SH/T 3512-2011 English PDFUS$1669.00 ยท In stock
Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email. SH/T 3512-2011: Technical specification for construction of spherical tanks in petrochemical industry Status: Valid SH/T 3512: Historical versions
Basic dataStandard ID: SH/T 3512-2011 (SH/T3512-2011)Description (Translated English): Technical specification for construction of spherical tanks in petrochemical industry Sector / Industry: Petrochemical Industry Standard (Recommended) Classification of Chinese Standard: P72 Classification of International Standard: 75.200 Word Count Estimation: 68,683 Date of Issue: 2011-05-18 Date of Implementation: 2011-06-01 Older Standard (superseded by this standard): SH/T 3512-2002 Quoted Standard: GB/T 3965; GB/T 4842; GB/T 5117; GB/T 5118; GB/T 8110; GB/T 10045; GB/T 14957; GB 50094; GB 50484-2008; JB 4708; JB/T 4730.2; JB/T 4730.3; JB/T 4730.4; JB/T 4730.5; JB 4744; JB 4747; SH 3022; SH/T 3503; SH/T 3522; SH/T 3543; TSG ZF001-2006; quality Supervision, Inspection and Quarantine General Order No. 22 boiler and pressure vessel manufacturing supervision and management measures; TSG R0004-2009; national quality pot [ 2003 ] No. 248 special equipment for nondestructive testing personnel appraisal and supervision rules; TSG Z6002-2010; quality special letter [ 2007 ] CF Series No. 52 on the strengthening of steel for pressure vessel manufacturing management advice Regulation (derived from): Ministry of Industry and Information Technology Bulletin No. 13 of 2011 Issuing agency(ies): Ministry of Industry and Information Technology Summary: This standard specifies the spherical tank construction processes and construction methods, provides on-site welding process quality control, inspection and testing requirements and construction process and quality technical documentation requirements. This standard applies to the design pressure of not more than petrochemical 4 MPa, nominal volume of not less than 50 m3 of orange petal or hybrid with pillars supporting carbon steel, low temperature steel and low alloy steel welded tank construction, does not apply asked to do fatigue analysis tank construction. Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of SH/T 3512-2011_English be delivered?Answer: Upon your order, we will start to translate SH/T 3512-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of SH/T 3512-2011_English with my colleagues?Answer: Yes. The purchased PDF of SH/T 3512-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.Question 5: Should I purchase the latest version SH/T 3512-2011?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version SH/T 3512-2011 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically. |