Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB 19510.4-2009 English PDF

US$534.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 19510.4-2009: Lamp controlgear -- Part 4: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps
Status: Valid

GB 19510.4: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
GB 19510.4-2009534 Add to Cart 4 days Lamp controlgear -- Part 4: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps Valid
GB 19510.4-2005679 Add to Cart 3 days Lamp controlgear -- Part 4: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps Obsolete

Similar standards

GB/T 9473   GB/T 24825   GB/T 32483.2   GB/T 19510.1   GB 19510.1   GB 19510.2   

Basic data

Standard ID: GB 19510.4-2009 (GB19510.4-2009)
Description (Translated English): Lamp controlgear -- Part 4: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps
Sector / Industry: National Standard
Classification of Chinese Standard: K74
Classification of International Standard: 29.140.99
Word Count Estimation: 27,210
Date of Issue: 2009-10-15
Date of Implementation: 2010-12-01
Older Standard (superseded by this standard): GB 19510.4-2005
Adopted Standard: IEC 61347-2-3-2000, IDT
Regulation (derived from): Announcement of Newly Approved National Standards No. 11 of 2009 (No. 151 overall)
Issuing agency(ies): General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary: This Chinese standard provides for the IEC 60081 and IEC 60901 as well as other high- quite the fluorescent electronic ballasts for fluorescent lamps use special requirements, such electronic ballasts using 50 Hz or 60 Hz, 1 000 V AC travel less, but its Operating frequency is different from the frequency of the supply. Overheating protection with the special requirements of electronic ballasts is given in Appendix C. Emergency lighting AC/DC electronic ballasts special requirements are given in Appendix J. Performance requirements in GB/T 15144 are given.

GB 19510.4-2009: Lamp controlgear -- Part 4: Particular requirements for a.c. supplied electronic ballasts for fluorescent lamps


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Lamp controlgear.Part 4. Particular requirements for acsupplied electronic ballasts for fluorescent lamps ICS 29.140.99 K74 National Standards of People's Republic of China GB 19510.4-2009/IEC 61347-2-3.2000 Replacing GB 19510.4-2005 Part 4 of the control device lamp. fluorescent lamps Particular requirements for ac supplied electronic ballasts (IEC 61347-2-3.2000, IDT) Posted 2009-10-15 2010-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 2 General requirements 5 Test Description 2 6 Category 2 7 Flag 2 8 accidental contact with live parts of the measures to prevent 2 9 Terminal 2 10 protection grounding device 3 11 Moisture resistance and insulation 3 12 Dielectric strength 3 Heat winding 13 Test 3 14 Fault Status 3 15 protective measures associated member 3 16 abnormal state 3 End-of-life status 17 lamp ballast 8 18 Structure 13 19 creepage distances and clearances 13 20 Screws, current-carrying parts and connections 13 21 heat, fire and resistance to tracking 13 Corrosion-resistant 22 13 Appendix A (normative) to determine whether the conductive member is likely to cause an electric shock test live part 14 Particular requirements 14 Annex B (normative) control device for thermally protected lamp Annex C (normative) Particular requirements for the control device 14 of the lamp with thermal protector Annex D (normative) heating test control apparatus for thermally protected lamp of claim 14 Annex F (normative) anti-convection air chamber 14 Derivation of Annex G (normative) values of pulse voltages 14 Annex H (normative) Test 15 Annex I (normative) Methods of measurement of high-frequency leakage current 15 Appendix J (normative) Special supplementary safety emergency lighting AC/DC electronic ballast of claim 16 Annex K (informative) asymmetric pulse test circuit section (FIG. 3) used 19 Annex L (normative) ballast design information 20 References 21 GB 19510.4-2009/IEC 61347-2-3.2000

Foreword

All technical content in this section is mandatory. GB 19510 "Lamp control" is divided into 14 parts. --- Part 1. General requirements and safety requirements; --- Part 2. starting devices (other than glow starters) - Particular requirements; --- Part 3. Tungsten with AC/DC buck converter electronic Particular requirements; --- Part 4. Particular requirements for the exchange of electronic fluorescent ballasts; --- Part 5. Particular requirements for dc supplied electronic ballasts for general lighting of; --- Part 6. Public transport lighting Particular requirements for dc electronic ballasts; --- Part 7. DC electronic ballasts for aircraft lighting Particular requirements; --- Part 8. DC electronic ballasts for emergency lighting Particular requirements; --- Part 9. Particular requirements for ballasts for fluorescent lamps; --- Part 10. discharge lamps (excluding fluorescent lamps) with the special requirements of the ballast; --- Part 11. high frequency cold start tubular discharge lamps (neon) Specific requirements for electronic exchange and the frequency converter; --- Part 12. Particular requirements for lighting and miscellaneous electronic circuits associated with; --- Part 13. discharge lamps (excluding fluorescent lamps) or AC supplied electronic ballasts for special requirements; Part --- Article 14. LED module with special requirements for dc or ac electronic control device. This is Part 4 GB 19510's. This section should be used with GB 19510.1-2009, it is appropriate in terms of GB 19510.1-2009 supplement or repair Formulated from the following changes. This section identical with IEC 61347-2-3.2000 "Part 2-3 Lamp control. electronic ballasts for fluorescent lamps special Special requirements "and its 2004 revision Revision 1 and 2006 2 (in English). This section is equivalent translation IEC 61347-2-3.2000, revised in 2004 1 (in English), revised in 2006, 2 (in English). For ease of use, this section made the following editorial changes. a) "this International Standard" be replaced by "this section"; b) use a decimal point instead of a decimal point ",". ","; c) Remove IEC 61347-2-3.2000 Foreword; d) For other international standards referenced it has been adopted as the equivalent of a standard, this part of the country with reference to these national standards Or industry standards instead of the corresponding international standards, and the rest not tantamount to the adoption of a standard for the international standards in this section are It is a direct reference (see Part 2 of this chapter). This Part replaces GB 19510.4-2005 "Part 4 of the control device of the lamp. fluorescent lamps electronic ballasts to special begging". This section compared with GB 19510.4-2005 main differences are as follows. a) increasing the state at the end of Chapter 17 of the ballast lamp life, and Chapter 17 ~ Chapter 21 to Chapter 18 ~ No. Chapter 22; Added. 3 asymmetric pulse test circuit of FIG. Figure 4 asymmetric power measurement circuit

5 Disconnect the filament test circuit

b) Increase in Table K. 1 material specifications and Table K. 2 transformer specifications; GB 19510.4-2009/IEC 61347-2-3.2000 c) "Chapter 15 - Chapter 21," in Chapter 5 of the words "Chapter 15 ~ Chapter 22"; d) In Chapter 16 In defined as. the rated lamp current; e) Title to the Figure 2. High-frequency fluorescent capacitive leakage current limit, and Figure 2 is an exploded diagram 2a), Fig. 2b), Figure 2c); f) 3.1 The electronic ballast exchange in the definition of "fluorescent tubes" to "fluorescent"; g) delete the definition of 3.2, 3.3 and 3.4 and the definition is changed to 3.2 and 3.3, respectively; h) delete the definition of 3.6 and 3.7, and the definition is changed to 3.4, 3.5 and 3.9 3.5,3.8 and 3.6, respectively; i) the definition of the new 3.5 will be "fluorescent tubes" to "fluorescent"; j) in Appendix H of the description to read "in accordance with Appendix H of GB 19510.1-2009 requirements"; k) increase in Appendix L; l) References to add GB 18774 Safety requirements for double-ended fluorescent lamps. This section of the Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G, Appendix H, Appendix I, Appendix J and Appendix L Normative appendix, Appendix K is informative appendix. This part is proposed by the China National Light Industry Council. This part of the National Electric lighting Standardization Technical Committee (SAC/TC224) centralized. This part mainly drafted by. National Electric Light Source Quality Supervision and Inspection Center (Shanghai), Zhejiang Sunshine Group Co., Ltd., Zhejiang morning Hui Lighting Co., Ltd., Guangzhou, China and Germany Electronic Co., Ltd., Foshan City, China Electrical Lighting Co., Zhongshan Op lighting company limited by shares The company, Zhongshan City, Liang Di Lighting Co., Ltd., Zhongshan City, were sent Lighting Appliance Co., Ltd. Zhongshan lighting products, energy 霍尼韦尔朗 Electrical Systems Technology (Guangdong) Co., Ltd. The main drafters of this section. Wangyue Li, Yuan Qi, Wu Guoming, Lu Guangming, Malaysians, Yang Chi District, Zhou Mingxing, Xu made stone, Cheng Jingyuan, Jiang Zhiqiang, Fu Baocheng, Cooper rights, Li Peihui, Huaqiao Sheng, Levi liters. This part of the standard replaces the previous editions are. --- GB 15143-1994; --- GB 19510.4-2005. GB 19510.4-2009/IEC 61347-2-3.2000

Introduction

This section and the various parts constituting the GB 19510.2 ~ GB 19510.14 regulation when referring to GB 19510.1-2009 any provision of Set the terms and scope of the implementation of the order of the trial, but also provides the necessary additional requirements. GB 19510.2 ~ GB 19510.14 Each part is separate, and do not refer to each other. If this section by "a section in accordance with GB 19510.1-2009 requires," this sentence to refer to the GB 19510.1-2009 A provision requirements, the meaning of this statement is in accordance with all the requirements of this provision, but obviously does not apply to GB 19510.2 ~ Except for the contents of the control device GB 19510.14 specific type of lamp. GB 19510.4-2009/IEC 61347-2-3.2000 Part 4 of the control device lamp. fluorescent lamps Particular requirements for ac supplied electronic ballasts

1 Scope

This section provides for the IEC 60081 and IEC 60901 fluorescent lamp and electronic ballast fluorescent lamps use other high-frequency characteristics Specific requirements, such electronic ballast use 50Hz or 60Hz, 1000V ac power, but its operating frequency different from the power supply frequency. Particular requirements for electronic ballasts with thermal protector is given in Appendix C. Particular requirements for emergency lighting AC/DC electronic ballasts are given in Appendix J. Performance requirements are given in GB/T 15144 in.

2 Normative references

The following documents contain provisions which, through reference in this Part of GB 19510, constitute provisions of this part. For dated reference documents Member, all subsequent amendments (not including errata content) or revisions do not apply to this section, however, encouraged to reach under this section Parties to research agreement to use the latest versions of these documents. For undated reference documents, the latest versions apply to this section. This part of GB 19510.1-2009 Chapter 2 of the normative references and normative references the following documents. Part 1 GB 19510.1-2009 lamp control apparatus. General and safety requirements (IEC 61347-1.2000, IDT) Section 8 of the light control device GB 19510.8-2009. DC electronic ballasts for emergency lighting Particular requirements (IEC 61347-2-7.2006, IDT) GB 7000.2 Luminaires - Part 2-22. Particular requirements for emergency lighting (GB 7000.2-2008, IEC 60598-2-22. 2002, IDT)

3 Terms and Definitions

GB 19510.1-2009 established as well as the following terms and definitions apply to this section. 3.1 By the grid power supply and includes a stable exchange device - AC inverter, which typically starts and one or a few pieces at a high frequency Fluorescent work. 3.2 In line with GB/T 15144-2009 8.1 predetermined lamp power (light output), except when related to the manufacturer or seller otherwise stated. 3.3 In the open state, as well as any normal operation and abnormal operating conditions allow the jumper on either the maximum allowable peak on an insulator Voltage. The maximum peak voltage and the nominal operating voltage (rms) related to Table 1. 3.4 By the manufacturer or vendor-related claims, and in the 3.3 defined minimum percentage of lamp power. 3.5 By the grid or battery power and includes a stable devices AC/DC - AC inverter, it is generally in the high emergency lighting GB 19510.4-2009/IEC 61347-2-3.2000 Frequencies and starting a fluorescent lamp or a few pieces of work. 3.6 Cathode replaced by IEC 60081 and IEC 60901 in the corresponding table lamp parameter specified by the manufacturer or the seller or a related statement resistance.

4 General requirements

In accordance with the requirements of GB 19510.1-2009 Chapter 4, with the following additional requirements. Emergency lighting AC/DC electronic ballasts should be in accordance with Appendix J requirements.

5 Test Description

In accordance with the requirements of GB 19510.1-2009 Chapter 5 as well as the following additional requirements. Number of samples The following number of samples shall be submitted to the test. a) For Chapter 6 - Chapter 12 and Chapter 15 ~ Chapter 22 requirements of the test, submit a sample; b) to Chapter 14 of the test requirements, submit a sample (if necessary in consultation with the manufacturer to request additional samples). Test emergency lighting test the special requirements of the AC/DC electronic ballasts, under the conditions specified in Appendix J performed. Category 6 In accordance with Chapter 6 GB 19510.1-2009 requirements.

7 logo

As a lamp ballast components do not have to make signs. 7.1 Mandatory Signs Ballast (not including integral ballasts) shall be in accordance with the requirements of GB 19510.1-2009 7.2, clear durably marked with the following strong System signs. a) a GB 19510.1-2009 required 7.1), b), c), d), e), l) and k) of the content; and, b) The applicable ground symbol; c) For controllable ballasts, the control terminals shall be identified; d) between the output terminals and applicable to any output terminal and the ground in accordance with the requirements of Chapter 12 of the maximum operating voltage (effective Value) statement. When the operating voltage is less than or equal to 500V, 10V should be made as a symbol; if the operating voltage is greater than 500V, should be 50V to make a mark, to make maximum operating voltage of the reference mark either case, the output maximum operating voltage between terminals and Any output Maximum operating voltage terminal and ground. And only the two voltage values higher flagged. It shall be U-OUT =... V... 7.2 Supplementary flag In addition to these mandatory signs, if necessary, the following shall apply content mark on the ballast, or marked on the manufacturer's product catalog Or similar specification. --- GB 19510.1-2009 in 7.1 h), i) and j) content.

8 measures to prevent accidental contact with live parts

GB 19510.1-2009 accordance with the requirements of Chapter 10.

9 Terminals

GB 19510.1-2009 accordance with Chapter 8 requirements. GB 19510.4-2009/IEC 61347-2-3.2000 10 protection grounding device In accordance with the requirements of GB 19510.1-2009 Chapter 9. 11 Moisture resistance and insulation GB 19510.1-2009 accordance with Chapter 11 and the following additional requirements. Fluorescent contacted at high frequency operation with electronic ballast exchange may cause leakage current at this time should be measured in accordance with Annex I The amount of the leakage current. The measured value shall not exceed the values shown in Figure 2, and the measurement value is a valid value. Leakage current limit frequency of each frequency point shown in FIG. 2 according to the equation in the figure (still under consideration) is calculated. NOTE. The above 50kHz frequency leakage current limit is still under consideration. 12 Dielectric strength In accordance with the requirements of GB 19510.1-2009 Chapter 12. Heat test 13 windings GB 19510.1-2009 not in accordance with the requirements of Chapter 13. 14 Fault Status GB 19510.1-2009 accordance with the requirements of Chapter 14. 15 protective measures associated member 15.1 In the access via analog cathode resistor verified normal operating conditions and under abnormal operating conditions specified in Chapter 16, the output terminal The voltage at any time should not exceed the maximum allowable peak specified in Table 1. Table 1 Relationship between operating voltage (RMS) and the maximum peak voltage Voltage at the output/V Working voltage (rms) maximum allowable peak voltage Note. Allow the specified voltage interval between the implementation of straight-line interpolation. 15.2 Under normal operating conditions specified in Chapter 16 and under abnormal operating conditions (except rectifying effect), in power or started After 5s, voltage at the output should not exceed the maximum operating voltage of the ballast declared. 15.3 under abnormal operating state rectifying effect, namely Chapter 16 d) under the ballast in power or started after the 30s, Voltage at the output (RMS) should not exceed the required ballast design maximum allowable value. For the duration of a failed attempt to start multiple lamp ballast, ballast marked maximum operating voltage than the total voltage Inter should not exceed 30s. 15.1,15.2 and 15.4 to 15.3 of the test, the measured output voltage should be either a voltage output terminal and ground. this In addition, in the case when the voltage is present between the associated part of the insulating spacers should measure the voltage between the output terminals. 15.5 For controllable electronic ballasts, the input control terminal should use at least basic insulation and power lines isolated. NOTE. This requirement does not apply to the introduction of ballast control signal through the power supply terminal, it does not apply to be carried out by infrared or radio transmitters and remote transmitter The control signal is completely isolated from ballast and ballast. If you use a safety extra-low voltage, it should use double or reinforced insulation. 16 abnormal state When the ballast is operating in an abnormal state rated supply voltage any voltage value between 90% and 110% under, should not be subject to security Damage to the phenomenon. GB 19510.4-2009/IEC 61347-2-3.2000 Compliance is checked by the following test. In accordance with the ballast manufacturer's instructions (if specified, including fins) during work, applying the following various abnormal state, and each Lasted 1h. a) a lamp or lamps a few pieces not access; b) a cathode lamp because damage can not start; c) While the cathode line intact, but the lamp does not start (deactivation of lights); d) operation of the lamp, but the cathode electrode is damaged, or deactivated (rectifying effect); e) if the starter switch, short-circuit. For analog deactivated state lamp operation test, using a resistor connected in place of each lamp cathode method. The resistance barrier Value by the IEC 60081 and IEC 60901 in the corresponding parameter table lamp in the light of nominal operating current values are substituted into the formula (1) inferred. R = 11.02.1 × InΩ (1) Where. In --- rated lamp current. For the IEC 60081 and IEC 60901 are not related to the lamp, the current value of the work should be used by the manufacturer of the lamp given. Rectifying effect test electronic ballasts, using circuit shown in Figure 1. The lamp connected to an intermediate point of a suitable equivalent resistance. Choose whole The polarity of the flow tube, in order to provide the most adverse working conditions. If necessary, use a suitable starter to start the lamp. At the end of making a) ~ e) during the test and the test, the ballast should not compromise the safety of the fault, nor any smoke generation. Rectifier characteristics are as follows. Peak reverse voltage URRM≥3000V Reverse leakage current IR≤10μA Forward Current IF≥ lamp three times the nominal operating current (Maximum frequency. 150kHz) (measurement conditions. IF = 0.5A, and IR = 1A to IR = 0.25A) a) Test circuit NOTE. It is recommended to use the following types of diodes (three diodes in series) as a suitable rectifier. RGP30M, BYM96E, BYV16. b) a diode recovery time Figure 1 rectifying effect test GB 19510.4-2009/IEC 61347-2-3.2000 a) the range of 10ms ~ 100ms Figure 2 high-frequency fluorescent capacitive leakage current limits GB 19510.4-2009/IEC 61347-2-3.2000 b) the range of 100ms ~ 1000ms Figure 2 (cont.) GB 19510.4-2009/IEC 61347-2-3.2000 c) the scope of 1000ms ~ 10000ms Figure 2 (cont.) GB 19510.4-2009/IEC 61347-2-3.2......
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 19510.4-2009_English be delivered?

Answer: Upon your order, we will start to translate GB 19510.4-2009_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 19510.4-2009_English with my colleagues?

Answer: Yes. The purchased PDF of GB 19510.4-2009_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB 19510.4-2009?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 19510.4-2009 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.