Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH
Industry Standard: SY, SY/T, SYT
              
SY << ...>> SY
Std ID Description (Standard Title)
SY/T 5716.4-1995 (Oil rig overhaul technical conditions. Turntable)
SY/T 5716.5-1995 (Oil rig overhaul technical conditions. Winch)
SY/T 5716.6-1995 (Oil rig overhaul technical conditions. Water brakes)
SY/T 5716.7-1995 Technical conditions for heavy repair of oil rig - Electromagnetic eddy current brake
SY/T 5716.8-1995 (Oil rig overhaul technical conditions gearing)
SY/T 5716.9-1995 (Oil rig overhaul technical conditions torque converter)
SY/T 5717-1995 (Single well clastic reservoir evaluation)
SY/T 5718-1995 (Write regulations exploratory oil test mining results report)
SY/T 5718-2004 Writing specification of well testing report
SY/T 5718-2016 Specification for summary of well test and completion
SY/T 5719-2006 Safety specification for gas liquids
SY/T 5720-2006 Assessment rules of safety technology for driller
SY/T 5721-1995 Installation, Operation and Maintenance of Chain Drive Pumping Unit
SY/T 5722-1995 General Technical Specifications for Continuous Inclinometer
SY/T 5723-1995 (Mountain Earthquake Drill)
SY/T 5723-2010 Portable drilling rig
SY/T 5724-1995 (Casing string design)
SY/T 5724-2008 Design of casing structure and strength
SY/T 5725-1995 Calcium Carbonate Superfine Powder for Drilling Fluid
SY/T 5726-2004 Safety regulation for petroleum logging operation
SY/T 5729-1995 (Heavy oil thermal recovery wells back to the wells operating procedures)
SY/T 5729-2012 Heavy oil thermal-recovery well cementing operation procedure
SY/T 5730-1995 (Conventional cementing procedures)
SY/T 5731-1995 (Camp column wellhead jacket hanging load calculation method)
SY/T 5731-2012 Method for calculating the hanging load of casing strings
SY/T 5732-1995 (Locking finger-type pump off connector)
SY/T 5732-2011 Oil pump on-off connector
SY/T 5733-1995 (Injection wells eccentric water column stratification test deployment procedures)
SY/T 5733-2009 Procedures of stratified flow rate testing and adjusting on injection wells with eccentric water tube
SY/T 5733-2016 Method of well completion and layered testing and adjustment for zonal injection wells
SY/T 5734-1995 Test Specification for Examining Seal of Under-well Packer for Separate Mining and Separate Injection Well
SY/T 5735-1995 Geochemistry Evaluation Method for Land Facies Hydrocarbon Source Rock
SY/T 5736-1995 (Reinforced plastic rod)
SY/T 5737-2004 Safety regulation for crude oil pipelines transportation
SY/T 5738-1995 (Oil equipment repair work quota)
SY/T 5738-2012 Labor quota of oil production equipment repair
SY/T 5739-1995 (Substation equipment maintenance work quota)
SY/T 5739-2012 Labor quota of power transformer equipment maintenance
SY/T 5740-1995 (Polymer flooding pilot test design requirements)
SY/T 5740-2013 Technical requirements of polymer flooding development plan design and effect evaluation
SY/T 5741-1996 (Oil industry occupational safety and health data processing requirements)
SY/T 5744-1995 Specification for annular pressure testing of rod-pumped well
SY/T 5745-1995 Major terms of oil and gas production engineering
SY/T 5745-2008 Major terms of oil and gas production engineering
SY/T 5746-1995 (Submersible pump wells dynamic control chart preparation and method of use)
SY/T 5746-2009 The establishment and application methods of dynamic control chart for electric submersible pump well
SY/T 5748-1995 (Rock gas breakthrough pressure measurement)
SY/T 5748-2013 Determination method of gas breakthrough pressure in rock
SY/T 5749-1995 (Oil and gas gathering and transportation labor quota installation process engineering)
SY/T 5749-2004 Labor quota for installation engineering of oil and gas gathering and transferring process
SY/T 5749-2012 Labor quota for installation engineering of oil and gas gathering and transferring process
SY/T 5750-1995 (Power line maintenance work quota)
SY/T 5750-2010 Work quota for maintenance of power supply lines
SY/T 5750-2016 (Power supply line maintenance labor quota)
SY/T 5751-1995 (Petroleum Geology Rock name and color code)
SY/T 5751-2002 Codes for names and colors of rocks in the petroleum geology
SY/T 5751-2012 Codes for names and colors of rocks in the petroleum geology
SY/T 5752-1996 Codes of well information for oil and gas exploration
SY/T 5752-2012 Nomenclature specification of data items for petroleum logging
SY/T 5753-1995 Indoor evaluation of surfactant for measures taken for oil-well enhancement and water-well stimulation
SY/T 5753-2016 The performance evaluation method of surfactants for oil well acidizing and water well stimulation
SY/T 5754-1995 Performance evaluation method for mutual solvent for oil-field acidification
SY/T 5754-2016 Methods for evaluating performances of mutual solvent in acidizing
SY/T 5755-1995 Performance evaluation method for cleanup additive for fracture and acidificaiton
SY/T 5755-2016 The performance evaluation method of cleanup additive for fracturing and acidizing
SY/T 5756-1995 Sl-2 corrosion and scale inhibitor
SY/T 5757-1995 (Oilfield water injection fungicide general technical conditions)
SY/T 5757-2010 General specifications of bactericides for oilfield injecting water
SY/T 5758-1995 (Drilling fluid lubricated ball)
SY/T 5758-2011 Evaluating procedure for lubricating beads of drilling fluid
SY/T 5759-1995 Rules for name codes of petroleum-related computer network and its nodes as well as distribution of IP address
SY/T 5760-1995 (Hash code compilation method)
SY/T 5760-2010 Code of well compilation method
SY/T 5761-1995 Foaming agent for drainage and gas recovery
SY/T 5762-1995 Performance determination of clay stabilizer for fracture and acidification
SY/T 5763-1995 Flocculant JX-II
SY/T 5764-1995 (Fracturing with guar gum and hydroxypropyl guar)
SY/T 5764-2007 General technical specifications of natural plant gum for fracturing
SY/T 5765-1995 Test method for fluoroboric acid for acidification
SY/T 5766-1995 (Fracturing with fenugreek gum)
SY/T 5767-1995 (Transporting crude oil pour point depressant general technical conditions)
SY/T 5767-2002 Pour point depressant for pipelining crude oil
SY/T 5767-2005 Technical specification for practice of transporting crude oil treated with pour point depressants through pipeline
SY/T 5767-2016 Specification for pipelining crude oil treated with pour point depressants
SY/T 5768-1995 Technical specification for practice of transporting crude oil treated with pour point depressants through pipeline
SY/T 5768-2006 Welded steel pipe for normal structure purposes
SY/T 5768-2016 (General structure with welded steel pipe)
SY/T 5769-1995 (Land seismic acquisition assistance data format)
SY/T 5769-2012 Land seismic exploration ancillary data P1/90 format
SY/T 5770-1995 Land Seismic Exploration Ancillary Data P1/90 Format
SY/T 5771-1995 (Ground magnetic exploration technical regulations)
SY/T 5771-2004 Technical specification for ground magnetic exploration
SY/T 5771-2011 Technical specification for ground magnetic exploration
SY/T 5772-1995 (Oil controlled source audio magnetotelluric sounding exploration technical regulations)
SY/T 5772-2002 Technical rules of control source audio magnetotelluric exploration
SY/T 5772-2012 Technical rules of controled source audio magnetotelluric exploration
SY/T 5773-1995 (VISION seismic data acquisition system test items and technical indicators)
SY/T 5774-1995 (SN388 seismic data acquisition system test items and technical indicators)
SY/T 5774-2005 Checking item and technical specification for SN388 seismic data acquisition system
SY/T 5775-1995 (Technical specification for measuring seismic mountain)