SN/T 4719-2016 English PDFUS$229.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. SN/T 4719-2016: Rules for quarantine treatment of lily bulb nematodes Status: Valid
Basic dataStandard ID: SN/T 4719-2016 (SN/T4719-2016)Description (Translated English): Rules for quarantine treatment of lily bulb nematodes Sector / Industry: Commodity Inspection Standard (Recommended) Classification of Chinese Standard: B16 Word Count Estimation: 10,192 Date of Issue: 2016-12-12 Date of Implementation: 2017-07-01 Regulation (derived from): State-Quality-Inspection-Accredidation (2016) No.590 Issuing agency(ies): General Administration of Customs SN/T 4719-2016: Rules for quarantine treatment of lily bulb nematodes---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Rules for quarantine treatment of lily bulb nematodes People's Republic of China Exit Inspection and Quarantine standards Quarantine of incoming lily bulbs with quarantine nematodes Handling procedures 2016-12-12 released 2017-07-01 implementation People's Republic of China General Administration of Quality Supervision, Inspection and Quarantine released ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. Please note that some of this document may be patentable. The release of this document The agency does not assume responsibility for identifying these patents. This standard is proposed and managed by the National Certification and Accreditation Administration Committee. This standard was drafted by Tianjin Entry-Exit Inspection and Quarantine Bureau, People's Republic of China. The main drafters of this standard. Zhang Ruifeng, Wang Jincheng, Yang Fei, Cheng Yu, Lin Yu, Hu Jia continued, Zhang Ying, Wang Yu, Wei Yadong. Quarantine of incoming lily bulbs with quarantine nematodes Handling procedures1 ScopeThis standard specifies the entry Lily bulbs pass quarantine nematodes handling procedures. This standard applies to the entry of lily ball quarantine quarantine treatment.2 Normative referencesThe following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 434 methyl bromide original drug GB/T 5452 56% aluminum phosphide tablets GB 7796 Occupational acute methyl bromide poisoning diagnostic criteria and principles GB/T 19337 Abamectin EC GB/T 20478 Phytosanitary terms GBZ 11 Occupational acute phosphine poisoning diagnosis SN/T 1143 fumigation plant pest fumigation treatment procedures SN/T 3295 culture medium quarantine requirements3 Terms and definitionsGB/T 20478 and defined by the following terms and definitions apply to this document. 3.1 Medicinal dip pesticidedipping Put the treatment object into a specific container, add the pesticide prepared according to the specific requirements in the container, kill the target pest or Inactivation process.4 basic requirements4.1 fumigation treatment fumigation Treasury warehouse site selection, construction, equipment installation, fumigation library seal and alert mark set by SN/T 1143. 4.2 Immersion tank required to build a rectangle, and the living area and the working area distance of not less than 50m, no cracks, immersion pond should be provided around the fence, And has obvious warning signs. 4.3 The implementation of fumigation and immersion treatment units and personnel should go through the inspection and quarantine agencies accreditation and training, have engaged in quarantine treatment industry Service capacity and qualification. 4.4 In the implementation of quarantine treatment operators found poisoning symptoms, quarantine treatment should be stopped immediately, according to the use of pesticides Categories, respectively, according to GB 7796, GBZ 11 and GB/T 19337 implementation. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SN/T 4719-2016_English be delivered?Answer: Upon your order, we will start to translate SN/T 4719-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of SN/T 4719-2016_English with my colleagues?Answer: Yes. The purchased PDF of SN/T 4719-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |