GB 50261-2017: Code for installation and commissioning of sprinkler systems
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB 50261: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
GB 50261-2017English245 Add to Cart 0-9 seconds. Auto-delivery Code for installation and commissioning of sprinkler systems Valid
GB 50261-2005EnglishRFQ ASK 10 days Code for installation and commissioning of sprinkler systems Obsolete
GB 50261-1996EnglishRFQ ASK 11 days Code for installation and commissioning of automatic fire-extinguishing sprinkler systems Obsolete

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: GB 50261-2017
      

Similar standards

GB 50222   GB 50116   GB 50281   GB 55037   

GB 50261-2017: Code for installation and commissioning of sprinkler systems

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50261-2017
NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC Code for installation and commissioning of sprinkler systems Issued on. MAY 27, 2017 Implemented on. JANUARY 01, 2018 Issued by. Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China.

Table of Contents

Foreword... 6 1 General provisions... 8 2 Terminologies... 9 3 Basic requirements... 10 4 Installation and construction of water supply facilities... 16 5 Installation of pipeline network and system components... 23 6 System pressure testing and flush washing... 50 7 System commissioning... 55 8 System acceptance... 59 9 Maintenance... 66 Appendix A -- Classification for subprojects and subunits of sprinkler systems ... 70 Appendix B -- Construction site quality management inspection records... 71 Appendix C -- Quality inspection records for sprinkler systems installation processes... 72 Appendix D -- Inspection records for quality control documentation of sprinkler systems... 76 Appendix E -- Records of acceptance for sprinkler system projects... 78 Appendix F -- Classifications for deficiencies in sprinkler system acceptance ... 81 Appendix G -- Inspection items for maintenance and supervision of sprinkler systems... 82 Explanation of wording in this Code... 83 List of quoted standards... 84

1 General provisions

1.0.1 This Code is formulated with view to ensuring the construction quality and use function of sprinkler system (hereinafter referred to as system), reducing fire hazard and protecting personal and property safety. 1.0.2 This Code is applicable to the construction, acceptance, maintenance and management of sprinkler system arranged in industrial and civil buildings. 1.0.3 The construction, acceptance, maintenance and management of sprinkler system shall not only meet those specified in this Code, shall also comply with the requirements of relevant national current standards and codes.

2 Terminologies

2.0.1 condition of standing by The state with the performance and service condition of sprinkler system complying with relevant technical requirements and enabling immediate action and sprinkling in case of fire. 2.0.2 system components A general term for special products such as sprinkler, alarm valve set, pressure switch, water flow indicator, fire pump and pressure maintenance device. 2.0.3 equipment for supervisory and alarm control services The equipment supervising the pressure, water level, water flow and valve opening/closing state of sprinkler system and capable of sending out control signal and alarm signal. 2.0.4 pressure maintenance pumps A kind of special pump maintaining the pressure of sprinkler system under the condition of standing by within the range of design working pressure.

3 Basic requirements

3.1 Quality management 3.1.1 The subproject and subunit of sprinkler system shall be classified according to Appendix A. 3.1.2 Construction scheme for system construction shall be prepared according to the design requirements. Necessary technical standard for construction, sound construction quality management system and work quality inspection system shall be provided on construction site, and relevant records shall be filled in according to the requirements of Appendix B. 3.1.3 The following conditions shall be provided prior to sprinkler system construction. 3.1.6 The quality control data of sprinkler system shall be filled in according to the requirements of Appendix D. 3.1.7 Prior to sprinkler system construction, site inspection shall be carried out for system components, pipe fittings and other equipment and materials, and those rejected shall not be used. 3.2 Material and equipment management 3.2.1 Prior to sprinkler system construction, site inspection shall be carried out for the adopted system components, pipe fittings and other equipment and materials, and the following requirements shall be met. 3.2.9 Automatic monitoring devices such as pressure switch, flow detector, automatic exhaust valve, reducing valve, relief valve, multi-function pump control valve, check valve, signal valve, pump adapter as well as water level,

4 Installation and construction of water supply facilities

4.1 General requirements 4.1.1 As for installation of such water supply facilities as fire pump, fire tank, fire reservoir, pressure fire water supply equipment and fire department connection as well as their auxiliary pipelines, the dirt and sundries inside shall be cleaned. In case that the installation is interrupted, the opening shall be sealed. 4.2 Installation of fire pump Dominant item 4.2.1 The specification and type of fire pump shall meet the design requirements and shall be provided with product qualification certificate and installation and operation instruction. 4.2.2 Installation of fire pump shall meet the requirements of the current national standards GB 50231 General Code for Construction and Acceptance of Mechanical Equipment Installation Engineering and GB 50275 Code for Construction and Acceptance of Computer, Fan and Pump Installation Engineering. 4.2.5 For the outlet pipe of water pump, instrument used for testing water supply pressure and flow rate as well as system flow rate and pressure detection device composed of drainage pipelines shall be installed or interface with flow rate and pressure detection device shall be reserved; the water-passing capacity of interface shall be consistent with the water supply capability of system. 4.3 Installation of fire tank and construction of fire reservoir I Dominant item 4.3.1 Construction and installation of fire reservoir and fire tank shall meet the requirements of the current national standards GB 50141 Code for Construction and Acceptance of Water and Sewerage Structures and GB 50242 Code for Acceptance of Construction Quality of Water Supply Drainage and Heating Works. Arrangement mode and position of water level display device of fire reservoir and elevated fire tank shall meet the requirements of the design document. Inspection method. observing and inspecting with ruler. 4.5.3 Underground fire department connection shall be installed with the distance from water inlet to shaft cover not greater than 0.4 m and not less than the radius of shaft cover. 4.5.4 Water-proof and drainage measures shall be taken for the masonry of underground fire department connection shaft.

5 Installation of pipeline network and system components

5.1 Installation of pipeline network I Dominant item 5.1.1 Where steel pipes are adopted for pipeline network, the material shall meet the requirements of the current national standards GB/T 8163 Seamless Steel Tubes for Liquid Service and GB/T 3091 Welded Steel Pipes for Low Pressure Liquid Delivery. 5.1.4 Where coating steel pipes are adopted for pipeline network, the material shall meet the requirements of the current national standard GB 5135.20 Automatic Sprinkler System - Part 20.Coating Steel Pipe. 5.1.5 Where chlorinated polyvinyl chloride (PVC-C) pipelines are adopted for pipeline network, the material shall meet the requirements of the current national standard GB 5135.19 Automatic Sprinkler System - Part 19.Plastic 5.1.6 After pipeline connection, the discharge section area shall not be reduced. As for installation of hot-dip galvanized steel pipe and coating steel pipe, threaded and grooved pipe fitting or flange shall be adopted for connection. 5.1.7 As for installation of thin-walled stainless steel pipe, GTHY, clip bulgy, entrapment, groove or flange shall be adopted for connection. 5.1.17 In case of transverse installation, pipeline should be arranged at a gradient of 2 ‰ ~ 5 ‰ and shall slope toward the drainage pipe; where it is difficult to empty water with drainage pipe in partial areas, corresponding drainage measures shall be taken. Where the quantity of sprinklers is less than or equal to 5, plugs may be added at indentation of pipeline; where it is greater than 5, drainage pipe with valve should be installed. 5.1.20 Installation of coating steel pipe shall meet the following relevant requirements. 5.4.8 Installation of throttle pipe and pressure-reducing orifice plate shall meet the design requirements.

6 System pressure testing and flush washing

6.1 General requirements 6.1.1 After the pipeline network is installed, it shall be subject to strength testing, tightness testing and flush washing. Inspection quantity. 100 % inspection. Inspection method. inspecting records on strength testing, tightness testing and flush washing. 6.2 Water pressure testing I Dominant item 6.2.1 Where the design working pressure of the system is less than or equal to 1.0 MPa, the pressure of water pressure strength testing shall be 1.5 times of the design working pressure and shall not be less than 1.4 MPa; where the design working pressure is greater than 1.0 MPa, the pressure of water pressure strength testing shall be the design working pressure plus 0.4 MPa. 6.2.4 During water pressure testing, the ambient temperature should not be lower than 5 °C; where it is lower than 5 °C, anti-freezing measures shall be

7 System commissioning

7.1 General requirements 7.1.1 System commissioning shall be carried out after completion of the system construction. 7.2.6 During commissioning, water discharged from the system shall be completely drained away through drainage facilities. 7.2.7 Linkage testing shall meet the following requirements and shall be recorded in accordance with the requirements of Table C.0.4 in Appendix C.

8 System acceptance

8.0.1 Project acceptance must be carried out upon system completion; if the acceptance is rejected, the system shall not be put into service. 8.0.3 During system acceptance, the construction organization shall provide the following information. 8.0.4 The inspection and acceptance of system water supply shall meet the following requirements. 8.0.13 The acceptance and judgment of system project quality shall meet the following requirements.

9 Maintenance

9.0.1 Sprinkler system shall be provided with management, detection and maintenance specification, and shall ensure that the system is maintained at condition of standing by. Maintenance work shall be carried out according to those specified in Appendix G. 9.0.5 Solenoid valve shall be inspected and subject to starting testing monthly, when its operation is abnormal, it shall be replaced timely. 9.0.6 Drainage testing shall be carried out for all terminal water test valves and water release test valve beside alarm valve of the system quarterly to inspect whether the start, alarm function and water outflow condition of the system are normal. See Table 9.0.6 for the inspection contents. 9.0.8 The control valve of the inlet pipes in outdoor valve well shall be inspected quarterly to make sure that it is at full open state. 9.0.9 When failure occurs to the sprinkler systems and it is necessary to cut off the water supply for repair, it is required to report to competent watchkeeper and get permission from the maintenance principal who will supervise on site, and the construction cannot be started before precaution measures are taken. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of GB 50261-2017 be delivered?

Answer: The full copy PDF of English version of GB 50261-2017 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50261-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB 50261-2017_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- GB 50261-2017 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB 50261-2017?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 50261-2017 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB 50261-2017?

A step-by-step guide to download PDF of GB 50261-2017_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50261-2017".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9