Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 6679-2003 PDF English

US$460.00 · In stock · Download in 9 seconds
GB/T 6679-2003: General rules for sampling solid chemical products
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid

GB/T 6679: Historical versions

Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 6679-2003460 Add to Cart Auto, 9 seconds. General rules for sampling solid chemical products Valid
GB/T 6679-1986679 Add to Cart 5 days General rules for sampling of solid chemical products Obsolete

Similar standards

GB/T 4472   GB/T 6283   GB/T 6678   GB/T 9008   

GB/T 6679-2003: General rules for sampling solid chemical products

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT6679-2003
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 71.100.01 G 04 Replacing GB/T 6679-1986 General rules for sampling solid chemical products Issued on. OCTOBER 11, 2003 Implemented on. MAY 01, 2004 Issued by. General Administration of Quality Supervision, Inspection and Quarantine of the People’s Republic of China.

Table of Contents

Foreword... 3 1 Scope... 4 2 Normative references... 4 3 General... 4 4 Sampling techniques... 6 5 Sample preparation... 9 6 Sampling report... 11 Appendix A (Informative) Sampling probe... 12 Appendix B (Informative) Sampling drill... 15 Appendix C (Informative) Pneumatic and vacuum probes... 16 Appendix D (Informative) Sample divider... 19 Appendix E (Informative) Automatic sampler... 23

Foreword

There is no difference in technical content between this standard and the previous version. The content is editorially modified in accordance with GB/T 1.1-2000. This standard replaces GB/T 6679-1986 General rules for sampling of solid chemical products from the date of implementation. Appendix A, Appendix B, Appendix C, Appendix D and Appendix E of this standard are informative appendices. This standard is proposed by China Petroleum and Chemical Industry Federation. This standard shall be under the jurisdiction of National Standardization Technical Committee of Chemical (SAC/TC 63). This standard shall be under the interpretation of National Standardization Technical Committee of Chemical. Organization responsible for the drafting of this standard. Zhonghua Chemical Standardization Institute. Organizations participating in the drafting of this standard. Changzhou Entry-Exit Inspection and Quarantine Bureau, Nantong Entry-Exit Inspection and Quarantine Bureau, Tianjin Yishang Investment Co., Ltd. Main drafters of this standard. Zhou Wei, Zhou Feizhou, Wang Xiaobing, Wang Hua, Mei Jian, Wang Rong, Zhang Junxi. This standard was first published in August 1986. General rules for sampling solid chemical products

1 Scope

This standard specifies the sampling techniques, sample preparation, and sampling report for solid chemical products. This standard applies to the sampling of solid chemical products. This standard does not apply to the sampling of suspended solids and slurries in gases.

2 Normative references

The terms in the following documents become the terms of this standard by reference. For dated references, all subsequent amendments (not including errata content) or revisions do not apply to this standard. However, parties reaching an agreement based on this standard are encouraged to study whether the latest versions of these documents can be used. For undated references, the latest version applies to this standard. GB/T 3723, Sampling of chemical products for industrial use - Safety in sampling (GB/T 3723-1999, idt ISO 3165.1976) GB/T 6678-2003, General principles for sampling chemical products

3 General

3.1 Sample types of solid chemical products Sample types include partial sample, directional sample, representative sample, cross- sectional sample and geometric sample. The sample type shall be determined based on the sampling purpose, sampling conditions, and material conditions (batch size, geometric state, particle size, uniformity, and variability distribution of characteristic values). 3.2 Basic requirements for samples 3.2.1 Sampling inspection is an inspection method that evaluates and judges the quality of the overall material by inspecting samples. The sample must be representative of the overall material characteristics. 3.2.2 The amount of samples collected shall be able to represent all the characteristics 3.4 Sampling plan 3.4.1 A sampling plan must be developed before sampling. 3.4.2 The purpose of developing a sampling plan is to obtain representative samples of the overall material at the lowest cost and within the allowable sampling error range. 3.4.3 The factors that must be considered when developing a sampling plan are mainly the sampling purpose, the difference in overall material characteristic values, the allowable sampling error, and the packaging and transportation method of the material (according to the provisions of GB/T 6678). 3.4.4 The theoretical basis for formulating the sampling plan is specified in GB/T 6678. 3.5 Others 3.5.1 Since there are many types of solid chemical products and the sampling conditions are ever-changing, the sampling shall be based on the basic principles and methods specified in this standard, and the optimal sampling plan and sampling techniques shall be selected according to the actual situation and possibility.

4 Sampling techniques

4.1 Principle for selecting sampling techniques 4.1.1 The principles for selecting sampling techniques shall be based on the shape, particle size, quantity, difference in material characteristic values, and state (stationary or moving) of the materials to be sampled. 4.2 Basic requirements for samplers and sample dividers 4.2.1 The materials used must not have any reaction with the materials to be sampled, and must not cause contamination, delamination or loss of the materials to be sampled. 4.2.2 It shall be clean, dry, easy to use, clean, maintain, inspect and repair. 4.2.3 Any sampling device (especially automatic sampler) shall be subject to a feasibility test before formal use. 4.2.4 For the types of samplers and sample dividers, see Appendix A, Appendix B, Appendix C, Appendix D and Appendix E. 4.3 Sampling method 4.3.1 Sampling of powders, granules and small crystals 4.3.3 Sampling of massive materials 4.3.3.1 Stationary materials Respectively take partial samples, directional samples, geometric samples or representative samples according to the material conditions. They are separately described as follows. a) Partial sample 4.3.3.2 Moving materials Take cross-sectional samples randomly or at certain time intervals. If the material can be crushed, take samples according to the method in 4.3.1 after crushing. 4.3.4 Sampling of solids that can be cut Use a knife or other suitable tool (such as a metal wire) to take a cross-sectional sample or a geometric sample of a certain shape and weight from a certain part of the material. 4.3.5 Solids requiring special processing 4.3.5.4 Sampling of solids that react with the surrounding environment 4.3.5.5 Reactive or unstable solids Such solids shall be sampled in accordance with relevant standards and regulations.

5 Sample preparation

5.1 Purpose of sample preparation Obtain the optimal amount of samples from a larger amount of original samples that can meet the inspection requirements and whose properties to be measured can represent the overall material characteristics. 5.2 Principle of sample preparation 5.3 Sample preparation stage It generally includes three stages. crushing, mixing and reduction. The operation shall be repeated one or more times depending on the situation until the final sample is obtained. 5.4 Sample preparation techniques Crushing, mixing, and reduction can be carried out by manual or mechanical methods according to the situation and possibility. 5.4.1 Crushing 5.4.2 Mixing 5.4.2.1 Manual method Depending on the size of the sample, use an appropriate hand tool (such as hand shovel, etc.) to mix the sample. 5.5 Final sample quantity and storage 5.5.1 The final sample quantity shall meet the needs of testing and preparation. Divide the sample into two generally equal parts. One for testing and one for reference. The amount of each sample shall be at least three times the amount required for testing. 5.5.2 Packaging materials and appropriate packaging forms that are inert to the sample shall be selected based on the sample and storage time. 5.5.3 Sample packaging containers shall comply with the provisions of GB/T 6678. 5.5.4 The container shall be labeled with the specified content immediately after loading (according to the provisions of GB/T 6678).

6 Sampling report

According to the provisions of GB/T 6678. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 6679-2003 be delivered?Answer: The full copy PDF of English version of GB/T 6679-2003 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 6679-2003_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 6679-2003_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 6679-2003 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

Question 5: Should I purchase the latest version GB/T 6679-2003?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 6679-2003 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.

How to buy and download a true PDF of English version of GB/T 6679-2003?

A step-by-step guide to download PDF of GB/T 6679-2003_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 6679-2003".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9