Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB/T 39132-2020 PDF English

US$155.00 · In stock · Download in 9 seconds
GB/T 39132-2020: Fuel cell electric vehicle engineering approval evaluation program
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB/T 39132-2020155 Add to Cart Auto, 9 seconds. Fuel cell electric vehicle engineering approval evaluation program Valid

Similar standards

GB/T 38698.1   GB/T 38661   GB 38032   GB/T 34015.5   

GB/T 39132-2020: Fuel cell electric vehicle engineering approval evaluation program

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT39132-2020
GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 43.080.01 T 47 Fuel cell electric vehicle engineering approval evaluation program ISSUED ON: OCTOBER 11, 2020 IMPLEMENTED ON: MAY 01, 2021 Issued by: State Administration for Market Regulation; Standardization Administration of the People's Republic of China.

Table of Contents

Foreword ... 3 1 Scope ... 4 2 Normative references ... 4 3 Terms and definitions ... 5 4 Implementation conditions ... 5 5 Test items, test methods and judgment basis ... 6 6 Test procedures ... 8 7 Test report ... 8 Annex A (informative) Test method for driving range ... 10 Bibliography ... 12 Fuel cell electric vehicle engineering approval evaluation program

1 Scope

This Standard specifies implementation conditions, test items, test methods, judgment basis, test procedures and test report content for new product engineering approval evaluation program of fuel cell electric vehicle. This Standard is applicable to fuel cell electric vehicle that uses compressed gaseous hydrogen.

2 Normative references

The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. GB 1495, Limits and measurement methods for noise emitted by accelerating motor vehicles GB/T 12538, Road vehicles with two axles - Determination of centre of gravity GB/T 12673, Motor vehicle main dimensions measurement method GB/T 12674, Motor vehicles - Weight parameter - Measuring method GB/T 19750-2005, Hybrid electric vehicles - Engineering approval evaluation program GB/T 19752, Hybrid electric vehicle - Power performance - Test method GB 20890-2007, Test Procedures and Requirement of Durability of Emission Control Systems for Heavy-duty Vehicles GB/T 24548, Fuel cell electric vehicles - Terminology GB/T 24549, Fuel cell electric vehicles - Safety requirements GB/T 26779, Fuel cell electric vehicles - Refueling receptacle a) Major changes are required to meet the requirements of national standard inspection items; b) The effectiveness of steering and braking systems cannot ensure driving safety; c) There is a big gap between test vehicle performance indicators and product technical conditions; d) The frame, body and its load-bearing system are broken or cracked, and the test cannot be carried out; e) The fuel cell system, battery system, motor and its control system, DC/DC converter, on-board hydrogen system, on-board charging system have serious problems or frequent problems that cannot be tested; f) Other circumstances that the testing organization considers that the test shall be terminated. 4.5 During the test, the operation shall be carried out according to the provisions of the instruction manual. Maintenance shall be performed. 4.6 After the test is completed, the testing organization will provide a test report according to the provisions of Clause 6 and Clause 7.

5 Test items, test methods and judgment basis

5.1 General rules 5.1.1 The test vehicle shall be subjected to three tests: compulsory national standards and related regulations inspection, whole-vehicle performance test and whole-vehicle reliability driving test. 5.1.2 The test items of the modified vehicles shall be determined according to the specific changes. All items that change due to the modification shall be tested (inspected). 5.2 Compulsory national standards and related regulations inspection 5.2.1 Overview Vehicles shall meet the requirements of relevant mandatory national standards and related regulations. See 5.2.2~5.2.4 for the three test methods of external noise, hydrogenation port, and vehicle hydrogen system. 5.2.2 Test of external noise a test site authorized by the state. 5.4.2 The total mileage of the reliability driving test is 15000km. Test in the hybrid drive mode. For the vehicle of which the total mass is not greater than 3500kg, the mileage is allocated as follows: strengthened bad road -- 3000km, flat road -- 2000km, high-speed runway -- 5000km, durable working condition - - 5000km (in accordance with Annex B of GB/T 19750-2005). For the vehicle of which the total mass is greater than 3500kg, the mileage is allocated as follows: strengthened bad road -- 3000km, flat road -- 2000km, high-speed runway -- 5000km, durable working condition -- 5000km (in accordance with Annex A of GB 20890-2007). 5.4.3 The main assembly shall not have types 1, 2 failures during the test. After the test, the insulation performance, hydrogen leakage and idling exhaust emissions of the vehicle shall meet the requirements of GB/T 24549. NOTE 1: Type 1 failure refers to a failure that has occurred or will have a destructive situation, which leads to the loss of system functions and may cause personal danger or the main assembly of the vehicle to be scrapped; it needs to take emergency stop and issue warning measures. Type 2 failure refers to a failure that seriously degrades the performance of the system or damages the main assembly and cannot continue to operate but does not constitute a personal danger; it may take normal shutdown and issue warning measures.

6 Test procedures

6.1 Receive and check the test sample vehicle. Register it. 6.2 Conduct run-in driving in accordance with the manufacturer's regulations. 6.3 Carry out the tests such as compulsory national standards and related regulations inspection, whole-vehicle performance test, reliability driving test, and whole-vehicle performance retest.

7 Test report

The test report shall contain the following information: a) Task source; b) Test purpose; c) Basis for determining the test plan; d) Main standards for test basis;

Annex A

(informative) Test method for driving range A.1 Test conditions A.1.1 Conduct the indoor test at room temperature of 20°C~30°C. A.1.2 The viscosity of lubricating oil for mechanical moving parts meets the manufacturer's regulations. A.1.3 Turn off the lighting, signal devices and auxiliary equipment on the vehicle, unless these devices are required for testing and daytime operation of the vehicle. A.1.4 Except for driving purposes, all energy storage systems are charged to the maximum value specified by the manufacturer (electricity, hydraulic pressure, air pressure). A.1.5 The test driver makes the fuel cell and power battery work at normal operating temperature in accordance with the operating procedures recommended by the vehicle manufacturer. A.1.6 The test vehicle shall be run-in according to the manufacturer's specifications. The running-in mileage is not less than 300km. A.1.7 For M1 and N1 vehicles as well as M2 vehicles of which the total mass does not exceed 3500kg, chassis dynamometer settings are carried out in accordance with Annex CC of GB 18352.6-2016. For other types of vehicles, chassis dynamometer settings are in accordance with Annex C of GB/T 27840- 2011. If the driving resistance curve is provided by the automobile manufacturer, it shall provide a test report, calculation report or other relevant information. They shall be determined by the inspection agency. A.1.8 The pressure of the hydrogen storage system is the rated pressure specified by the manufacturer. The temperature of the hydrogen storage system is 10°C~20°C. A.1.9 For fuel cell electric vehicle equipped with power batteries and driven by power batteries, the SOC state of its power battery system is adjusted to (50±10)%. A.2 Test steps ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB/T 39132-2020 be delivered?Answer: The full copy PDF of English version of GB/T 39132-2020 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB/T 39132-2020_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39132-2020_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 39132-2020 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB/T 39132-2020?

A step-by-step guide to download PDF of GB/T 39132-2020_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB/T 39132-2020".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9