GB/T 29516-2013_English: PDF (GB/T29516-2013)
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 29516-2013 | English | 130 |
Add to Cart
|
0--9 seconds. Auto-delivery
|
Manganese ores -- Determination of moisture content
| Valid |
GB/T 29516-2013
|
Standard ID | GB/T 29516-2013 (GB/T29516-2013) | Description (Translated English) | Manganese ores. Determination of moisture content | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | D32 | Classification of International Standard | 73.060.20 | Word Count Estimation | 11,134 | Quoted Standard | GB/T 2011 | Adopted Standard | ISO 4299-1989, MOD | Drafting Organization | Ningbo Inspection and Quarantine Science and Technology Research Institute | Administrative Organization | National Standardization Technical Committee of pig iron and ferroalloys | Regulation (derived from) | National Standards Bulletin 2013 No. 6 | Proposing organization | China Iron and Steel Association | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the manganese ore moisture content determination. This standard applies to natural manganese ore and manganese ore by processing (including flotation or pellets) for moisture determination. |
GB/T 29516-2013
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 73.060.20
D 32
Manganese ores - Determination of moisture content
(ISO 4299:1989, MOD)
ISSUED ON: MAY 09, 2013
IMPLEMENTED ON: FEBRUARY 01, 2014
Issued by: General Administration of Quality Supervision, Inspection and
Quarantine;
Standardization Administration of the People's Republic of
China.
Table of Contents
Foreword ... 3
1 Scope ... 4
2 Normative references ... 4
3 Terms and definitions ... 4
4 Method summary ... 5
5 Instruments and equipment ... 5
6 Sample and sample preparation ... 6
7 Steps ... 6
8 Calculation and result expression ... 7
9 Precision ... 9
10 Test report ... 9
Annex A (normative) Test method for moisture content of sticky manganese 10
Annex B (normative) Calibration of sprayed water and/or rain ... 12
Manganese ores - Determination of moisture content
WARNING -- The personnel who uses this Standard shall have practical
experience in formal laboratory work. This Standard does not point out all
possible security issues. It is the user's responsibility to take appropriate
safety and health measures and ensure compliance with the conditions
set by the relevant national regulations.
1 Scope
This Standard specifies the determination method of moisture content of
manganese ores.
This Standard is applicable to the determination of moisture content of natural
manganese ores and processed manganese ores (including flotation or pellets).
2 Normative references
The following referenced documents are indispensable for the application of
this document. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any
amendments) applies.
GB/T 2011, Method of sampling and sample preparation of manganese ores
in bulk
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
3.1 lot
A certain amount of manganese ores that are processed or produced under the
same conditions.
3.2 consignment
A certain amount of manganese ores in one delivery. A consignment may
consist of a lot, several lots or partial lots of manganese ores.
3.3 increment
7.2.3 Place the drying plan into the drying oven that has been pre-adjusted to
105°C. Dry at this temperature for not less than 4h.
7.2.4 Take out the drying pan. Immediately weigh. The weighing device shall
use thermal insulation material to prevent the heat transfer of material.
7.2.5 Place the drying pan into the drying oven once again. Maintain 1h. Take
it out to weigh and record.
7.2.6 Repeat the above steps till the weight is constant, that is, the difference
between the two-weighings is less than 0.05% of the initial mass. After the
repeated drying, the mass shall increase and the last weighing data before the
last testing shall be used as the calculation data.
7.2.7 For the samples that are difficult to sieve, break, and divide due to
excessive humidity or stickiness, it may pre-dry the sample till there is no
difficulty in sample preparation (see Annex A).
7.2.8 The calibration of sprayed water and/or rain is conducted according to
Annex B.
8 Calculation and result expression
8.1 Calculation of moisture content of test portion
The moisture content wi is calculated according to formula (1), expressed in
mass fraction (%). The result is expressed to two digits after the decimal place:
Where,
m1 - Initial mass of test portion, in grams (g);
m2 - Dried mass of test portion, in grams (g).
8.2 Calculation of moisture content of consignment
8.2.1 When moisture is determined by gross sample, the moisture content of
consignment shall be calculated according to formula (2). The result is
expressed to one digit after the decimal place:
Annex A
(normative)
Test method for moisture content of sticky manganese
When the sample is difficult to sieve, break or divide due to excessive humidity
or stickiness, it may perform pre-drying. In such a situation, it shall conduct the
moisture test according to the following pre-drying methods.
A.1 Weigh the initial mass of the test sample.
A.2 Tile the test sample to the uniform thickness. Place it in the air or place it in
a drying oven of which the temperature is not greater than 105°C. The drying
temperature and time shall not cause the sample to reabsorb moisture in the
subsequent operations.
A.3 Weigh the dried manganese ore once again.
A.4 According to formula (A.1), calculate the pre-drying moisture content of the
test sample wp (%):
Where,
- Test sample mass before pre-drying, in kilograms (kg);
- Test sample mass after pre-drying, in kilograms (kg).
A.5 Record the pre-drying moisture content to the second digit after the decimal
place.
A.6 Prepare test portion from the pre-drying samples according to Clause 6.
A.7 Measure the weight loss of test portion. According to the method described
in Clause 7, then according to sub-clause 8.1, calculate the moisture content of
test portion (mass fraction).
A.8 According to formula (A.2), calculate the total moisture content, wpd (%):
Annex B
(normative)
Calibration of sprayed water and/or rain
B.1 Introduction
To prevent dust from polluting the environment, it needs to spray water on the
ores during loading-unloading. Therefore, the moisture content of the
consignment shall be calibrated according to the mass of sprayed water. The
calibration procedures are in accordance with the provisions of this Annex.
This Annex is also applicable to the moisture content calibration of the
consignment of manganese ores that are exposed in rain.
B.2 General rules
B.2.1 Sprayed water due to the following reasons:
a) The environmental regulations of loading/unloading ports have
requirements for dust;
b) It is more convenient to spray water for reasons such as minerals, weather,
or disposal equipment.
B.2.2 When the rain has a considerable effect on the moisture content of the
consignment, it shall consider the rain calibration. But the corrected coefficient
shall be agreed with the relevant stakeholders.
B.3 Calibration of sprayed water
B.3.1 Sprayed water
Sprayed water refers to the water that is added between the moisture
determination and the determination of total mass of cargo.
B.3.2 Determination of sprayed water mass
It may use a flowmeter of which the accuracy is ±5% to determine the sprayed
water mass. Multiply the determined volume by the density of the sprayed water
and convert it to the mass m3 that is represented in t.
NOTE: The density of fresh water is assumed to be 1t/m3.
B.3.3 Mass of consignment
B.4.2 Effective area exposed to rain
The effective area exposed to rain shall be calculated according to the
provisions of B.4.2.1~B.4.2.3 and rounded off to square meters.
B.4.2.1 Cargo compartment
The area calculation of cargo compartment exposed to rain shall be based on
the cargo ship plan view provided by the ship owner.
B.4.2.2 Feed bin
The area calculation of feed bin exposed to rain shall be based on the feed bin
plan view.
B.4.2.3 Belt transport
During belt transport, the calculation of the area exposed to rain shall multiply
the effective width of the belt by the length of the exposed rain, that is, the
distance from the container to the sampling point when the cargos are
transported.
B.4.3 Rainfall duration
If the vessel uses a water gauge to weigh, the rainfall duration shall be from the
beginning of the water gauge identification to the end of sampling.
B.4.4 Measurement method of rainwater
The measurement of rainwater shall use a certified rain gauge. During
measurement, place it near the loading-unloading ores. The rainfall is
expressed in millimeters (mm).
B.4.5 Mass of rain
The mass of rain is expressed in mR, in tons (t). Use formula (B.3) to calculate
to an integer.
Where,
A - Raining effective area calculated according to B.4.2, in square meters (m2);
R - Rainfall measured according to B.4.4, in millimeters (mm);
ρ - Rain density, in tons per cubic meter (t/m3); usually it is 1t/m3.
......
|