HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

QC/T 818-2009 PDF English

US$150.00 · In stock · Download in 9 seconds
QC/T 818-2009: Spoke-wheels of motorcycles and mopeds
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
QC/T 818-2009English150 Add to Cart 0-9 seconds. Auto-delivery Spoke-wheels of motorcycles and mopeds Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: QC/T 818-2009
      

Similar standards

QC/T 62   QC/T 793   GB/T 38285   QC/T 233   

QC/T 818-2009: Spoke-wheels of motorcycles and mopeds

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/QCT818-2009
QC ICS 43.140 T 82 Automobile Industry Standard of the People’s Republic of China Spoke-wheels of motorcycles and mopeds Issued on: NOVEMBER 17, 2009 Implemented on: APRIL 1, 2010 Issued by. Ministry of Industry and Information Technology of the People’s Republic of China Ministry of Industry and Information Technology of the People’s Republic of China Announcement G.K. [2009] No. 63 Ministry of Industry and Information Technology has approved 139 industrial standards (such as “Snow blower vehicle”, etc.), including 29 standards for automobile industry, 29 for pharmaceutical equipment industry, 4 for packaging industry, and 77 for textile industry (standard No., name, main contents, and implementation date are shown in Appendix 1). The Ministry of Industry and Information Technology has approved and published the modification sheet for the textile industry standard — FZ/T 73001-2008 “Hosiery” (refer to Appendix 2). The modification sheet shall come into force since issuing date. Automobile industry standards will come into force since April 1, 2010. The above standards in the areas of automobile, pharmaceutical equipment, and packaging industries are published by China Planning Press. Textile industry standards are published by China Standardization Press. Appendix. Numbers and Names of 29 Automobile Industry Standards Ministry of Industry and Information Technology of the People’s Republic of China November 17, 2009

Table of Contents

Foreword ... 6 1 Scope ... 7 2 Normative references ... 7 3 Terms and definitions ... 8 4 Requirements ... 9 5 Test methods ... 12 6 Inspection rules ... 21 7 Label, package, transportation, and storage ... 23

Foreword

This Standard was proposed by National Technical Committee of Auto Standardization. This Standard shall be under the jurisdiction of National Technical Committee of Auto Standardization. Responsible drafting organizations of this Standard. Nanchang Motorcycle Quality Supervision Inspection Institute, Jiangsu Yuantong Auto Components Co., Ltd., and Asimco-ST (Sichuan) Components Co., Ltd. Participating drafting organizations of this Standard. Yongkang Junjian Industrial Co., Ltd., and Shanghai Baiqiang Auto & Motorcycle Components Co., Ltd. Main drafters of this Standard. Chen Jianfa, Ma Zhenxin, Liu Chengtong, Xu Kangjun, and Wang Youfang. Spoke-wheels of motorcycles and mopeds

1 Scope

This Standard specifies the terms and definition, requirements, test methods, inspection rules, label, package, transportation, and storage of spoke-wheels of motorcycles and mopeds. This Standard is applicable to the spoke-wheels of motorcycles and mopeds (hereinafter referred as wheel).

2 Normative references

The provisions in following documents become the provisions of this Standard through reference in this Standard. For dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard, however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB/T 228 Metallic materials — Tensile testing at ambient temperature (GB/T 228-2002, ISO 6892.1998(E), EQV) GB/T 1173 Casting aluminium alloys (GB/T 1173-1995, ASTM B26.1992, NEQ) GB/T 2828.1 Sampling procedures for inspection by attributes — Part 1. Sampling schemes indexed by acceptance quality limit (AQL) for lot-by-lot inspection (GB/T 2828.1-2003, ISO 2859-1.1999, IDT) GB/T 2933 Wheels/rims for pneumatic tyres — Nomenclature, designation and marking (GB/T 2933-1995, ISO/DIS 3911. 1993, EQV) GB/T 20975.1~GB/T 20975.24 Methods for chemical analysis of aluminium and aluminium alloys GB/T 7999 Optical emission spectrometric analysis method of aluminum and aluminum alloys GB/T 9438 Aluminium alloy castings (GB/T 9438-1999, ASTM B26/B26M.1992, NEQ) GB/T 13202 Series of motorcycle rims (GB/T 13202-2007, ISO 4249-3.2004, ISO 5995-2.1988, ISO 6054-2.1990, MOD) GB/T 13822 Test specimens for non ferrous diecasting alloys GB/T 15115 Die casting aluminum alloys GB/T 22435-2008 Light-alloy wheels for motorcycles and mopeds QC/T 725 Test method for calibrated diameter of motorcycles and mopeds rims using sphere-string ruler QC/T 726 Test method for calibrated diameter of motorcycles and mopeds rims using even strap ruler HG/T 2443 Test method of static loaded performance for tyres

3 Terms and definitions

The terms and definitions defined in GB/T 2933 AND the following terms and definitions apply to this Standard. 3.1 Wheel hub Part which is located between bearing and spoke of wheel. It usually has brake drum or can be installed with brake plate and transmission mechanism. 3.2 Spoke A kind of steel wire used to connect hub and rim. 3.3 Spoke nut Nut used to fix spoke on rim. 3.4 Wire spoke-wheel Rotating part located between tire and bearing, which is composed of rim, spoke, spoke nut, and hub. Figure 1 Measurement Position of Deformation of Back Wheel after Radial Impact 4.7.2 Radial load fatigue performance. After test for more than 5×105 rotation in accordance with 5.7.2, wheel shall be free of damage crack, breakage, and the abnormal loosen of joint part. The radial and axial circle run-out of wheel after test shall not be greater than 2.0mm. 4.7.3 Torsion fatigue performance. After test with more than 1×105 rotation in accordance with 5.7.3, wheel shall be free of damage crack, breakage, and the abnormal loosen of joint part. The radial and axial circle run-out of wheel after test shall not be greater than 2.0mm. 4.7.4 Air tightness (only applicable to wheel without inner tire). CONDUCT test in accordance with 5.7.4. The pressure of tire and rim shall be kept for at least 30s and there shall have no air leakage.

5 Test methods

5.1 Measurement of the calibrated perimeter of and width of rim 5.1.1 Measurement method of the calibrated perimeter of rim a) The diameter (perimeter) of WM-type column-type bead seat rim and slopping-bottom-style (straight) bead seat rim shall be measured by using the flat-tape used for the measurement of the calibrated diameter of rim in accordance with the methods specified in QC/T 726. b) The diameter (perimeter) of MT-type slopping-bottom-style bead seat rim, DT-type open-style bead seat rim, and DC-type deep-groove-style bead seat rim shall be measured by using the ball tape used for the measurement of the calibrated diameter of rim in accordance with the methods specified in QC/T 725. 5.1.2 Measurement method of the width of rim. USE the vernier caliper to measure the width. 5.2 Inspection of the materials used to forge hub 5.2.1 The internal quality of forged part shall be inspected in accordance with the test methods specified in GB/T 9438. 5.2.2 The mechanical performance of materials is inspected in accordance with the test methods specified in GB/T 228. 5.2.3 The chemical components of the materials of forged part shall be inspected in Figure 7 Diagram of Radial Load Fatigue Test Machine 5.7.2.2 Test conditions. a) Radial load. Radial load Q is determined by formula (5). Q = Sr × Fv ... (5) Where. Q — Radial load, N; Sr — Intensified test coefficient, 2.25; Fv — Refer to the definition in 5.7.1.2 c). b) Tire pressure. the pressure of tire used in test is the pressure corresponding to the maximum design load, kPa; deviation is ±10 kPa; c) Radial load fluctuation tolerance. the load fluctuation tolerance during test is ±5%; d) Tire breakdown. In case of tire breakdown, test shall be continued after tire is replaced. 5.7.2.3 Test method. Tire shall be installed on the test machine in the same way as it is installed on the vehicle (refer to Figure 7). Tire is inflated in accordance with the method in 5.7.2.2 b). Then APPLY the radial load Q according to the calculated value of Formula (5); at the same time, DRIVE the drum to rotate and then conduct test. All the loads shall be on the connecting line between the center of wheel and the center of drum. 5.7.2.4 CHECK cracks after test is done. For the inspection of cracks, ADOPT visual inspection method, dye penetration method, penetration flaw detector, or X-ray fault detector to inspect cracks. 5.7.3 Torsion fatigue test. 5.7.3.1 Test machine. Test machine shall be able to apply reciprocating torque between hub and rim, as shown in Figure 8. 6.1.2 Exit-factory inspection shall be conducted in accordance with the double sampling plan as specified in GB/T 2828.1. Acceptable quality level (AQL) is 4.0 and inspection level (IL) is Class I. 6.1.3 The test items of exit-factory inspection are. a) Dimension of rim; b) General requirements on hub (except the tension to destroy hub spoke hole); c) Tightening torque of spoke nut; d) Assembly quality examined in accordance with Article 4.5; e) Appearance quality; f) Air tightness. 6.2 Type inspection 6.2.1 In case of... ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of QC/T 818-2009 be delivered?

Answer: The full copy PDF of English version of QC/T 818-2009 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of QC/T 818-2009_English with my colleagues?

Answer: Yes. The purchased PDF of QC/T 818-2009_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- QC/T 818-2009 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of QC/T 818-2009?

A step-by-step guide to download PDF of QC/T 818-2009_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "QC/T 818-2009".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9