Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

TB/T 1528.6-2018 English PDF

US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
TB/T 1528.6-2018: Railway signal power supply system equipments. Part 6: Uninterruptible power source and batteries
Status: Valid

TB/T 1528.6: Historical versions

Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
TB/T 1528.6-2018439 Add to Cart 4 days Railway signal power supply system equipments. Part 6: Uninterruptible power source and batteries Valid
TB/T 1528.6-2002479 Add to Cart 3 days Railway signal power supply panel. Part 6: Block section power supply panel Obsolete

Similar standards

TB/T 3539   TB/T 2296   TB/T 3189   TB/T 1528.2   TB/T 1528.3   TB/T 1528.1   

Basic data

Standard ID: TB/T 1528.6-2018 (TB/T1528.6-2018)
Description (Translated English): Railway signal power supply system equipments. Part 6: Uninterruptible power source and batteries
Sector / Industry: Railway & Train Industry Standard (Recommended)
Classification of Chinese Standard: S61
Classification of International Standard: 45.020
Word Count Estimation: 19,13
Date of Issue: 2018-12-20
Date of Implementation: 2019-07-01
Quoted Standard: GB/T 191; GB/T 2423.1-2008; GB/T 2423.2-2008; GB/T 2423.3-2016; GB/T 4208-2017; GB/T 5465.2; GB/T 19638.1-2014; GB/T 24338.5; TB/T 1528.1-2018; TB/T 1528.2-2018; TB/T 2993.3-2016; YD/T 1095-2007; YD/T 1360-2005
Regulation (derived from): National Railways Regulations (2018) 98
Issuing agency(ies): National Railway Administration
Summary: This standard specifies the centralized uninterruptible power supply (hereinafter referred to as UPS) and the battery pack technical requirements, inspection methods, inspection rules, marking, packaging, transportation and storage of the centralized power supply used in conjunction with the signal power supply screen in the railway signal power system equipment. . This section applies to the design, manufacture, inspection, use and maintenance of UPS and battery packs. This section does not apply to UPS power supplies that are separately set in system equipment such as signal centralized monitoring.
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of TB/T 1528.6-2018_English be delivered?

Answer: Upon your order, we will start to translate TB/T 1528.6-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of TB/T 1528.6-2018_English with my colleagues?

Answer: Yes. The purchased PDF of TB/T 1528.6-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version TB/T 1528.6-2018?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version TB/T 1528.6-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.