TB 10420-2018 English PDFTB 10420: Historical versions
Basic dataStandard ID: TB 10420-2018 (TB10420-2018)Description (Translated English): Standard for Acceptance of Electric Power Works in Railway Sector / Industry: Railway & Train Industry Standard Classification of Chinese Standard: P65 Word Count Estimation: 194,145 Date of Issue: 2018-11-12 Date of Implementation: 2019-02-01 Older Standard (superseded by this standard): TB 10420-2003 Regulation (derived from): National Railways Regulations (2018) No. 91 Issuing agency(ies): National Railway Administration UDC
INDUSTRY STANDARD
OF THE PEOPLE’S REPUBLIC OF CHINA
P TB 10420-2003
Standard for Quality Acceptance
of Railway Electric Power Engineering
ISSUED ON. DECEMBER 16, 2003
IMPLEMENTED ON. JANUARY 1, 2004
Issued by. Ministry of Railways of the People’s Republic of China
TB
Amendment on “Inspection quantity” and “Inspection
method”, etc.
4.2.2 Inspection quantity. Supervisor shall witness the inspection of 10% of the checking
quality of the builder, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.2.4 Inspection quantity. Supervisor shall witness the inspection of 10% of the checking
quality of the builder, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.2.6 Add
Inspection quantity. Full inspection by both the builder and the supervisor
Inspection method. Visual observation.
4.2.7 Inspection quantity. Supervisor shall witness the inspection of 10% of the checking
quality of the builder, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.2.9 Inspection quantity. Full inspection by both the builder and the supervisor, amended to
Full inspection by the builder
4.3.1 Inspection quantity. Supervisor shall witness the inspection of 10% of the checking
quality of the builder, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.3.2 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
Inspection method. Check the qualifying certificate, and observe and measure the steel structural
pole and its metal accessories, amended to
Inspection method. Check the qualifying certificate document(s), checking by observing and
measuring.
4.3.3 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
Inspection method. Check the qualifying certificate, and observe and measure the metal structural
members, amended to
Inspection method. Check the qualifying certificate document(s), checking by observing.
4.3.4 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
Inspection method. Check the qualifying certificate, and observe and measure the metal structural
members, amended to
Inspection method. Check the qualifying certificate document(s), checking by observing.
4.3.5 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.3.6 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
4.3.7 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.1 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.2 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.3 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.4 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.5 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.2.6 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.3.1 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.3.4 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.1 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.3 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.4 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.5 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.6 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.7 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.8 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.9 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.4.10 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.5.1 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.5.2 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.5.4 Inspection quantity. Appearance checking shall be carried out by the supervisor of 10% of
the quality by builder checking, amended to
Inspection quantity. Full inspection by both the builder and the supervisor
5.5.5 Inspection quantity. Appearance checking shall be carried out by the superv...
......
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of TB 10420-2018_English be delivered?Answer: Upon your order, we will start to translate TB 10420-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of TB 10420-2018_English with my colleagues?Answer: Yes. The purchased PDF of TB 10420-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version TB 10420-2018?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version TB 10420-2018 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |