US$480.00 · In stock · Download in 9 secondsGB/T 25387.1-2021: Wind turbines generator system - Full-power converter - Part 1: Technical condition Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 25387.1: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 25387.1-2021 | English | 480 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Wind turbines generator system - Full-power converter - Part 1: Technical condition
| Valid |
| GB/T 25387.1-2010 | English | 599 |
Add to Cart
|
3 days
|
Full-power converter of wind turbine generator systems -- Part 1: Technical condition
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 25387.1-2021
GB/T 25387.1-2021: Wind turbines generator system - Full-power converter - Part 1: Technical condition ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT25387.1-2021
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 27.180
F 11
Replacing GB/T 25387.1-2010
Wind Turbines Generator System - Full-power Converter -
Part 1.Technical Condition
Issued on. MARCH 9, 2021
Implemented on. OCTOBER 1, 2021
Issued by. State Administration for Market Regulation;
Standardization Administration of the People’s Republic of China.
Table of Contents
Foreword... 3
1 Scope... 7
2 Normative References... 7
3 Terms and Definitions... 8
4 General Requirements... 12
5 Test Methods... 28
6 Inspection Rules... 28
7 Marking, Packaging, Storage and Transportation... 30
Appendix A (informative) Topological Structures of Commonly Used Full-power AC-
DC-AC Voltage-type Converter... 33
1 Scope
This Part of GB/T 25387 specifies the terms and definitions, general requirements, inspection
rules and product-related information of full-power AC-DC-AC voltage-type converters for
wind turbines generator system.
This Part is applicable to the full-power AC-DC-AC voltage-type converters for wind turbines
generator system (hereinafter referred to as “the converters”).
2 Normative References
The following documents are indispensable to the application of this document. In terms of
references with a specified date, only versions with a specified date are applicable to this
document. In terms of references without a specified date, the latest version (including all the
modifications) is applicable to this document.
GB/T 191 Packaging - Pictorial Markings for Handling of Goods
GB/T 2423.56 Environmental Testing - Part 2.Test Methods - Test Fh. Vibration, Broadband
Random and Guidance
GB/T 2900.53 Electrotechnical Terminology - Wind Turbine Generator Systems
GB/T 3797 Electrical Control Assemblies
GB/T 3859.1 Semiconductor Converters - General Requirements and Line Commutated
Converters - Part 1-1.Specification of Basic Requirements
GB/T 3859.2-2013 Semiconductor Converters- General Requirements and Line Commutated
Converters - Part 1-2.Application Guide
GB/T 4208-2017 Degrees of Protection Provided by Enclosure (IP code)
3 Terms and Definitions
What is defined in GB/T 3859.1 and GB/T 2900.53, and the following terms and definitions are
applicable to this document.
3.1 generator-side converter
A conversion unit that converts the AC electricity of the voltage, current amplitude and
frequency change output by the wind turbines into DC electricity.
3.2 grid-side converter
A conversion unit that converts the DC electricity output by the generator-side converter into
AC electricity that satisfies the requirements of the power grid, and feeds back to the power
grid.
3.10 grid-side rated voltage
The root mean square value of the fundamental wave of the conductor line voltage between the
low-voltage side of the boosting transformer adapted to the wind turbine and the grid-side
converter.
3.11 grid-side operating voltage range
The grid-side voltage variation interval corresponding to the continuous operation of the grid-
side converter.
3.12 grid-side rated current
The root mean square value of the fundamental wave current output by the grid-side converter
under the operating conditions of the lower limit of the voltage operating range of the grid-side
converter, the rated power and the unity power factor of the grid-side converter.
3.20 DC current content
Within a grid electrical cycle, in the current fed into the grid by the converter, the average DC
current as a percentage of the root mean value of the current.
3.21 DC voltage ripple coefficient
The ratio of the effective value of AC harmonic component in the DC voltage to the average
value of the DC voltage.
3.22 efficiency of converter
Under the operating conditions of the grid-side rated voltage, grid-side rated frequency and
unity power factor of the grid-side converter, the ratio of the output active power of the grid-
side converter to the input active power of the generator-side converter, expressed as a
percentage.
3.23 function of fault recorder
When a fault occurs in the converter, the converter has the function of automatically storing the
waveform at the time of the fault.
4 General Requirements
4.1 Requirements for Conditions of Use
4.1.1 Environmental conditions of normal operation
The environmental conditions of the operation of the converter shall comply with the
stipulations of GB/T 4798.3.The requirements are as follows.
4.1.2 Electrical conditions
4.1.2.1 Grid-side frequency range
When the frequency deviation of the power grid is within the range of 2.5 Hz ~ +2.5 Hz of the
rated frequency, the converter shall be able to normally operate.
4.1.2.2 Grid voltage range
When the voltage deviation of the low-voltage side grid of the boosting transformer connected
to the grid-side converter is within the range of 10% ~ +10%, the converter shall be able to
operate continuously and normally.
4.2 Cabinets and Components
4.2.1 Cabinet design requirements
The cabinet design shall satisfy the following requirements.
and surface, and shall comply with the stipulations of GB/T 3797.
4.2.2 Component requirements
The components shall satisfy the following requirements.
phenomenon of loosening or state changes after vibration.
4.2.3 Electrical connection requirements
4.2.3.1 The correctness of each electrical connection shall be ensured. Auxiliary devices, such
as. relays, contactors, micro circuit breakers and electronic components, shall be confirmed to
be qualified before the assembly.
4.2.3.2 The laying and connection of cables and wires shall comply with the stipulations of
GB/T 5226.1.
4.3 Performance Indicators
4.3.1 Converter efficiency
Under the operating conditions of the grid-side rated voltage, grid-side rated frequency, grid-
side rated power and grid-side unity power factor, the converter efficiency shall not be lower
than 97%.
4.3.2 Grid-side power factor
The converter shall be equipped with the control function that enables the grid-side power factor
to be adjustable between the capacitive 0.95 and the inductive 0.95.
4.3.7 Generator-side voltage change rate (dU/dt)
In accordance with the actual application conditions of the converter (for example, the cable
length at the installation site) and the maximum stress that the generator turns can withstand,
design the size of the dU/dt suppression filter of the converter. When the converter operates in
the wind turbine, the change rate of the generator-side converter output line voltage and the
phase-to-ground voltage shall satisfy dU/dt 1,000 V/s.
5 Test Methods
The test methods shall comply with GB/T 25387.2.
6 Inspection Rules
6.1 Type Test
6.1.1 Test requirements
Type test is a test that comprehensively assesses product performance and quality, and verifies
whether the product complies with the technical requirements. When one of the following
circumstances occurs, type test shall be carried out.
6.1.2 Sampling method
The samples for type test shall be sampled from a batch of products that have passed the exit-
factory test, and the number of samples shall be no less than two.
6.1.3 Determination rules
The type test items shall comply with the technical stipulations of the product. If all the items
are qualified, the product shall be determined as qualified; if any item is disqualified, then, the
product shall be determined as disqualified.
6.2 Exit-factory Test
In order to evaluate the product performance and ensure that the product complies with the
relevant requirements of relevant standards and type test, the assembled converter shall undergo
exit-factory test.
7 Marking, Packaging, Storage and Transportation
7.1 Marking
7.1.1 Product marking
The converter shall have a nameplate at an appropriate location. The content of the nameplate
is as follows.
7.1.2 Packaging marking
On the outer packaging of the converter, there are markings of receipt and delivery, packaging,
storage and transportation, as well as safety warning, which shall comply with the relevant
stipulations of GB/T 191 and GB/T 13384.
7.2 Packaging
7.3 Storage
7.3.1 The climatic conditions shall satisfy the following requirements.
7.3.2 Specific storage hazards shall satisfy the following requirements.
7.4 Transportation
7.4.1 The climatic conditions shall satisfy the following requirements.
7.4.2 The equipment shall be packaged with part of the packaging box of the supplier. During
transportation, there shall be no violent vibration or impact, and the product shall not be tilted
or inverted.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 25387.1-2021 be delivered?Answer: The full copy PDF of English version of GB/T 25387.1-2021 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 25387.1-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 25387.1-2021_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 25387.1-2021 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 25387.1-2021?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 25387.1-2021 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 25387.1-2021?A step-by-step guide to download PDF of GB/T 25387.1-2021_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 25387.1-2021". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|