Home   Cart   Quotation   Policy   About-Us
www.ChineseStandard.net
SEARCH

GB/T 24163-2025 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 24163-2025: Periodic inspection and evaluation of gas cylinders for stations
Status: Valid

GB/T 24163: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB/T 24163-2025439 Add to Cart 4 days Periodic inspection and evaluation of gas cylinders for stations Valid
GB 24163-2009319 Add to Cart 3 days [GB/T 24163-2009] Periodic inspection and evaluation of steel cylinder for the storage of compressed natural gas for stations Valid


Basic data

Standard ID: GB/T 24163-2025 (GB/T24163-2025)
Description (Translated English): Periodic inspection and evaluation of gas cylinders for stations
Sector / Industry: National Standard (Recommended)
Classification of Chinese Standard: J74
Classification of International Standard: 23.020.30
Word Count Estimation: 22,238
Date of Issue: 2025-08-29
Date of Implementation: 2026-03-01
Older Standard (superseded by this standard): GB/T 24163-2009
Issuing agency(ies): State Administration for Market Regulation, National Standardization Administration

GB/T 24163-2025: Periodic inspection and evaluation of gas cylinders for stations

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT24163-2025
ICS 23.020.30 CCSJ74 National Standard of the People's Republic of China Replaces GB/T 24163-2009 Periodic inspection and assessment of station gas cylinders Released on August 29, 2025 Implementation on March 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Basic Requirements 1 5 Inspection Preparation 3 6 Internal and external macroscopic inspection and evaluation 3 7 Fully automatic ultrasonic testing 4 8 Wall thickness measurement 5 9 Magnetic Particle Testing 5 10 Penetration Testing 5 11 Water pressure test 6 12 Acoustic Emission Testing 6 13 End plug inspection 7 14 Bottle valve inspection 7 15 Airtightness test 7 16 Post-inspection work 8 Appendix A (Informative) Inspection of the piping system, support device and safety device of the gas cylinder group for station use 9 Appendix B (Informative) Method for measuring the depth of depressions, pits, gouges and scratches 11 Appendix C (Informative) Periodic Inspection Report of Gas Cylinders (Groups) for Station Use 13 Reference 17 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 24163-2009 "Periodic inspection and evaluation of compressed natural gas cylinders for station use" and is consistent with GB/T 24163-2009. In addition to structural adjustments and editorial changes, the main technical changes are as follows. a) The scope has been changed (see Chapter 1, Chapter 1 of the.2009 edition); b) Added the term "station gas cylinder group" and its definition (see Chapter 3); c) Deleted the requirements for inspection bodies (see 3.1 of the.2009 edition); d) Inspection tools and devices are added (see 4.1); e) The requirements on inspection cycle, advance inspection, etc. have been changed (see 4.2, 3.2 of the.2009 edition); f) The inspection items have been changed (see 4.3, 3.3 of the.2009 edition); g) Added specific content of document review (see 5.1.1); h) Changed the requirements for handling media in gas cylinders (see 5.2, 4.2 of the.2009 edition); i) The requirements for disassembly of accessories such as cylinder valves and end plugs have been changed (see 5.3, 4.3 of the.2009 edition); j) The dent assessment has been modified (see 6.2.4, 5.2.1 of the.2009 edition); k) Added bulge inspection and assessment (see 6.5); l) Added fully automatic ultrasonic testing (see Chapter 7); m) The requirements for wall thickness determination have been changed (see Chapter 8, Chapter 6 of the.2009 edition); n) Deleted the "Acoustic Inspection and Assessment" (see Chapter 7 of the.2009 edition); o) Added magnetic particle testing (see Chapter 9); p) Penetration testing has been added (see Chapter 10); q) Determination of mass and volume (see Chapter 10 of the.2009 edition) has been deleted; r) The requirements for volumetric residual deformation rate of the hydrostatic test have been modified (see 11.2, 11.1.4 of the.2009 edition); s) Added acoustic emission testing (see Chapter 12); t) Added end plug inspection (see Chapter 13); u) Changed the requirements for cylinder valve inspection (see Chapter 14, Chapter 13 of the.2009 edition); v) The requirements for airtightness test have been changed (see Chapter 15, Chapter 14 of the.2009 edition); w) The content of post-inspection work has been changed (see Chapter 16, Chapter 15 of the.2009 edition); x) The method for determining the volume of water in cylinders has been deleted (see Appendix A of the.2009 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the National Technical Committee for Standardization of Gas Cylinders (SAC/TC31). This document was drafted by. China Special Equipment Testing and Research Institute, Dalian Boiler and Pressure Vessel Testing and Research Institute Co., Ltd., Jiaxing City Yangtze River Delta Hydrogen Safety Research Center, State Administration for Market Regulation, Beijing Tianhai Industrial Co., Ltd., Hebei Provincial Market Supervision Administration, Hebei Provincial Special Equipment Supervision and Inspection Institute, Shenyang Special Equipment Testing Institute, Shijiazhuang Enric Gas Machinery Co., Ltd., Zhejiang Blue Energy Hydrogen Energy Technology Co., Ltd. and Shanghai Institute of Materials Co., Ltd. The main drafters of this document are. Luo Hui, Zhong Yubao, Bo Ke, Wang Yanhui, Chang Yanyan, Wang Chenliang, Meng Qingyu, Liu Junxuan, Wang Zhongyuan, Sun Jiangang, Li Guanghai, Xu Zhongcheng, Xu Chang, Wang Hongxia, Chen Fan, Zhang Biao, Cao Wenhong, Han Wenchao, Jiang Jiansheng, and Zhang Yifeng. This document was first published in.2009 and this is the first revision. Periodic inspection and assessment of station gas cylinders

1 Scope

This document specifies the station-use gas storage steel seamless gas cylinders (hereinafter referred to as "gas cylinders") for containing natural gas, hydrogen, nitrogen, helium, air and other media for fixed use. Regular inspection and assessment of gas cylinders. This document is applicable to nominal working pressure of 10MPa~30MPa, nominal volume of 50L~3000L, and ambient temperature For gas cylinders with a temperature of -40℃~60℃. This document does not apply to bottle-type containers designed as stationary pressure vessels.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 8979 Pure nitrogen, high-purity nitrogen and ultra-pure nitrogen GB/T 9251 Gas cylinders hydrostatic test method GB/T 12137 Test method for gas cylinder airtightness GB/T 13005 Gas Cylinder Terminology GB/T 33145-2023 Large volume seamless steel gas cylinders NB/T 47013.3 Nondestructive testing of pressure equipment Part 3.Ultrasonic testing NB/T 47013.5 Nondestructive testing of pressure equipment Part 5.Penetrant testing NB/T 47013.8-2012 Nondestructive testing of pressure equipment Part 8.Leak detection NB/T 47013.9 Nondestructive testing of pressure equipment Part 9.Acoustic emission testing TSG23 Gas Cylinder Safety Technical Regulations

3 Terms and Definitions

The terms and definitions defined in GB/T 13005 and the following apply to this document. 3.1 A gas storage device consisting of a station gas cylinder installed on a supporting device. Note. Including station gas cylinders, piping systems, support devices, safety devices, etc.

4 Basic Requirements

4.1 Inspection tools and equipment The inspection agency should have at least the following tools and equipment. a) Explosion-proof lamp. used to inspect the internal and external surfaces of gas cylinders and accessories. The voltage and explosion-proof level should comply with relevant safety standards; b) Endoscope. used to inspect the inner surface of the gas cylinder (including the inner surface of the neck), should be high-definition color and have a storage function;
......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 24163-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 24163-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 24163-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 24163-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 24163-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 24163-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.