GB/T 19409-2013 PDF English
US$130.00 · In stock · Download in 9 secondsGB/T 19409-2013: Water-source (ground-source) heat pumps Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid GB/T 19409: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 19409-2013 | English | 130 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Water-source (ground-source) heat pumps
| Valid |
| GB/T 19409-2003 | English | 799 |
Add to Cart
|
5 days
|
Water-source heat pumps
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 19409-2013
GB/T 19409-2013: Water-source (ground-source) heat pumps---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT19409-2013
GB
NATIONAL STANDARD OF THE
PEOPLE’S REPUBLIC OF CHINA
ICS 27.200
J 73
Replacing GB/T 19490-2003
Water source (ground-source) heat pumps
Issued on: DECEMBER 17, 2013
Implemented on: OCTOBER 01, 2014
Issued by. General Administration of Quality Supervision, Inspection
and Quarantine of the People’s Republic of China;
Standardization Administration of the People’s Republic of
China.
Table of Contents
Foreword... 3
1 Scope... 5
2 Normative references... 5
3 Terms and definitions... 6
4 Types and basic parameters... 7
5 Requirements... 9
6 Test method... 13
7 Inspection rules... 20
8 Mark, packaging, transportation and storage... 21
Annex A... 24
Annex B... 28
Foreword
This standard is drafted according to rules given by GB/T 1.1-2009.
This standard replaces GB/T 19049-2003 Water-source heat pumps. The main technical
changes are as follows, compared with GB/T 19049-2003.
- Add the “surface water type” in type;
- Change the name of underground loop type into “buried pipe type”;
- Change the “inlet-outlet water temperature difference 5°C at heat-source side under
working condition of hot-cold water models” to “the combination of outlet water
temperature and water flow”;
- Change the heat pump from 8-gears to 2-gears, according to cold classification;
- Modify the working condition; the working condition of centrifugal units and volumetric
units are determined separately;
- Add the annual coefficient of performance (ACOP) as the energy efficiency index of
heat pump unit.
This standard was proposed by China Machinery Industry Federation.
This standard shall be under the jurisdiction of China technical standardization
committee of cooling and air conditioning equipment (SAC/TC 238).
Drafting organizations of this standard. Hefei General Machinery Research Institute,
Shenzhen McQuay Air Conditioning Co., Ltd., Meiyi (Zhejiang) Air Conditioning
Equipment Co., Ltd., Shandong Hongli Air Conditioning Equipment Co., Ltd., Water
Furnace Shenglong HVACR Climate Solutions Co., Ltd., Hefei General Machinery and
Electronic Products Inspection Institute Co., Ltd., and Hefei General Environmental
Control Technology Co., Ltd.
Participating drafting organizations of this standard. Zhuhai Gree Electric Appliance Co.,
Ltd., Lotus Air-conditioning (Jiangsu) Co., Ltd., Yantai Lande air-conditioning Industrial Co.,
Ltd., Nanjing TICA Air Conditioning Equipment Co., ltd., Johnson Controls Building
Equipment Technology (Wuxi) Co., Ltd., Trane air conditioning systems (China) Co., Ltd.,
Qingdao Haier Air Conditioning Electronics Co., Ltd., Zhejiang Dunan Artificial
Environment Co., Ltd., Jiangxi Tsinghua Taihao three wave machine Co., Ltd., Shandong
Keling Air Conditioning Equipment Co., Ltd., Guangdong Xiwu Kangda Air Conditioning
Co., Ltd., and Shanxi Sijichun Clean Energy Co., Ltd.
Mani drafting staffs of this standard. Zhang Mingsheng, Zhou Wei, Wu Zhanhao, Cui
Haicheng, Dong Yunda, Zhong Yu, ang Yanjie, Chen Zhaohui, Chen Jinhua, Chen
Water source (ground-source) heat pumps
1 Scope
This standard specifies the terms and definitions, types and basic parameters,
requirements, test methods, inspection rules, marking, packaging, transport and storage
of water source (ground-source) heat pumps (hereinafter referred to as “UNIT”).
This standard applies to water source heat pumps that use electromechanical
compression cooling system and takes the water circulating in buried pipes or water in
wells, lakes, rivers, oceans, sewage, industrial waste, or water in common pipelines as
cold (hot) source.
2 Normative references
The following documents are indispensable for application of this document. For the dated
documents so quoted, only dated versions apply to this document. For the undated
documents so quoted, the latest versions (including all modification sheets) apply to this
document.
GB/T 191 Packaging - Pictorial marking for handling of goods
GB/T 3785-1983 Electric, sonic properties and measuring methods for sound level
meters
GB 4706.32 Safety of household and similar electrical appliances - Particular
requirements for heat pumps, air-conditioner and dehumidifier
GB/T 5226.1 Electrical equipment of industrial machines. Part 1.General
requirements
GB/T 6388 Transport package shipping mark
GB/T 10870-2001 The methods of performance test for positive displacement and
centrifugal water-chilling units and heat pump
GB/T 13306 Plates
GB/T 18430.1-2007 Water chilling (heat pump) packages using the vapor
compression cycle - Household and similar water chilling (heat pump) packages
GB/T 17758-2010 Unitary air conditioners
GB/T 18836-2002 Ducted air-conditioning (heat pump) units
3.1.5
Ground-loop heat pumps
The UNIT that uses water circulating in underground coil as cold (hot) source.
3.1.6
Surface-water heat pump
The UNIT that uses water in lakes, rivers, oceans, sewage, industrial waste, or other
surface water as cold (hot) source.
3.2
(ACOP) Annual Coefficient of Performance; ACOP
The annual coefficient of performance obtained by comprehensively WEIGHTING the
efficiency for water-source (ground-source) heat pumps when operating at full-load under
nominal cooling conditions and nominal heating conditions WITH several office buildings
in typical cities according to the ratio of cooling and heating time.
Annual coefficient of performance ACOP = 0.56EER+0.44COP
Note 1.EER is the energy efficiency of water (ground) heat pump when the UNIT runs at
full capacity under rated cooling condition.
Note 2.COP the energy efficiency of water (ground) heat pump when the UNIT runs at full
capacity under rated heating condition.
Note 3.The weighting coefficients, 0.56 and 0.44, are the proportion of cooling and
heating time of office buildings in Beijing, Harbin, Wuhan, Nanjing and Guangzhou
that accounts for the total air-conditioned time of office buildings.
4 Types and basic parameters
4.1 The types of water-to-air heat pump [Translator. hereafter abbreviated as
“heat-pump”]
4.1.1 The UNITs are divided into the following according to functions;
a) Heat-pump type;
b) Single-cold type;
c) Single-hot type.
4.1.2 The UNITs are divided into the following according to structure types;
a) Monolithic type;
b) Separated type.
4.1.3 The UNITs are divided into the following according to fan supply types;
a) Direct blowing type;
b) Compressed air type.
4.1.4 The UNITs are divided into the following according to the type of cold (hot) source
types;
a) Water-loop type;
b) Ground-water type;
c) Ground-loop type;
d) Surface-water type.
4.2 The types of water-to-water heat-pump
4.2.1 The UNITs are divided into the following according to function;
a) Heat-pump type;
b) Single-cold type;
c) Single-hot type.
4.2.2 The UNITs are divided into the following according to structure types;
a) Integral type;
b) Separated type.
4.2.3 The UNITs are divided into the following according to the type of cold (hot) source
types;
a) Water-loop type;
b) Ground-water type;
c) Ground-loop type;
d) Surface-water type.
4.3 Basic parameters
5.2.5 The water quality of the UNIT heat-source shall comply with requirements in Annex
D of GB/T 18430.1-2007.The water that cannot meet the quality requirements shall be
treated specially, or the appropriate heat exchanging equipment shall be used.
5.3 Performance requirements
5.3.1 Sealing of cooling system
There shall be no leakage of refrigerant in all parts of cooling system of the UNIT.
5.3.2 Running
The running test shall be done for the UNIT before the UNIT leaves the factory; there shall
be no abnormal situation of the UNIT after test. If the test condition is not complete or the
UNIT has a rated voltage being more than 3000 V, the UNIT can be run on-site.
5.3.3 Cooling capacity
The actual measured cooling capacity of the UNIT shall not be less than 95% of the
nominal cooling capacity.
5.3.4 Power of cooling system
The actual measured power of cooling system shall not be larger than 110% of the
nominal power of cooling system.
5.3.5 Heat capacity of heat-pump
The actual measured heat capacity of heat-pump shall not less than 95% of the nominal
heat capacity of heat-pump.
5.3.6 Heating power consumption of heat-pump
The actual measured heating power consumption of heat-pump shall not be larger than
110% of the nominal heating power consumption of heat-pump.
5.3.7 Static pressure and air flow
5.3.7.1 The actual measured minimum external static pressure of outdoor UNIT of air pipe
shall not be less than 95% of nominal statistic pressure value.
5.3.7.2 The actual measured air flow of water-to-air heat-pump shall not be less than 95%
of nominal air flow.
5.3.8 The maximum operating cooling
When the UNIT is under working cond...
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 19409-2013 be delivered?Answer: The full copy PDF of English version of GB/T 19409-2013 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 19409-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 19409-2013_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 19409-2013 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 19409-2013?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 19409-2013 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 19409-2013?A step-by-step guide to download PDF of GB/T 19409-2013_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD). Step 2: Search keyword "GB/T 19409-2013". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 Steps 4~6 Step 7 Step 8 Step 9
|