, so it is listed in a separate chapter. Boldface clauses in this Code are mandatory and must be strictly enforced. Ministry of Construction is in charge of this Code and responsible for interpretation of mandatory provisions of this Code; China Twentieth Metallurgical Construction Company is responsible for interpretation of specific technical contents. In order to improve quality of the Code, please try to sum up experience and accumulate data during implementation of this Code and feed relevant opinions and suggestions back to technology department of China Twentieth Metallurgical Construction Company (address. No. 777, Pangu Road, Baoshan District, Shanghai Postal code. 201900, E-mail. jishubu-20mcc@126.com) at any time for reference in future revision. Chief preparation organization, organizations participating in preparation and main drafters. Chief preparation organization. China Twentieth Metallurgical Construction Company Organizations participating in preparation. Metallurgical Industry Engineering Quality Supervision Station Baosteel Supervision Station China First Metallurgical Construction CompanyTable of Contents1 General Principles ... 8 2 Basic Regulations ... 10 3 Equipment Foundation, Foundation Bolt and Base Plate ... 19 3.1 General Provisions ... 19 3.2 Equipment Foundation ... 19 3.3 Foundation Bolt ... 20 3.4 Base Plate ... 20 4 Equipment and Material Approaching ... 22 4.1 General Provisions ... 22 4.2 Equipment ... 22 5 Installation Works of Rolling Mill Host Column Equipment ... 23 5.1 General Provisions ... 23 5.2 Rolling Mill Base Installation ... 23 5.3 Rolling Mill Rack Installation ... 25 5.4 Roller Adjustment Device Installation ... 31 5.5 Transmission Gear Installation of Rolling Mill ... 32 5.6 Mill Roll Changing Device Installation ... 35 5.7 Test Run of Rolling Mill Host Column Equipment ... 38 6 Installation Works of Shearing Machine ... 40 6.1 General Provisions ... 40 6.2 Shearing Machine Foundation Installation ... 40 6.3 Billet Shearing Machine Rack Installation ... 40 6.4 Billet Shearing Machine Blade Changing Device Installation ... 42 6.5 Transmission Reduction Gear Installation ... 43 6.6 Flying Shear Rack Installation ... 44 6.7 Steel Plate Shearing Machine Installation ... 44 6.8 Test Run of Shearing Machine ... 47 7 Installation Works of Coiling Machine and Uncoiling Machine ... 49 7.1 General Provisions ... 49 7.2 Installation of Cold-Rolled Strip Steel Coiling Machine and Uncoiling Machine ... 49 7.3 Installation of Cold-Rolled Dual-Drum Rotary Strip Steel Coiling Machine Installation ... 50 7.4 Hot-rolled Strip Steep Rolling Machine and Uncoiling Machine Installation ... 52 7.5 Test Rum of Coiling Machine and Uncoiling Machine ... 54 7.6 Auxiliary Equipment Installation of Coiling Machine and Uncoiling Machine ... 55 7.7 Test Run of Coiling Machine and Uncoiling Machine Auxiliary Equipment . 57 8 Track Installation Works ... 58 8.1 General Provisions ... 58 8.2 Installation of centralized drive roller table ... 58 8.3 Installation of Single Drive Roller Table ... 60 8.4 Installation of Lifting, Moving and Swing Roller Tables ... 61 8.5 Test Run of Roller Table ... 64 8.6 Special Roller Installation ... 65 8.7 Test Run of Special Roller ... 66 9 Cooling Bed Installation Works ... 68 9.1 General Provisions ... 68 9.2 Rotary Stepping Rack Cooling Bed ... 68 9.3 Test Run of Rotary Stepping Rack Cooling Bed ... 71 9.4 Installation of Chained and Rope Hauling Machi... ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB 50386-2016_English be delivered?Answer: Upon your order, we will start to translate GB 50386-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB 50386-2016_English with my colleagues?Answer: Yes. The purchased PDF of GB 50386-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version GB 50386-2016?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50386-2016 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |