NB/T 31073-2015 PDF English
US$730.00 · In stock · Download in 9 secondsNB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
NB/T 31073-2015 | English | 730 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Occupational safety and health acceptance specification for wind power projects
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: NB/T 31073-2015
NB/T 31073-2015: Occupational safety and health acceptance specification for wind power projects---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/NBT31073-2015
NB
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
P 61
Filing No.. J2040-2015
P NB/T 31073-2015
Occupational safety and health acceptance
specification for wind power projects
Issued on. APRIL 02, 2015
Implemented on. SEPTEMBER 01, 2015
Issued by. National Energy Administration
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
Occupational safety and health acceptance
specification for wind power projects
Main drafting organization. General Institute of Hydropower and Water
Conservancy Planning and Design
Approval department. National Energy Administration
Effective date. September 1, 2015
China Electric Power Press
2015 Beijing
Table of Contents
Foreword... 6
1 General provisions... 7
2 Terms... 8
3 Acceptance conditions... 9
4 Acceptance procedure... 10
5 Main contents of acceptance... 15
6 Compilation requirement and content of acceptance file... 17
Appendix A Acceptance procedure... 19
Appendix B Application form of acceptance (Format)... 20
Appendix C Main contents of acceptance outline process... 22
Appendix D Acceptance certification... 24
Appendix E Acceptance test report format... 26
Appendix F Design of self-reporting requirements and main contents... 29
Appendix G Main contents of construction and operation of self-inspection
report... 31
Appendix H Main contents of construction installation of self-inspection report
... 32
Appendix J Main contents of construction and operation of self-inspection report
... 33
Explanation of wording in this specification... 36
List of normative references... 37
Additions. explanation of provisions... 38
1 General provisions
1.0.1 In order to standardize and guide the special completion acceptance of
labor safety and industrial hygiene of wind farm projects, this Specification is
hereby formulated, in accordance with national laws, regulations, rules,
standards, other requirements.
1.0.2 This Specification is applicable to the special completion acceptance of
labor safety and industrial hygiene of newly built, rebuilt and expanded grid-
connected onshore wind farm projects and offshore wind farm projects.
1.0.3 The scope of the special completion inspection and acceptance of the
labor safety and industrial hygiene of the wind farm project, includes the safety
protection facilities of the wind turbines involved in the wind farm project and
the supporting voltage boosting equipment, current collection lines, booster
stations, other auxiliary facilities of the wind farm.
1.0.4 The special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, is divided into three stages. application for
acceptance and data pre-review, on-site inspection and joint review, review and
acceptance.
1.0.5 For the special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, the acceptance committee, which is
composed of the presiding organization for acceptance and the safety
supervision department where the project is located, shall carry out the
acceptance work.
1.0.6 The project owner shall report the use of engineering safety facilities and
major engineering incidents (accidents), to the presiding organization of
acceptance, within 2 years, after the special completion acceptance of the labor
safety and industrial hygiene.
1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind
farm projects, shall not only comply with this Specification, but also comply with
the current relevant national standards.
2 Terms
2.0.1 Occupational safety and health
The field of work, which is aimed at ensuring the safety and health of employees,
in the course of professional activities, AND the corresponding measures, which
are taken in terms of law, technology, equipment, organizational systems,
education. Synonyms. occupational safety and health, labor safety and health,
labor safety and occupational health, labor protection.
2.0.3 Regime of three concurrences
Engineering safety facilities must be designed, constructed, put into production
and use, at the same time as the main project, which is shortly referred to as
"regime of three concurrences".
3 Acceptance conditions
3.0.1 The civil works, within the acceptance range, have been completed AND
put into use, in accordance with the approved documents. The main part of the
project has been completed and passed the fire protection inspection. It has
been two months, since all the mechanical and electrical equipment has been
put into operation.
3.0.2 When the project is constructed in phases, each phase of the project is
completed and passed the fire protection inspection and acceptance.
3.0.4 The documents and materials, which are related to the acceptance, are
complete.
4 Acceptance procedure
4.1 Organization of acceptance
4.1.1 The acceptance presiding organization is responsible for organizing the
completion acceptance of the labor safety and industrial hygiene.
4.1.2 The acceptance committee is composed of the chairman, vice-chairmen,
members. The chairman of the acceptance committee is generally assumed by
the representative of the acceptance presiding organization;
4.2 Application acceptance
4.2.1 When the project has the completion acceptance conditions for labor
safety and industrial hygiene, the project owner shall submit the completion
acceptance application for labor safety and industrial hygiene, to the
acceptance presiding organization, according to the acceptance procedures
(see Appendix A); meanwhile submit the following documents and materials,
with one copy of the electronic version (CD-ROM) attached.
4.4 On-site inspection and review
4.4.1 Preparation.
4.5.3 The acceptance committee discussed and formed the completion
acceptance certification, for labor safety and industrial hygiene of the wind farm
project.
4.5.4 Under any of the following circumstances, the completion acceptance
inspection for labor safety and industrial hygiene is unqualified.
4.5.6 After the review and approval of the completion acceptance certification
for the labor safety and industrial hygiene of wind farm project, the acceptance
presiding organization shall submit it to the safety supervision department of
the government; copy to the member units of the acceptance committee.
5 Main contents of acceptance
5.0.1 The on-site inspection of labor safety and industrial hygiene facilities
mainly includes the following contents.
5.0.2 The technical review of the engineering safety acceptance evaluation
report mainly includes the following contents.
6 Compilation requirement and content of acceptance file
6.0.1 The design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, construction operation self-
inspection report of the completion acceptance, for the labor safety and
industrial hygiene, shall be prepared by the design, supervision, construction,
building operation organizations, respectively. Each organization shall be
6.0.2 The preparation requirements and main contents of the acceptance self-
inspection report are as follows.
6.0.4 The preparation of acceptance materials shall be organized by the project
owner. The relevant units shall submit them on time, as required. The project
owner shall check the completeness and standardization of the submitted
acceptance documents.
6.0.5 The acceptance materials include technical documents AND materials for
reference. Relevant units shall ensure the authenticity of the materials
submitted by them; assume corresponding responsibilities.
NB/T 31073-2015
NB
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
P 61
Filing No.. J2040-2015
P NB/T 31073-2015
Occupational safety and health acceptance
specification for wind power projects
Issued on. APRIL 02, 2015
Implemented on. SEPTEMBER 01, 2015
Issued by. National Energy Administration
ENERGY INDUSTRY STANDARD OF
THE PEOPLE’S REPUBLIC OF CHINA
Occupational safety and health acceptance
specification for wind power projects
Main drafting organization. General Institute of Hydropower and Water
Conservancy Planning and Design
Approval department. National Energy Administration
Effective date. September 1, 2015
China Electric Power Press
2015 Beijing
Table of Contents
Foreword... 6
1 General provisions... 7
2 Terms... 8
3 Acceptance conditions... 9
4 Acceptance procedure... 10
5 Main contents of acceptance... 15
6 Compilation requirement and content of acceptance file... 17
Appendix A Acceptance procedure... 19
Appendix B Application form of acceptance (Format)... 20
Appendix C Main contents of acceptance outline process... 22
Appendix D Acceptance certification... 24
Appendix E Acceptance test report format... 26
Appendix F Design of self-reporting requirements and main contents... 29
Appendix G Main contents of construction and operation of self-inspection
report... 31
Appendix H Main contents of construction installation of self-inspection report
... 32
Appendix J Main contents of construction and operation of self-inspection report
... 33
Explanation of wording in this specification... 36
List of normative references... 37
Additions. explanation of provisions... 38
1 General provisions
1.0.1 In order to standardize and guide the special completion acceptance of
labor safety and industrial hygiene of wind farm projects, this Specification is
hereby formulated, in accordance with national laws, regulations, rules,
standards, other requirements.
1.0.2 This Specification is applicable to the special completion acceptance of
labor safety and industrial hygiene of newly built, rebuilt and expanded grid-
connected onshore wind farm projects and offshore wind farm projects.
1.0.3 The scope of the special completion inspection and acceptance of the
labor safety and industrial hygiene of the wind farm project, includes the safety
protection facilities of the wind turbines involved in the wind farm project and
the supporting voltage boosting equipment, current collection lines, booster
stations, other auxiliary facilities of the wind farm.
1.0.4 The special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, is divided into three stages. application for
acceptance and data pre-review, on-site inspection and joint review, review and
acceptance.
1.0.5 For the special completion acceptance of the labor safety and industrial
hygiene, of the wind farm project, the acceptance committee, which is
composed of the presiding organization for acceptance and the safety
supervision department where the project is located, shall carry out the
acceptance work.
1.0.6 The project owner shall report the use of engineering safety facilities and
major engineering incidents (accidents), to the presiding organization of
acceptance, within 2 years, after the special completion acceptance of the labor
safety and industrial hygiene.
1.0.7 The inspection acceptance of labor safety and industrial hygiene, of wind
farm projects, shall not only comply with this Specification, but also comply with
the current relevant national standards.
2 Terms
2.0.1 Occupational safety and health
The field of work, which is aimed at ensuring the safety and health of employees,
in the course of professional activities, AND the corresponding measures, which
are taken in terms of law, technology, equipment, organizational systems,
education. Synonyms. occupational safety and health, labor safety and health,
labor safety and occupational health, labor protection.
2.0.3 Regime of three concurrences
Engineering safety facilities must be designed, constructed, put into production
and use, at the same time as the main project, which is shortly referred to as
"regime of three concurrences".
3 Acceptance conditions
3.0.1 The civil works, within the acceptance range, have been completed AND
put into use, in accordance with the approved documents. The main part of the
project has been completed and passed the fire protection inspection. It has
been two months, since all the mechanical and electrical equipment has been
put into operation.
3.0.2 When the project is constructed in phases, each phase of the project is
completed and passed the fire protection inspection and acceptance.
3.0.4 The documents and materials, which are related to the acceptance, are
complete.
4 Acceptance procedure
4.1 Organization of acceptance
4.1.1 The acceptance presiding organization is responsible for organizing the
completion acceptance of the labor safety and industrial hygiene.
4.1.2 The acceptance committee is composed of the chairman, vice-chairmen,
members. The chairman of the acceptance committee is generally assumed by
the representative of the acceptance presiding organization;
4.2 Application acceptance
4.2.1 When the project has the completion acceptance conditions for labor
safety and industrial hygiene, the project owner shall submit the completion
acceptance application for labor safety and industrial hygiene, to the
acceptance presiding organization, according to the acceptance procedures
(see Appendix A); meanwhile submit the following documents and materials,
with one copy of the electronic version (CD-ROM) attached.
4.4 On-site inspection and review
4.4.1 Preparation.
4.5.3 The acceptance committee discussed and formed the completion
acceptance certification, for labor safety and industrial hygiene of the wind farm
project.
4.5.4 Under any of the following circumstances, the completion acceptance
inspection for labor safety and industrial hygiene is unqualified.
4.5.6 After the review and approval of the completion acceptance certification
for the labor safety and industrial hygiene of wind farm project, the acceptance
presiding organization shall submit it to the safety supervision department of
the government; copy to the member units of the acceptance committee.
5 Main contents of acceptance
5.0.1 The on-site inspection of labor safety and industrial hygiene facilities
mainly includes the following contents.
5.0.2 The technical review of the engineering safety acceptance evaluation
report mainly includes the following contents.
6 Compilation requirement and content of acceptance file
6.0.1 The design self-inspection report, supervision self-inspection report,
construction and installation self-inspection report, construction operation self-
inspection report of the completion acceptance, for the labor safety and
industrial hygiene, shall be prepared by the design, supervision, construction,
building operation organizations, respectively. Each organization shall be
6.0.2 The preparation requirements and main contents of the acceptance self-
inspection report are as follows.
6.0.4 The preparation of acceptance materials shall be organized by the project
owner. The relevant units shall submit them on time, as required. The project
owner shall check the completeness and standardization of the submitted
acceptance documents.
6.0.5 The acceptance materials include technical documents AND materials for
reference. Relevant units shall ensure the authenticity of the materials
submitted by them; assume corresponding responsibilities.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of NB/T 31073-2015 be delivered?Answer: The full copy PDF of English version of NB/T 31073-2015 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of NB/T 31073-2015_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 31073-2015_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- NB/T 31073-2015 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of NB/T 31073-2015?A step-by-step guide to download PDF of NB/T 31073-2015_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "NB/T 31073-2015". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|