Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

GB 50720-2011 PDF English

US$145.00 · In stock · Download in 9 seconds
GB 50720-2011: Technical Code for Fire Safety of Construction Site
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
GB 50720-2011145 Add to Cart Auto, 9 seconds. Technical Code for Fire Safety of Construction Site Valid

Similar standards

GB 50966   GB 50987   GB 50898   GB 55037   

GB 50720-2011: Technical Code for Fire Safety of Construction Site

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GB50720-2011
NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA UDC P GB 50720-2011 Technical Code for Fire Safety of Construction Site Issued on. JUNE 6, 2011 Implemented on. AUGUST 1, 2011 Jointly issued by. Ministry of Housing and Urban-Rural Development of the People's Republic of China; General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China. National Standard of the People's Republic of China Technical Code for Fire Safety of Construction Site Chief Development Departments. Ministry of Housing and Urban-Rural Development of the People's Republic of China Ministry of Public Security of the People’s Republic of China Approval Department. Ministry of Housing and Urban-Rural Development of the People's Republic of China Implementation Date. August 1, 2011 2011 Beijing Announcement of the Ministry of Housing and Urban- Rural Development of the People's Republic of China No.1042 Announcement on Publishing the National Standard of “Technical Code for Fire Safety of Construction Site” The “Technical Code for Fire Safety of Construction Site” has been approved as the national standard with a serial number of GB 50720-2011 and will be implemented since August 1, 2011.Therein, Articles 3.2.1, 4.2.1 (1), 4.2.2 (1), 4.3.3, 5.1.4, 5.3.5, 5.3.6, 5.3.9, 6.2.1, 6.2.3, 6.3.1 (5, 9), and 6.3.3 (1) are compulsory provisions and must be enforced strictly. Authorized by the Standard Rating Research Institute of the Ministry of Housing and Urban-Rural Development of the People’s Republic of China, this code is published and distributed by China Planning Press. Ministry of Housing and Urban-Rural Development of the People's Republic of China June 6, 2011

Table of Contents

Foreword... 4 1 General Provisions... 7 2 Terms... 8 3 General Plan Layout... 9 4 Fire Protection of Construction Site... 13 5 Temporary Fire Control Facilities... 17 6 Fire Safety Management... 24 Explanation of Wording in This Code... 31 List of Quoted Standards... 32

1 General Provisions

1.0.1 This code is formulated with a view to preventing fire accidents on construction site, reducing fire hazards and protecting personal and property safety. 1.0.2 This code is applicable to the fire protection on various newly-built, rebuild and expanded construction sites. 1.0.3 Fire protection must conform to relevant state policies and reliably fire precaution measures, on a basis of self-prevention and self-rescue, shall be taken for different characteristics of fire accidents on construction site to achieve safe, reliability, economy, rationality and convenience. 1.0.4 Fire protection on construction site shall not only conform to this code but also comply with those in the current relevant ones of the nation.

2 Terms

2.0.1 Temporary construction It refers to various non-permanent buildings built at the construction site and serving for the construction, including office buildings, dormitories, kitchen rooms, canteens, boiler rooms, generator rooms, power distribution rooms, warehouse, etc. 2.0.2 Temporary facility It refers to various non-permanent facilities built at the construction site and serving for construction, including fences, gates, temporary roads, materials storage yard and processing yard, fixed fire work field, work shed, machinery shed, reservoir as well as temporary water supply and drainage, power supply and heating pipelines. 2.0.4 Temporary evacuation route It refers to the route for personnel safely evacuate the danger area and arrive at safe place or safe zone when there is fire or other accidents on the construction site.

3 General Plan Layout

3.1 General Requirement 3.1.1 The layout of temporary construction and temporary facilities shall meet the requirements of on-site fire protection, fire extinction and safe evacuation of personnel. 3.1.4 The temporary functional zone for office, living, production and material storage should be relatively independent; the fire separation shall conform to provisions living Articles 3.2.1 and 3.2.2 in this code. 3.1.5 The fixed fire work field shall be arranged on the windward side with minimum rate all year around of combustible material storage yard and processing yard and inflammable & explosive dangerous goods warehouse; should be arranged on the windward side with minimum rate all year around of temporary office buildings, dormitories, combustible material warehouses and buildings during construction. 3.2 Fire Separation 3.2.1 The fire separation between inflammable & explosive dangerous goods warehouse and buildings during construction shall not be less than 15 m; the fire separation between combustible material storage yard, processing yard, fixed fire work field and buildings during construction shall not be less than 10 m; and the fire separation between other temporary construction, temporary facilities and buildings during construction shall not be less than 6 m. 3.3 Fire Lane 3.3.1 Temporary fire-fighting access shall be arranged on construction site. The distance between temporary fire lane and buildings during construction, temporary construction, combustible material storage yard and processing yard should not be less than 5 m and should not be greater than 40 m; Where the roads around the construction site meet the requirements for fire vehicle passing, fire extinction and rescue, temporary fire lane may not be arranged on construction site. 3.3.4 The arrangement of temporary fire-fighting and rescue site shall meet the following requirements.

4 Fire Protection of Construction Site

4.1 General Requirement 4.1.1 Fire protection measures such as reliable fire separation and safe evacuation shall be taken for temporary construction and buildings during construction. 4.2 Fire Protection for Temporary Construction 4.2.1 Fire protection design of dormitories and office buildings shall meet the following requirements. 4.2.2 The fire protection design of generator rooms, power transformation and distribution rooms, kitchen rooms, boiler rooms, combustible material warehouses and inflammable & explosive dangerous goods warehouses shall meet the following requirements. 4.3 Fire Protection for Buildings During Construction 4.3.1 The temporary evacuation route of the workplace of buildings during construction shall be constructed by incombustible and nonflammable materials and shall be arranged synchronously with the construction of the construction structure in progress. The horizontal structure and staircase after the completion of buildings during construction may be adopted. 4.3.5 The following safety protection net shall be flame retardance type. 4.3.6 The workplace shall be set with clear evacuation indicatory signs directing to the nearest entrance of temporary evacuation route.

5 Temporary Fire Control Facilities

5.1 General Requirement 5.1.1 Temporary fire control facilities such as fire extinguisher, temporary fire water supply system and emergency lighting shall be arranged on the construction site. 5.1.5 Gas masks shall be equipped for the construction site of underground works. 5.1.6 The reservoir, fire hydrant pump, indoor fire standpipe and pump adapter of temporary fire water supply system shall be set with eye-striking marks. 5.2 Fire Extinguisher 5.3.7 Temporary outdoor fire water supply system of construction site shall be arranged according to the following requirements. 5.3.15 The feed pressure of temporary fire water supply system shall be with the length of substantial water column of the fire water branch no less than 10 m, otherwise at least 2 fire hydrant pumps (standby for each other) shall be installed. The fire hydrant pump should be arranged with automatic starting device. 5.4 Emergency Lighting 5.4.1 The following places at construction site shall be equipped with temporary emergency lighting. 5.4.2 Illuminance of emergency lighting at workplace shall not be less than 90 % of that required in normal works; the illuminance value of evacuation route shall not be less than 0.5 lx.

6 Fire Safety Management

6.1 General Requirement 6.1.1 The fire safety management at construction site shall be in the charge of construction organization. 6.1.2 Supervision organization shall take charge of the fire safety management at the construction site. 6.1.4 The construction organization shall formulate fire safety management system specific to the construction operation having potential fire hazard and other activities at construction site. Fire safety management system shall include the following content. 6.1.9 In construction process, the fire safety principal shall organize the fire safety management personnel to inspect the construction site for fire safety regularly. The fire safety inspection shall include the following contents. 6.2 Management of Combustibles, Explosives and Dangerous Articles 6.2.1 The flammability level of materials for the thermal insulation, water resistance, decoration and corrosion protection of buildings during construction shall meet the design requirements. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of GB 50720-2011 be delivered?Answer: The full copy PDF of English version of GB 50720-2011 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of GB 50720-2011_English with my colleagues?Answer: Yes. The purchased PDF of GB 50720-2011_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB 50720-2011 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of GB 50720-2011?

A step-by-step guide to download PDF of GB 50720-2011_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "GB 50720-2011".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9