GB/T 27748.4-2017 PDF English
US$700.00 · In stock · Download in 9 secondsGB/T 27748.4-2017: Stationary fuel cell power systems -- Part 4: Performance test methods for small fuel cell power systems Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
GB/T 27748.4-2017 | English | 700 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Stationary fuel cell power systems -- Part 4: Performance test methods for small fuel cell power systems
| Valid |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 27748.4-2017
GB/T 27748.4-2017: Stationary fuel cell power systems -- Part 4: Performance test methods for small fuel cell power systems ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT27748.4-2017
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 27.070
K 82
GB/T 27748.4-2017 / IEC 62282-3-201.2013
Stationary fuel cell power systems - Part 4.
Performance test methods for small fuel cell power
systems
(IEC 62282-3-201.2013 Fuel cell technologies - Part 3-201.Stationary fuel cell power
systems - Performance test methods for small fuel cell power systems, IDT)
Issued on. JULY 12, 2017
Implemented on. FEBRUARY 01, 2018
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine;
Standardization Administration of the People's Republic of
China.
Table of Contents
Foreword... 3
1 Scope... 5
2 Normative references... 6
3 Terms and definitions... 6
4 Symbols... 11
5 Configuration of small stationary fuel cell power system and test boundary15
6 Reference conditions... 16
7 Heating value base... 16
8 Test preparation... 17
9 Test set-up... 18
10 Instruments and measurement methods... 19
11 Test conditions... 24
12 Operating process... 25
13 Test plan... 27
14 Type tests on electric/thermal performance... 27
15 Type tests on environmental performance... 52
16 Test reports... 64
Annex A (informative) Heating values for components of natural gases... 66
Annex D (informative) Typical exhaust gas components... 72
Annex E (informative) Guidelines for the contents of detailed and full reports
... 73
Bibliography... 75
Foreword
GB/T 27748 “Stationary fuel cell power system” is divided into the following 4
parts.
- Part 1.Safety;
- Part 2.Performance test methods;
- Part 3.Installation;
- Part 4.Performance test methods for small fuel cell power systems.
This Part is Part 4 of GB/T 27748.
This Part was drafted in accordance with the rules given in GB/T 1.1-2009.
This Part uses translation method to identically adopts IEC 62282-3-201.2013
“Fuel cell technologies - Part 3-201.Stationary fuel cell power systems -
Performance test methods for small fuel cell power systems”.
The Chinese documents which have consistency with the international
normative reference in this Part are as follows.
- GB/T 1859-2000, Reciprocating internal combustion engines -
Measurement of emitted airborne noise - Engineering method and survey
method (ISO 6798.1995, IDT)
- GB/T 3785.1-2010, Electroacoustics - Sound level meters - Part 1.
Specifications (IEC 61672-1.2002, IDT)
- GB/T 7488-1987, Water quality - Determination of biochemical oxygen
demand after 5 days (BOD5); Dilution and seeding method (ISO
5815.1983, NEQ)
- GB/T 19000-2008, Quality management systems - Fundamentals and
vocabulary (ISO 9000.2005, IDT)
- GB/T 22592-2008, Water treatment reagent - General rules for the
determination of pH (ISO 10523.1994, NEQ)
- GB/T 27748.2-2013, Stationary fuel cell power systems - Part 2.
Performance test methods (IEC 62282-3-200.2011, IDT)
This Part made the following editorial modifications.
- made editorial correction to the symbols in equation (21), equation (22),
equation (32), equation (33), equation (35), equation (36), equation (37)
in IEC 62282-3-201.2013.
This Part was proposed by China Electrical Equipment Industry Association.
This Part shall be under the jurisdiction of National Technical Committee on
Fuel Cell and Flow Battery of Standardization Administration of China (SAC/TC
342).
The drafting organizations of this Part. Shanghai Shenli Technology Co., Ltd.,
Wuhan Zhongyu Power System Technology Co., Ltd., Beijing Institute of
Electrical Technology and Economics of Mechanical Industry, Dalian Institute of
Chemical Physics, Chinese Academy of Sciences, Kunshan Institute of
Innovation, Nanjing University, Shenzhen Institute of Standards and Technology,
Beijing Qunling Energy Technology Co., Ltd., Suzhou UL Meihua Certification
Co., Ltd., Suzhou Forsy Energy Technology Co., Ltd., Xinyuan Power Co., Ltd.,
Aerospace New Long March Electric Vehicle Technology Co., Ltd., Ningbo
Better Measurement & Control Technology Co., Ltd.
Main drafters of this Part. Zhang Ruogu, Hu Shaobo, Qi Zhigang, Lu Chenyu,
Hou Ming, Liu Jianguo, Wang Yiqun, Hu Liqing, Lin Yongqing, Zhou Bin, Yu
Hongmei, Gu Rongxin, Jin Yinshi, Huang Ping, Chen Zhanzhan, Xu Jiazhong,
Ji Liangjun, Wang Renfang, Chen Chen.
Stationary fuel cell power systems - Part 4.
Performance test methods for small fuel cell power
systems
1 Scope
This Part of GB/T 27748 provides test methods for the electric/thermal and
environmental performance of small stationary fuel cell power systems that
meet the following criteria.
2 Normative references
The following referenced documents are indispensable for the application of
this document. For dated references, only the edition cited applies. For undated
references, the latest edition of the referenced document (including any
amendments) applies.
IEC 61672-1, Electroacoustics - Sound level meters - Part 1.Specifications
IEC 62282-3-200, Fuel cell technologies - Part 3-200.Stationary fuel cell
power systems - Performance test methods
3 Terms and definitions
For the purposes of this document, the following terms and definitions apply.
condition of a fuel cell power system at ambient temperature with no power
input or output, ready for start-up
4 Symbols
The symbols and their meanings used in this Part are given in Table 1 for
electric/thermal performance and Table 2 for environmental performance, with
the appropriate units.
5 Configuration of small stationary fuel cell power system and test boundary
Figure 2 illustrates the general configuration of small stationary fuel cell power
systems subject to this standard and shows the test boundary and physical
quantities entering and leaving the fuel cell system.
6 Reference conditions
The reference conditions are specified as follows.
7 Heating value base
The heating value of fuel is based on the lower heating value (LHV) in principle.
In cases where LHV is applied for the calculation of energy efficiency, it is not
necessary to add the symbol "LHV", as shown below.
8 Test preparation
An uncertainty analysis shall be performed on the three test items below to
indicate the reliability of the test results and to comply with customer requests.
The following test results shall be analysed to determine the absolute and
relative uncertainty. A test shall be planned so that the reliability of the results
can be evaluated for the following.
9 Test set-up
Figure 3 illustrates an example of the test set-up that is required to conduct
small stationary fuel cell power system testing with gaseous fuel described in
this standard. An electric load and a thermal load are connected to a fuel cell
power system.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 27748.4-2017 be delivered?Answer: The full copy PDF of English version of GB/T 27748.4-2017 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 27748.4-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 27748.4-2017_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 27748.4-2017 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.
How to buy and download a true PDF of English version of GB/T 27748.4-2017?A step-by-step guide to download PDF of GB/T 27748.4-2017_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 27748.4-2017". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|