|
Std ID |
Description (Standard Title) |
|
SY/T 6102-2006
|
Oil field development monitoring and data requirement
|
|
SY/T 6103-1994
|
(Experimental methods of pore body epoxy Prayer)
|
|
SY/T 6103-2004
|
Measurement of rock pore structure Method of image analysis
|
|
SY/T 6104-1994
|
(Hollow rod electric heating device)
|
|
SY/T 6105-1994
|
(Field development conceptual design prepared the technical requirements)
|
|
SY/T 6105-2009
|
Technical requirements for feasible evaluation of oil field development
|
|
SY/T 6106-1994
|
(Carbonate gas reservoir development and design preparation of the technical requirements)
|
|
SY/T 6106-2003
|
Technical requirement for preparing of development plan for gas reservoir
|
|
SY/T 6106-2008
|
Technical requirement of preparing gas field development plan
|
|
SY/T 6106-2014
|
Technical requirement of preparing gas field development plan
|
|
SY/T 6107-1994
|
(Determination of thermal properties of reservoir rock parameters)
|
|
SY/T 6107-2002
|
Test method for rock thermal petrophysical parameters
|
|
SY/T 6107-2010
|
Test method of reservoir thermophysical parameters
|
|
SY/T 6108-1994
|
(Carbonate Gas Reservoir Dynamic Analysis of Technical Specifications)
|
|
SY/T 6108-2004
|
Technical specification of performance analysis for carbonate gas reservoir
|
|
SY/T 6108-2012
|
Technical specifications of performance analysis for gas reservoirs
|
|
SY/T 6109-1994
|
Chart format of report on petroleum and natural gas reserves
|
|
SY/T 6110-1994
|
(Carbonate Gas Reservoir Geology characterization)
|
|
SY/T 6110-2002
|
The description of exploitation geologic characteristics for carbonate gas reservoir
|
|
SY/T 6110-2008
|
The method for gas reservoir description
|
|
SY/T 6110-2016
|
The method for gas reservoir description
|
|
SY/T 6111-1994
|
(Carbonate gas reservoir development adjustment programs prepare technical specifications)
|
|
SY/T 6111-2007
|
Technical requirements for preparing of development plan adjustment for gas reservoir
|
|
SY/T 6112-1994
|
(Oil drilling equipment pneumatic components Pressure regulator)
|
|
SY/T 6113-1994
|
(Workover pneumatic chuck technical conditions)
|
|
SY/T 6113-2008
|
Pneumatic spider for well servicing
|
|
SY/T 6113-2016
|
Pneumatic spider for well servicing
|
|
SY/T 6114-1994
|
(Fracturing manifold car)
|
|
SY/T 6115-1994
|
(Flushing fluid handling car)
|
|
SY/T 6115-2012
|
Self-circulation well-flushing equipment
|
|
SY/T 6117-1994
|
(Petroleum workover rig use and maintenance)
|
|
SY/T 6117-2003
|
The operating and maintenance of petroleum workover rig
|
|
SY/T 6117-2010
|
The operating and maintenance of petroleum workover rig
|
|
SY/T 6117-2016
|
(Oil rig and workover rig use and maintenance)
|
|
SY/T 6118-1995
|
(Technical specification for running thermal recovery steam generator water treatment system)
|
|
SY/T 6118-2013
|
The technical specifications for water processing system operation of thermal recovery steam generator
|
|
SY/T 6119-1995
|
(Rod pumping wells condition tester)
|
|
SY/T 6119-2012
|
Instrument for system condition of pumping well
|
|
SY/T 6120-1995
|
(Downhole oil well blowout technical regulations)
|
|
SY/T 6120-2013
|
Specification for blowout prevention during down-hole operations in oil well
|
|
SY/T 6121-1995
|
(Packers stuck salvage craft practice)
|
|
SY/T 6121-2009
|
Recommended methods of packer releasing and fishing
|
|
SY/T 6123-1995
|
(Double prefilled plastic sand control screen)
|
|
SY/T 6124-1995
|
(Gas lift gas drainage technologies practice)
|
|
SY/T 6124-2010
|
Practice for water drainage and gas production by gas lift technology
|
|
SY/T 6125-1995
|
(Dynamic gas well monitoring technical specifications)
|
|
SY/T 6125-2006
|
Technology procedures for gas well testing, gas producing and performance monitoring
|
|
SY/T 6125-2013
|
Technology procedures for gas well testing, gas producing and performance monitoring
|
|
SY/T 6126-1995
|
Statistics of Production Indices for Wells with Pumping Unit or ESP
|
|
SY/T 6127-1995
|
(Downhole oil and gas wells project specifications admission information)
|
|
SY/T 6127-2006
|
Specification of data collection items for downhole operation in oil, gas, water wells
|
|
SY/T 6128-1995
|
(Oil casing threaded performance evaluation method)
|
|
SY/T 6128-2012
|
Procedure for evaluation tests of tubing and casing connection properties
|
|
SY/T 6129-1995
|
Determination for diffusion coefficient of hydrocarbon gases in rock
|
|
SY/T 6129-2016
|
(Determination of Diffusion Coefficient of Hydrocarbon in Rock)
|
|
SY/T 6130-1995
|
(Steam injection wells vapor absorption profile parameters of the test and interpretation)
|
|
SY/T 6130-2009
|
The parameter test and injection profile explanation method for steam injection well
|
|
SY/T 6131-1995
|
(Clastic particle size measurement laser method)
|
|
SY/T 6132-1995
|
(Coal and rock measuring methane adsorption Capacity Act)
|
|
SY/T 6132-2013
|
Determination of the methane isothermal adsorption quantity in coal. Capacity method of dry basis
|
|
SY/T 6133-1995
|
(Synthetic hydrochloric acid for industrial use procurement rules)
|
|
SY/T 6134-1996
|
(Sucker rod couplings and procurement rules)
|
|
SY/T 6135-1995
|
(Oil companies access to library materials commonly prescribed metered)
|
|
SY/T 6136-1996
|
(Oil (gas) wellhead equipment procurement rules)
|
|
SY/T 6137-2005
|
Recommended practices for oil and gas producing and gas processing plant operations involving hydrogen sulfide
|
|
SY/T 6138-1996
|
(Selection and procurement of technical provisions oilfield valves)
|
|
SY/T 6139-1996
|
Terms used in well logging for oil and gas
|
|
SY/T 6139-2005
|
Terms used in well logging for oil and gas
|
|
SY/T 6140-1995
|
(Oilfield water treatment scale inhibitor essence procurement rules)
|
|
SY/T 6141-1996
|
(Oilfield injection pump procurement rules)
|
|
SY/T 6142-1995
|
(Oilfield procurement rules set pump)
|
|
SY/T 6143-1996
|
Standard orifice measurement method for natural gas flow
|
|
SY/T 6143-2004
|
Measurement of natural gas flow by means of standard orifice plates meter
|
|
SY/T 6144-1995
|
Standard orifice measurement method for natural gas flow
|
|
SY/T 6144-2008
|
Technical specifications of neutron lifetime logging tool
|
|
SY/T 6145-1995
|
(Low-band seismograph)
|
|
SY/T 6145-2008
|
Near surface seismic instrument for petroleum exploration
|
|
SY/T 6146-1995
|
Parameter meter for drilling - Compund table for driller operation
|
|
SY/T 6147-1995
|
(Echo sounder)
|
|
SY/T 6148-1995
|
(Pipeline pigging procedures)
|
|
SY/T 6149-1995
|
(Gas pipeline pressure test run technical specifications)
|
|
SY/T 6150.1-2003
|
Technical standard of tapping and plugging on steel pipeline-Part 1: Plug and cylinder stopple
|
|
SY/T 6150.1-2011
|
Technical standard of tapping and plugging on steel pipeline. Part 1: Plug stopple and barrel stopple
|
|
SY/T 6150.2-2003
|
Technical standard of tapping and plugging on steel pipeline -- Part 2: The rigide plate-bag stopping on pipeline
|
|
SY/T 6150.2-2011
|
Technical standard of tapping and plugging on steel pipeline. Part 2: The rigid plate-bag stopping on pipeline
|
|
SY/T 6150-1995
|
(Oil and gas pipelines transport machinery kept plugging operation Technical Specification)
|
|
SY/T 6151-1995
|
(Steel Pipe body corrosion damage assessment method)
|
|
SY 0031-2004
|
The petroleum industrial furnace safety procedures
|
|
SY/T 6152-1995
|
(Adapters and aura procurement technical requirements)
|
|
SY/T 6153-1995
|
(Drill stabilizer technology procurement regulations)
|
|
SY/T 6154-1995
|
Determination for rock specific surface area and pore size distribution - Static nitrogen absorption volumetric method
|
|
SY/T 6155-1995
|
Guide for compiling reliability evaluation and test rules for petroleum equipment
|
|
SY/T 6156-1995
|
Guide for compiling reliability evaluation and test rules for petroleum equipment
|
|
SY/T 6156-2003
|
Technical specification of airgun source
|
|
SY/T 6156-2010
|
Technical specification of airgun source
|
|
SY/T 6158-1995
|
(Oil and gas exploration wells admission geological data project)
|
|
SY/T 6159-1995
|
(Drilling fluid agitator)
|
|
SY/T 6160-1995
|
(BOP hydraulic inspection and repair)
|
|
SY/T 6160-2008
|
Check and maintenance of blowout preventer
|
|
SY/T 6160-2014
|
Check and maintenance of blowout preventer
|