GB/T 29838-2013 PDF English
US$145.00 · In stock · Download in 9 secondsGB/T 29838-2013: Fuel cell modules Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 29838-2013 | English | 145 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Fuel cell modules
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 29838-2013
GB/T 29838-2013: Fuel cell modules---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT29838-2013
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 27.070
F 19
Fuel cell modules
(IEC 62282-2.2012, MOD)
Issued on. NOVEMBER 12, 2013
Implemented on. MARCH 7, 2014
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine;
Standardization Administration Committee.
Table of Contents
Foreword... 3
1 Scope... 4
2 Normative references... 5
3 Terms and definitions... 6
4 Requirements... 10
5 Type tests... 19
6 Routine tests... 30
7 Markings and instructions... 31
Annex A (informative) Additional information for the performance and evaluation
of the tests... 37
Bibliography... 45
Foreword
This Standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This Standard uses redrafting method to modify and adopt IEC 62282-2
Ed.2.2012 "Fuel cell technologies Part 2.Fuel cell modules".
This Standard is technically consistent with IEC 62282-2.2012.The
modifications are as follows.
- deleted the foreword and introduction of IEC 62282-2.2012, added the
foreword of this Standard;
- for the normative references, all Chinese standards that correspond to
IEC (or ISO) standards are replaced by Chinese standards;
- the safety standard in this Standard incorporated Chinese specific safety
requirements, added "5.10 Insulation (static) test" in Clause 5 "Type tests".
This Standard was proposed by China Electrical Appliance Industry Association.
This Standard shall be under the jurisdiction of National Technical Committee
on Fuel Cell and Flow Battery of Standardization Administration of China
(SAC/TC 342).
The drafting organizations of this Standard. Xinyuan Power Co., Ltd.,
Machinery Industry Beijing Institute of Electrotechnics and Economics,
Shanghai Shenli Technology Co., Ltd., Wuhan Yintai Technology Fuel Cell Co.,
Ltd., Ningbo Baite Measurement & Control Technology Co., Ltd., Wuhan
University of Technology, Dalian Institute of Chemical Physics, Chinese
Academy of Sciences, Shanghai Panye Hydrogen Energy Technology Co., Ltd.,
Tsinghua University, Tongji University, Kunshan Institute of Innovation, Nanjing
University, Shenzhen Huachen Detection Technology Co., Ltd., etc.
Main drafters of this Standard. Hou Zhongjun, Li Xiaonan, Tian Chaohe, Zhang
Ruogu, Qi Zhigang, Huang Ping, Yan Xiqiang, Chen Chen, Pan Mu, Yi Baolian,
Dong Hui, Hou Ming, Pei Pucheng, Hou Yongping, Lu Chenyu, Gu Jun, Zhu
Ping, etc.
Fuel cell modules
1 Scope
This Standard provides the minimum requirements for safety and performance
of fuel cell modules and applies to fuel cell modules with the following electrolyte
chemistry.
2 Normative references
The following referenced documents are indispensable for the application of
this document. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any
amendments) applies.
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
(related to cells/stacks) preliminary step that is required to properly operate a
fuel cell module (3.8) and that is realized following a protocol specified by the
manufacturer
assembly incorporating one or more fuel cell stacks and other main and, if
applicable, additional components, which is intended to be integrated into a
power system
4 Requirements
The fuel cell module shall be designed in accordance with a risk assessment
performed by the fuel cell module manufacturer. All parts shall be
The fuel cell module shall be designed in such a way that it withstands all
normal operating conditions as defined by the manufacturer’s specification
without any damage. Abnormal operating conditions shall be covered according
to 4.1.
5 Type tests
The fuel cell module shall be subject to the shock and vibration test limits stated
in the manufacturer’s documentation.
This test is only applicable for enclosed systems, with integrated safety
ventilation and purging processes, where the operating temperature is below
the auto-ignition temperature of the combustible gas.
6 Routine tests
Dielectric strength tests shall be performed on all production units after
assembly.
Dielectric strength tests shall be performed as described in 5.9 with a test
duration of 1 s at a normal temperature.
7 Markings and instructions
If connections can be interchanged and result in unsafe conditions, they shall
be identified. Polarity of the electrical connections and grounding, if applicable,
shall be indicated.
The information necessary for system integration, installation, operation and
maintenance of the fuel cell module shall be supplied in the form of drawings,
diagrams, charts, tables and instructions.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 29838-2013 be delivered?Answer: The full copy PDF of English version of GB/T 29838-2013 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 29838-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29838-2013_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 29838-2013 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB/T 29838-2013?A step-by-step guide to download PDF of GB/T 29838-2013_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 29838-2013". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|