YS/T 118.15-2012 English PDFUS$499.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. YS/T 118.15-2012: Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Converter) Status: Valid YS/T 118.15: Historical versions
Basic dataStandard ID: YS/T 118.15-2012 (YS/T118.15-2012)Description (Translated English): Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Converter) Sector / Industry: Nonferrous Metallurgy Industry Standard (Recommended) Classification of Chinese Standard: H01 Classification of International Standard: 77.120 Word Count Estimation: 19,163 Older Standard (superseded by this standard): YS/T 118.15-1992 Regulation (derived from): Ministry of Industry and Information Technology Bulletin No. 55 of 2012; industry standard filing Notice 2013 No. 1 (No. 157 overall) Issuing agency(ies): Ministry of Industry and Information Technology Summary: This standard specifies the blowing converter heat balance measurement and calculation basis, Equipment Overview and production process, heat balance measurement conditions, the heat balance measurement items and methods, material balance, heat balance, t YS/T 118.15-2012: Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals(Converter)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order. Methods of determination and calculation of heat balance in metallurgical furnaces for heavy non-ferrous metals (Converter) ICS 77.120 H01 People's Republic of China Nonferrous Metals Industry Standard Replacing YS/T 118.15-1992 Heavy non-ferrous metallurgical furnaces thermal balance determination and calculation method (Blowing BOF) (Converter) Issued on. 2012-11-07 2013-03-01 implementation Ministry of Industry and Information Technology of the People's Republic of China released ForewordThis section drafted in accordance with GB/T 1.1-2009 given rules. The partial replacement of YS/T 118.15-1992 "heavy non-ferrous metallurgical furnaces thermal balance determination and calculation method (blowing converter)." versus YS/T 118.15-1992 compared to the main changes are as follows. --- Increased the determination and calculation of the waste heat boiler; --- Part of the project to reflect the increase of converter operation parameters or technical indicators; --- Delete does not reflect the technical parameters of the converter running or metric project. The non-ferrous metal part by the National Standardization Technical Committee (SAC/TC243) centralized. This section is responsible for drafting unit. Jinchuan Group Limited. Participated in the drafting of this section. Central South University. The main drafters of this section. Yuezhan Bin, high Yonghong, pure love horses, painted HU Bing, Wan Oi Tung, Li, Wu Yahui, Bao Zhu, Liu and. This part of the standard replaces the previous editions are. --- YS/T 118.15-1992. Heavy non-ferrous metallurgical furnaces thermal balance determination and calculation method (Blowing BOF)1 ScopeYS/T in this part 118 specifies the blowing converter thermal balance determination and calculation of baseline survey and production process equipment, heat balance measurement Given conditions, heat balance measurement items and methods, material balance, heat balance, the main indicators of energy consumption, heat balance measurement results analysis and recommendations for improvement. This section applies to blowing smelting matte or low nickel ice horizontal converter.2 thermal balance determination and calculation of the reference2.1 reference temperature and pressure Blowing converter using ambient temperature as the reference temperature. Reference pressure is a standard atmospheric pressure, that is 101325 Pa (Pa). 2.2 Determination of heat balance system This part blowing converter thermal equilibrium system. Material balance and heat balance from the wind into the furnace, the charge inlet to blister copper or high-nickel matte, furnace Slag, waste heat boiler flue gas outlet so far. 2.3 Units Material balance and heat balance are a furnace operating cycle is calculated on the basis, that is, kg/furnace and kJ/stove.3 Device Overview and production process3.1 Equipment Overview Blowing converter equipment before fill in Table 1. Table 1 Device Overview No. Name Unit Value No. 1 furnace 2 furnace size (diameter × length) m × m3 nominal capacity t4 Number of outlet points5 mm diameter outletThe total area of the outlet 6 cm2 ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of YS/T 118.15-2012_English be delivered?Answer: Upon your order, we will start to translate YS/T 118.15-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of YS/T 118.15-2012_English with my colleagues?Answer: Yes. The purchased PDF of YS/T 118.15-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version YS/T 118.15-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version YS/T 118.15-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |