GB/T 754-2024 PDF EnglishUS$230.00 · In stock · Download in 9 seconds
GB/T 754-2024: Parameter series of steam turbines for power plant Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure Status: Valid GB/T 754: Historical versions
Similar standardsGB/T 754-2024: Parameter series of steam turbines for power plant---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT754-2024GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.040 CCS K 54 Replacing GB/T 754-2007 Parameter series of steam turbines for power plant ISSUED ON: APRIL 25, 2024 IMPLEMENTED ON: NOVEMBER 01, 2024 Issued by: State Administration for Market Regulation; Standardization Administration of the People's Republic of China. Table of ContentsForeword ... 3 1 Scope ... 5 2 Normative references ... 5 3 Terms and definitions ... 5 4 Initial steam parameter series ... 6 4.1 Overview ... 6 4.2 Non-reheat steam turbine ... 6 4.3 Reheat steam turbine ... 7 5 Allowable fluctuation range of steam inlet parameters of steam turbine during operation ... 9 Annex A (informative) Heating pressure series and adjustable range of cogeneration steam turbine ... 10ForewordThis document was drafted in accordance with the rules given in GB/T 1.1-2020 "Directives for standardization - Part 1: Rules for the structure and drafting of standardizing documents". This document replaces GB/T 754-2007 "Parameter series of steam turbines for power plant". Compared with GB/T 754-2007, in addition to structural adjustments and editorial changes, the main technical changes in this document are as follows: a) The maximum initial steam pressure range is changed from 31 MPa to 35 MPa. The maximum rated power level is changed from 1000 MW to 1 350 MW (see Chapter 1 of this Edition; Chapter 1 of Edition 2007); b) The terms "initial steam parameter" and "supercritical parameter" and their definitions have been added (see 3.1 and 3.7 of this Edition). The definitions of "initial steam pressure", "initial steam temperature", " initial steam flow rate", "reheat temperature" and "heating pressure" have been changed (see 3.2~3.6 of this Edition; 2.1~2.5 of Edition 2007); c) Various initial steam parameters have been added (see Table 1 ~ Table 3 of this Edition). The recommended range of initial steam flow rate has been deleted (see Table 1 ~ Table 3 of Edition 2007); d) The initial steam parameters and reheat temperature series have been changed (see Table 2 and Table 3 of this Edition; Table 2 and Table 3 of Edition 2007); e) The provisions for the allowable fluctuation range of steam inlet parameters of turbines during operation have been changed (see Chapter 5 of this Edition; Chapter 4 of Edition 2007). Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. The issuing authority shall not be held responsible for identifying any or all such patent rights. This document was proposed by China Electrical Equipment Industry Association. This document shall be under the jurisdiction of National Technical Committee on Steam Turbine of Standardization Administration of China (SAC/TC 172). The drafting organizations of this document: Shanghai Electric Power Plant Equipment Co., Ltd. Shanghai Steam Turbine Plant, Shanghai Power Generation Equipment Complete Design Institute Co., Ltd., Beijing Beizhong Steam Turbine and Electric Machine Co., Ltd., Hangzhou Steam Turbine Power Group Co., Ltd., Dongfang Electric Group Dongfang Steam Turbine Co., Ltd., Harbin Steam Turbine Plant Co., Ltd., Parameter series of steam turbines for power plant1 ScopeThis document gives initial steam parameter series of steam turbines for power plant and the allowable fluctuation range of steam inlet parameters during operation. This document is applicable to steam turbines for stationary power generation or cogeneration with rated power levels of 0.75 MW~1350 MW and initial steam pressures of 1.28 MPa~35 MPa. NOTE: Steam turbines for stationary power plant are of the condensing type. Steam turbines for cogeneration are of the back-pressure type, extraction back-pressure type, and extraction condensing type. This document does not apply to nuclear power turbines, steam-gas combined cycle turbines, solar thermal power generation turbines, waste power generation and biomass power generation turbines, and waste heat power generation turbines.2 Normative referencesThe following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB/T 5578, Fixed power plant steam turbine specifications3 Terms and definitionsFor the purposes of this document, the terms and definitions defined in GB/T 5578 as well as the followings apply. 3.1 initial steam parameter Steam parameters at the main steam valve inlet. 3.2 initial steam pressure Steam pressure at the inlet of the main steam valve of the turbine. NOTE: All steam pressure values in this document unless otherwise specified are absolute pressures. 3.3 initial steam temperature The steam temperature at the inlet of the turbine main steam valve. 3.4 initial steam flow rate The mass flow rate of new steam flowing into the main steam valve inlet of the turbine. 3.5 reheat temperature The reheat steam temperature at the inlet of the reheat main steam valve (or reheat main steam and regulating combined valve) of the reheat steam turbine. 3.6 heating pressure The heating steam pressure at the exhaust port of a back-pressure steam turbine, the extraction port of an extraction steam turbine, or the outlet of the pressure regulating valve installed on the heating extraction pipe. NOTE: The heating pressure series and adjustable range of the cogeneration steam turbine are shown in Annex A. 3.7 supercritical parameter Steam parameters are turbine inlet steam parameters with pressure and temperature higher than the critical point of water. 3.8 ultra-supercritical parameter Steam turbine inlet parameters of which the steam parameters are higher than conventional supercritical parameters 24.2 MPa/566℃/566℃. Their initial steam temperature and/or reheat temperature is greater than or equal to 580°C, and/or initial steam pressure is greater than or equal to 28 MPa.4 Initial steam parameter series4.1 Overview The initial steam pressure, temperature and initial steam flow rate corresponding to the typical power level can be selected according to the recommended data listed in Tables 1~3. NOTE: The initial steam flow rate of steam turbines with rated power of 250 MW and below listed in Tables 1~3 is calculated based on the configuration of electric feedwater pumps. 4.2 Non-reheat steam turbine The initial steam parameter series of non-reheat steam turbine is shown in Table 1. ......Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of English version of GB/T 754-2024 be delivered?Answer: The full copy PDF of English version of GB/T 754-2024 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.Question 2: Can I share the purchased PDF of GB/T 754-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 754-2024_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 754-2024 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.Question 5: Should I purchase the latest version GB/T 754-2024?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 754-2024 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.How to buy and download a true PDF of English version of GB/T 754-2024?A step-by-step guide to download PDF of GB/T 754-2024_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).Step 2: Search keyword "GB/T 754-2024". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9 |