NB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
NB/T 31073-2015English730 Add to Cart 0-9 seconds. Auto-delivery Occupational safety and health acceptance specification for wind power projects Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: NB/T 31073-2015
      

Similar standards

NB 31089   GB/T 50293   NB/T 11654   

NB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/NBT31073-2015
NB ENERGY INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.180 P 61 Filing No.. J2040-2015 P NB/T 31073-2015 Occupational safety and health acceptance specification for wind power projects Issued on. APRIL 02, 2015 Implemented on. SEPTEMBER 01, 2015 Issued by. National Energy Administration ENERGY INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Occupational safety and health acceptance specification for wind power projects Main drafting organization. General Institute of Hydropower and Water Conservancy Planning and Design Approval department. National Energy Administration Effective date. September 1, 2015 China Electric Power Press 2015 Beijing

Table of Contents

Foreword... 6 1 General provisions... 7 2 Terms... 8 3 Acceptance conditions... 9 4 Acceptance procedure... 10 5 Main contents of acceptance... 15 6 Compilation requirement and content of acceptance file... 17 Appendix A Acceptance procedure... 19 Appendix B Application form of acceptance (Format)... 20 Appendix C Main contents of acceptance outline process... 22 Appendix D Acceptance certification... 24 Appendix E Acceptance test report format... 26 Appendix F Design of self-reporting requirements and main contents... 29 Appendix G Main contents of construction and operation of self-inspection report... 31 Appendix H Main contents of construction installation of self-inspection report ... 32 Appendix J Main contents of construction and operation of self-inspection report ... 33 Explanation of wording in this specification... 36 List of normative references... 37 Additions. explanation of provisions... 38

1 General provisions

1.0.1 In order to standardize and guide the special completion acceptance of labor safety and industrial hygiene of wind farm projects, this Specification is hereby formulated, in accordance with national laws, regulations, rules, standards, other requirements. 1.0.2 This Specification is applicable to the special completion acceptance of labor safety and industrial hygiene of newly built, rebuilt and expanded grid- connected onshore wind farm projects and offshore wind farm projects. 1.0.3 The scope of the special completion inspection and acceptance of the labor safety and industrial hygiene of the wind farm project, includes the safety protection facilities of the wind turbines involved in the wind farm project and the supporting voltage boosting equipment, current collection lines, booster stations, other auxiliary facilities of the wind farm. 1.0.4 The special completion acceptance of the labor safety and industrial hygiene, of the wind farm project, is divided into three stages. application for acceptance and data pre-review, on-site inspection and joint review, review and acceptance. 1.0.5 For the special completion acceptance of the labor safety and industrial hygiene, of the wind farm project, the acceptance committee, which is composed of the presiding organization for acceptance and the safety supervision department where the project is located, shall carry out the acceptance work. 1.0.6 The project owner shall report the use of engineering safety facilities and major engineering incidents (accidents), to the presiding organization of acceptance, within 2 years, after the special completion acceptance of the labor safety and industrial hygiene. 1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind farm projects, shall not only comply with this Specification, but also comply with the current relevant national standards.

2 Terms

2.0.1 Occupational safety and health The field of work, which is aimed at ensuring the safety and health of employees, in the course of professional activities, AND the corresponding measures, which are taken in terms of law, technology, equipment, organizational systems, education. Synonyms. occupational safety and health, labor safety and health, labor safety and occupational health, labor protection. 2.0.3 Regime of three concurrences Engineering safety facilities must be designed, constructed, put into production and use, at the same time as the main project, which is shortly referred to as "regime of three concurrences".

3 Acceptance conditions

3.0.1 The civil works, within the acceptance range, have been completed AND put into use, in accordance with the approved documents. The main part of the project has been completed and passed the fire protection inspection. It has been two months, since all the mechanical and electrical equipment has been put into operation. 3.0.2 When the project is constructed in phases, each phase of the project is completed and passed the fire protection inspection and acceptance. 3.0.4 The documents and materials, which are related to the acceptance, are complete.

4 Acceptance procedure

4.1 Organization of acceptance 4.1.1 The acceptance presiding organization is responsible for organizing the completion acceptance of the labor safety and industrial hygiene. 4.1.2 The acceptance committee is composed of the chairman, vice-chairmen, members. The chairman of the acceptance committee is generally assumed by the representative of the acceptance presiding organization; 4.2 Application acceptance 4.2.1 When the project has the completion acceptance conditions for labor safety and industrial hygiene, the project owner shall submit the completion acceptance application for labor safety and industrial hygiene, to the acceptance presiding organization, according to the acceptance procedures (see Appendix A); meanwhile submit the following documents and materials, with one copy of the electronic version (CD-ROM) attached. 4.4 On-site inspection and review 4.4.1 Preparation. 4.5.3 The acceptance committee discussed and formed the completion acceptance certification, for labor safety and industrial hygiene of the wind farm project. 4.5.4 Under any of the following circumstances, the completion acceptance inspection for labor safety and industrial hygiene is unqualified. 4.5.6 After the review and approval of the completion acceptance certification for the labor safety and industrial hygiene of wind farm project, the acceptance presiding organization shall submit it to the safety supervision department of the government; copy to the member units of the acceptance committee.

5 Main contents of acceptance

5.0.1 The on-site inspection of labor safety and industrial hygiene facilities mainly includes the following contents. 5.0.2 The technical review of the engineering safety acceptance evaluation report mainly includes the following contents.

6 Compilation requirement and content of acceptance file

6.0.1 The design self-inspection report, supervision self-inspection report, construction and installation self-inspection report, construction operation self- inspection report of the completion acceptance, for the labor safety and industrial hygiene, shall be prepared by the design, supervision, construction, building operation organizations, respectively. Each organization shall be 6.0.2 The preparation requirements and main contents of the acceptance self- inspection report are as follows. 6.0.4 The preparation of acceptance materials shall be organized by the project owner. The relevant units shall submit them on time, as required. The project owner shall check the completeness and standardization of the submitted acceptance documents. 6.0.5 The acceptance materials include technical documents AND materials for reference. Relevant units shall ensure the authenticity of the materials submitted by them; assume corresponding responsibilities. NB/T 31073-2015 NB ENERGY INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 27.180 P 61 Filing No.. J2040-2015 P NB/T 31073-2015 Occupational safety and health acceptance specification for wind power projects Issued on. APRIL 02, 2015 Implemented on. SEPTEMBER 01, 2015 Issued by. National Energy Administration ENERGY INDUSTRY STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA Occupational safety and health acceptance specification for wind power projects Main drafting organization. General Institute of Hydropower and Water Conservancy Planning and Design Approval department. National Energy Administration Effective date. September 1, 2015 China Electric Power Press 2015 Beijing

Table of Contents

Foreword... 6 1 General provisions... 7 2 Terms... 8 3 Acceptance conditions... 9 4 Acceptance procedure... 10 5 Main contents of acceptance... 15 6 Compilation requirement and content of acceptance file... 17 Appendix A Acceptance procedure... 19 Appendix B Application form of acceptance (Format)... 20 Appendix C Main contents of acceptance outline process... 22 Appendix D Acceptance certification... 24 Appendix E Acceptance test report format... 26 Appendix F Design of self-reporting requirements and main contents... 29 Appendix G Main contents of construction and operation of self-inspection report... 31 Appendix H Main contents of construction installation of self-inspection report ... 32 Appendix J Main contents of construction and operation of self-inspection report ... 33 Explanation of wording in this specification... 36 List of normative references... 37 Additions. explanation of provisions... 38

1 General provisions

1.0.1 In order to standardize and guide the special completion acceptance of labor safety and industrial hygiene of wind farm projects, this Specification is hereby formulated, in accordance with national laws, regulations, rules, standards, other requirements. 1.0.2 This Specification is applicable to the special completion acceptance of labor safety and industrial hygiene of newly built, rebuilt and expanded grid- connected onshore wind farm projects and offshore wind farm projects. 1.0.3 The scope of the special completion inspection and acceptance of the labor safety and industrial hygiene of the wind farm project, includes the safety protection facilities of the wind turbines involved in the wind farm project and the supporting voltage boosting equipment, current collection lines, booster stations, other auxiliary facilities of the wind farm. 1.0.4 The special completion acceptance of the labor safety and industrial hygiene, of the wind farm project, is divided into three stages. application for acceptance and data pre-review, on-site inspection and joint review, review and acceptance. 1.0.5 For the special completion acceptance of the labor safety and industrial hygiene, of the wind farm project, the acceptance committee, which is composed of the presiding organization for acceptance and the safety supervision department where the project is located, shall carry out the acceptance work. 1.0.6 The project owner shall report the use of engineering safety facilities and major engineering incidents (accidents), to the presiding organization of acceptance, within 2 years, after the special completion acceptance of the labor safety and industrial hygiene. 1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind farm projects, shall not only comply with this Specification, but also comply with the current relevant national standards.

2 Terms

2.0.1 Occupational safety and health The field of work, which is aimed at ensuring the safety and health of employees, in the course of professional activities, AND the corresponding measures, which are taken in terms of law, technology, equipment, organizational systems, education. Synonyms. occupational safety and health, labor safety and health, labor safety and occupational health, labor protection. 2.0.3 Regime of three concurrences Engineering safety facilities must be designed, constructed, put into production and use, at the same time as the main project, which is shortly referred to as "regime of three concurrences".

3 Acceptance conditions

3.0.1 The civil works, within the acceptance range, have been completed AND put into use, in accordance with the approved documents. The main part of the project has been completed and passed the fire protection inspection. It has been two months, since all the mechanical and electrical equipment has been put into operation. 3.0.2 When the project is constructed in phases, each phase of the project is completed and passed the fire protection inspection and acceptance. 3.0.4 The documents and materials, which are related to the acceptance, are complete.

4 Acceptance procedure

4.1 Organization of acceptance 4.1.1 The acceptance presiding organization is responsible for organizing the completion acceptance of the labor safety and industrial hygiene. 4.1.2 The acceptance committee is composed of the chairman, vice-chairmen, members. The chairman of the acceptance committee is generally assumed by the representative of the acceptance presiding organization; 4.2 Application acceptance 4.2.1 When the project has the completion acceptance conditions for labor safety and industrial hygiene, the project owner shall submit the completion acceptance application for labor safety and industrial hygiene, to the acceptance presiding organization, according to the acceptance procedures (see Appendix A); meanwhile submit the following documents and materials, with one copy of the electronic version (CD-ROM) attached. 4.4 On-site inspection and review 4.4.1 Preparation. 4.5.3 The acceptance committee discussed and formed the completion acceptance certification, for labor safety and industrial hygiene of the wind farm project. 4.5.4 Under any of the following circumstances, the completion acceptance inspection for labor safety and industrial hygiene is unqualified. 4.5.6 After the review and approval of the completion acceptance certification for the labor safety and industrial hygiene of wind farm project, the acceptance presiding organization shall submit it to the safety supervision department of the government; copy to the member units of the acceptance committee.

5 Main contents of acceptance

5.0.1 The on-site inspection of labor safety and industrial hygiene facilities mainly includes the following contents. 5.0.2 The technical review of the engineering safety acceptance evaluation report mainly includes the following contents.

6 Compilation requirement and content of acceptance file

6.0.1 The design self-inspection report, supervision self-inspection report, construction and installation self-inspection report, construction operation self- inspection report of the completion acceptance, for the labor safety and industrial hygiene, shall be prepared by the design, supervision, construction, building operation organizations, respectively. Each organization shall be 6.0.2 The preparation requirements and main contents of the acceptance self- inspection report are as follows. 6.0.4 The preparation of acceptance materials shall be organized by the project owner. The relevant units shall submit them on time, as required. The project owner shall check the completeness and standardization of the submitted acceptance documents. 6.0.5 The acceptance materials include technical documents AND materials for reference. Relevant units shall ensure the authenticity of the materials submitted by them; assume corresponding responsibilities. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of NB/T 31073-2015 be delivered?

Answer: The full copy PDF of English version of NB/T 31073-2015 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of NB/T 31073-2015_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 31073-2015_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- NB/T 31073-2015 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of NB/T 31073-2015?

A step-by-step guide to download PDF of NB/T 31073-2015_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "NB/T 31073-2015".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9