Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH
Industry Standard: SY, SY/T, SYT
              
SY << ...>> SY
Std ID Description (Standard Title)
SY/T 5838-1993 (Oil (gas) field (hidden) reserves of technical and economic evaluation requirements)
SY/T 5838-2011 Guidline for evaluation of land proved petroleum initial reserves
SY/T 5839-1993 (Expansive formation tester operating procedures)
SY/T 5840-1993 (Drilling plugging material bridging laboratory test methods)
SY/T 5840-2007 Recommended practice for laboratory testing of bridging materials for drilling fluids
SY/T 5841-1993 (Drilling technical and economic indicators and calculation methods)
SY/T 5841-2005 Drilling tech-economic indexes and calculation methods
SY/T 5841-2011 Drilling tech-economic indexes and calculation methods
SY/T 5842-1993 (Sandstone oilfield development programming technology requires the development of geological reservoir engineering section)
SY/T 5842-2003 Technical requirements of compiling the development plan of sandstone oil field development geology and reservoir engineering
SY/T 5843-1993 (Chinese Industry Standard)
SY/T 5843-1997 Gas-water relative permeability measurement
SY/T 5844.1-1995 (Petroleum Geology experimental information code. Geochemistry section)
SY/T 5844.1-2012 The specification for names of data in the petroleum geology experiments. Part 1: Geochemistry
SY/T 5844.2-1995 (Petroleum Geology experimental information sedimentary ore code section)
SY/T 5844.2-2012 The specification for names of data in the petroleum geology experiments. Part 2: The sedimentary rock mineral
SY/T 5846-1993 (Casing patch technology practice)
SY/T 5846-2011 Recommended practice for casing patch process
SY/T 5847-1993 (Pumping wells dynamic control chart preparation and method of use)
SY/T 5847-2012 The drawing and application method of dynamic control chart for rod-pumping well
SY/T 5848-1993 (Sucker off prevention device)
SY/T 5848-2011 Resistance to screw collar
SY/T 5849-1993 (Oil wells chemicals plugging Evaluation practice)
SY/T 5849-2002 The method for economic effect evaluation of removing plugging by chemicals in production and injection well
SY/T 5851-1993 (Sandstone oilfield water injection technology to be developed to adjust the programming technique)
SY/T 5851-2005 Technical requirements for compilation of adjusting development design for oilfield
SY/T 5851-2016 (Technical Requirements for Oilfield Development Adjustment Program)
SY/T 5852-1993 (Offshore gas well completion test specification)
SY/T 5854-2005 The safety regulation of moist steam generator specially used in oilfield
SY/T 5857-2006 Management regulations of civil explosion equipments in the seismic operation of petroleum geophysical exploration
SY/T 5858-2004 Safe operational regulations of hot work in petroleum industry
SY/T 5859-1993 (Bridge plug seat seal tool)
SY/T 5859-1995 (Bridge plug packer tool)
SY/T 5860-1993 (Plastic ball pitching device)
SY/T 5861-1993 (Fracturing wellhead protection)
SY/T 5862-1993 (Flooding acrylamide polymer performance measurement)
SY/T 5862-2008 Technical criterions of polymer for oil displacement
SY/T 5863-1993 (Submersible pump from under the operating methods)
SY/T 5863-2012 The procedure for the ESP pulling out and installation
SY/T 5864-1993 (Pumping wells dynamometer test)
SY/T 5864-2012 Dynamometer card test of the rod-pumping well
SY/T 5865-1993 (Sandstone oilfield injection wells effect profile evaluation method)
SY/T 5867-1993 (Oil and gas resource evaluation method Classification and Coding)
SY/T 5867-2012 Coding for hte classified methodologies of petroleum resources assessment
SY/T 5869-1993 (Flowing well downhole pressure test routine)
SY/T 5870-1993 (Casing patch bellows)
SY/T 5871-1993 (Throw hand drill packer)
SY/T 5872-1993 (Pump maintenance procedures)
SY/T 5872-2011 Inspection and repair regulations of sucker rod pumps
SY/T 5873.1-1993 (There rod pumping operations craft practice. Conventional pumping)
SY/T 5873.2-1994 (There rod pumping operations craft practice. Small pump deep drawing)
SY/T 5873.3-1993 (There rod pumping operations craft practice. Deviated pumping)
SY/T 5873.4-1993 (There rod pumping operations craft practice. Large pumping oil)
SY/T 5873-2005 Recommended practice for design and execution of sucker rod pumping system
SY/T 5874-1993 (Water-repellent effect evaluation method)
SY/T 5874-2003 Evaluation method on oil well water plugging
SY/T 5874-2012 Evaluation method on oil well water plugging
SY/T 5875-1993 (Well level test methods)
SY/T 5875-2011 Test method of oil well liquid level
SY/T 5877-1993 (Density Instrument Maintenance Technical Specifications)
SY/T 5877-2000 Technology procedure for compensated density logging tool maintenance
SY/T 5878-1993 (Natural gamma logging tool maintenance technical specifications)
SY/T 5879-1993 (Dual Induction - eight lateral logging instrument maintenance technical specifications)
SY/T 5880.1-1997 Petroleum logging tool calibration - General rules
SY/T 5880.2-1993 (Dual Induction - eight lateral calibration for logging procedures)
SY/T 5880.3-1994 (Microspheres focus calibration for logging procedures)
SY/T 5880.4-1995 Petroleum Logging Tool Calibration - Acoustic Velocity Logger
SY/T 5881-1993 (Mechanical and electrical equipment exports oil industry contract specifications)
SY/T 5882-1993 (Mechanical and electrical equipment imported oil industry contract specifications)
SY/T 5883-1993 (Complete sets of mechanical and electrical equipment export oil industry contract specifications)
SY/T 5884-1993 (Fracturing technical conditions)
SY/T 5885-1993 (Acidified with concentrated hydrochloric acid inhibitor CT1-3)
SY/T 5886-1993 (Slow acidic sandstone Evaluation Method)
SY/T 5886-2012 Methods for evaluating performances of retarded acid
SY/T 5888-1993 Evaluation Method for Flotation Agent Effect - Rotor Gettering
SY/T 5888-2016 A flotation effect evaluation method of flotation agent. Turbine flotation
SY/T 5889-1993 (Oxygen scavenger performance evaluation method)
SY/T 5889-2010 Oxygen scavenger performance evaluation method
SY/T 5890-1993 (Fungicide Performance Evaluation Method)
SY/T 5891.1-1993 (Wells perforated shells (device) to detect the production of concrete target specifications)
SY/T 5891.1-1999 Specification of making concrete targets for well perforators test
SY/T 5891.2-1993 (Oil and gas wells to detect guns and Comprehensive Evaluation Method)
SY/T 5892-1993 (Logging Perforating new technology into production regulations)
SY/T 5893-1993 Specification of making concrete targets for well perforators test
SY/T 5894-1993 (Oilfield special vehicle maintenance labor quota)
SY/T 5895-1993 (Quantities and units used petroleum industry exploration and development section)
SY/T 5896-1993 (Labor quota Gas Project)
SY/T 5896-2002 Labor quota of gas production engineering
SY/T 5896-2012 Labor quota of gas production engineering
SY/T 5897-1993 (Labor quota Gas Transmission Project)
SY/T 5897-2002 Labor quota of gas transmission engineering
SY/T 5897-2012 Labor quota of gas transmission engineering
SY/T 5898-1993 (Earthquake General technical data transmission cables)
SY/T 5899-1993 (Hydraulic dynamometer technical conditions)
SY/T 5900-1993 Technical Conditions of Bimetal Downhole Thermometers
SY/T 5901-1993 (Petroleum Exploration and Development Instrument Category)
SY/T 5901-2011 Classification for petroleum exploration and development instruments
SY/T 5902-1993 Basic Environment Test Method of Instrument for Petroleum Exploration and Development - Test I: Drop and Topple Test
SY/T 5903-1993 (Rod string group and design methods)
SY/T 5904-1993 (Well submersible pump selection pump design principles and selection method)