YS/T 124.5-2010 English PDFUS$319.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 124.5-2010: Methods of determination and calculation of heat balance in metallurgical furnaces for production of carbon products. Part 5: Greying resistance furnace Status: Valid
Basic dataStandard ID: YS/T 124.5-2010 (YS/T124.5-2010)Description (Translated English): Methods of determination and calculation of heat balance in metallurgical furnaces for production of carbon products. Part 5: Greying resistance furnace Sector / Industry: Nonferrous Metallurgy Industry Standard (Recommended) Classification of Chinese Standard: F01 Classification of International Standard: 59.100.20 Word Count Estimation: 12,158 Date of Issue: 2010-11-22 Date of Implementation: 2011-03-01 Older Standard (superseded by this standard): YS/T 124-1994 Regulation (derived from): MIIT (2010) No. 126 Issuing agency(ies): Ministry of Industry and Information Technology Summary: This standard specifies the graphite resistance furnace heat balance determination and calculation methods, through determination and calculation, examine resistance furnace under normal operating conditions with the energy situation and performance levels. This standard applies to all types of DC graphite resistance furnace heat balance determination and calculation methods, communication graphite resistance furnace can also be implemented by reference. YS/T 124.5-2010: Methods of determination and calculation of heat balance in metallurgical furnaces for production of carbon products. Part 5: Greying resistance furnace---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Methods of determination and calculation of heat balance in metallurgical furnaces for production of carbon products.Part 5. Greying resistance furnace ICS 59.100.20 F01 People's Republic of China Nonferrous Metals Industry Standard Partial replacement of YS/T 124-1994 Carbon products manufacturing furnaces Determination and calculation of heat balance Part 5. Graphite resistance furnace Part 5. Greyingresistancefurnace Issued on. 2010-11-22 2011-03-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released ForewordYS/T 124 "carbon products manufacturing Determination and calculation of heat balance of the furnace" is divided into five parts. --- Part 1. rotary kiln; --- Part 2. Tank calciner; --- Part 3. Electrical calciner; --- Part 4. roaster; --- Part 5. Graphite resistance furnace. This section YS/T 124 Part 5. This section drafted in accordance with GB/T 1.1-2009 given rules. This standard by the national non-ferrous metals Standardization Technical Committee (SAC/TC243) centralized. This part is YS/T 124-1994 "carbon products manufacturing Determination and calculation of heat balance of the furnace" in the graphite resistance furnace section of Amendments. Compared with YS/T 124-1994, the main changes are as follows. --- Specification standard unit of measurement, symbols and text formatting; --- Highlighting the standards of rigor, unity. The non-ferrous metal part by the National Standardization Technical Committee and centralized. This part of the Aluminum Corporation of China Guizhou Branch is responsible for drafting. The main drafters of this section. Pei Tianyi, Liugui Sheng, Xiang Yang, Wang Qiang. Carbon products manufacturing furnaces Determination and calculation of heat balance Part 5. Graphite resistance furnace1 ScopeYS/T of the provisions of section 124 of the thermal balance determination and calculation of resistance by graphite furnace, through determination and calculation, study resistance furnace Under normal operating conditions and performance levels with the energy situation. Determination and calculation of heat balance in this section applies to all types of DC graphite resistance furnace, AC graphitization resistance furnace can also be implemented by reference.2 time measuring system2.1 Determination System Measurement system for the whole of graphite resistance furnace, including the power supply portion of the transformer and rectifier unit. 2.2 Determination of time Graphite resistance furnace of the power transmission start time of transmission to the entire process of graphite resistance furnace outage termination of a measurement cycle.3 measurement items and methods3.1 Determination of power supply equipment 3.1.1 using the console, the dashboard and on-site souvenir token indication. The transformer primary voltage, current, active power, reactive power, power factor 3.1.2 determination; the secondary side of the voltage and current. 3.1.3 Determination rectifier current, voltage, resistance and calculates the direct power of the system. 3.1.4 Determination of the bus to the voltage drop of the graphite resistance furnace conductive graphite block junction, the contact resistance value calculated throughout. Measurement system Current must be more than 80% of the rated output current. 3.2 Temperature measurement Temperature measurement are shown in Table 1. Table 1 graphite resistance furnace each measuring point of temperature measurement Reference measuring point measurement method requirements SMIC furnace 1 electrode blanks2 outer electrode blanksResistive material layer 34 insulation material layerKui stone hearth layer 5 The graphite tube is inserted into the furnace core temperature, respectively, in the stove, oven, stove insert each end of a Root, within 1000 ℃ measured with a thermocouple, higher than 1000 ℃, with spokes Shot pyrometer or infrared thermometer measurement Buried on both sides and the middle of each thermocouple measurement With soft thermocouple embedded silica layer, the protective sleeve plus lead Each measuring point requirements in a short time After determination of every 4h measuring once ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of YS/T 124.5-2010_English be delivered?Answer: Upon your order, we will start to translate YS/T 124.5-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of YS/T 124.5-2010_English with my colleagues?Answer: Yes. The purchased PDF of YS/T 124.5-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |