Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

NB/T 20149-2012 PDF English

US$505.00 · In stock · Download in 9 seconds
NB/T 20149-2012: Qualification procedure for pressure transmitter important to safety of nuclear power plants
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDUSDBUY PDFDeliveryStandard Title (Description)Status
NB/T 20149-2012505 Add to Cart Auto, 9 seconds. Qualification procedure for pressure transmitter important to safety of nuclear power plants Valid

Similar standards

NB/T 20318   NB/T 20019   NB/T 20336   

NB/T 20149-2012: Qualification procedure for pressure transmitter important to safety of nuclear power plants


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/NBT20149-2012
ENERGY INDUSTRY STANDARD OF THE PEOPLE��S REPUBLIC OF CHINA ICS 27.120.99 F 82 Filing number. 38339-2013 Qualification procedure for pressure transmitter important to safety of nuclear power plants Issued on. OCTOBER 19, 2012 Implemented on. MARCH 01, 2013 Issued by. National Energy Administration

Table of Contents

Foreword... 4 1 Scope... 5 2 Normative references... 5 3 Terms and definitions... 6 4 Qualification test requirements... 9 4.1 General requirements... 9 4.2 Basic requirements for qualification tests... 9 4.3 Qualification test documents... 9 5 Program of qualification test... 9 5.1 Basic requirements... 9 5.2 Description of qualification device... 10 5.3 Qualification test conditions... 10 5.4 Qualification life goals... 11 5.5 Qualification margin... 11 5.6 Monitoring of functional characteristics during test... 12 5.7 Selection of test samples... 12 5.8 Evaluation of aging effects... 12 5.9 Maintenance during the test... 13 5.10 Test sequence... 13 5.11 Acceptance criteria... 14 5.12 Evaluation of test process... 14 6 Qualification test... 15 6.1 Compliance inspection and test preparation... 15 6.2 Reference test... 16 6.3 Test of influence quantity limit... 20 6.4 Test for evaluating the performance change of equipment over time... 33 6.5 Simulation test of design basis accident... 39 7 Records and reports... 47 7.1 Qualification test record... 47 7.2 Qualification test report... 47 Appendix A (Informative) Descriptions of pressure transmitter��s characteristics ... 48 Appendix B (Informative) Accuracy calculation... 50 Appendix C (Informative) Typical LOCA test curve... 53

1 Scope

This standard specifies the test methods, test items and sequence, test and acceptance criteria during the test period for the qualification of the pressure transmitter important to safety of nuclear power plants (including positive, negative gauge pressure, differential pressure and absolute pressure). This standard is applicable to the qualification of pressure transmitters for PWR nuclear power plants, not to the software qualification of intelligent pressure transmitters. The pressure transmitter of other types of nuclear power plant may refer to this standard.

2 Normative references

The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this standard. GB/T 2423.1 Environmental testing for electric and electronic and electronic products - Part 2.Test methods - Tests A. Cold GB/T 2423.2 Environmental testing for electric and electronic products - Part 2.Test methods - Tests B. Dry heat GB/T 2423.3 Environmental testing - Part 2.Testing method - Test Cab. Damp heat, steady state GB/T 2423.4 Environmental testing for electric and electronic products - Part 2.Test method - Test Db. Damp heat, cyclic (12h+12h cycle) GB/T 2423.5 Environmental testing for electric and electronic products - Part 2.Test methods - Test Ea and guidance. Shock GB/T 2423.10 Environmental testing for electric and electronic products - Part 2.Tests methods - Test Fc. Vibration (sinusoidal) GB/T 29308 Management requirement of ageing of instrumentation and control systems important to safety for nuclear power plants GB/T 12727 Qualification of safety class electrical equipment for nuclear power plants

3 Terms and definitions

The terms and definitions defined in GB/T 12727 as well as the following terms and definitions apply to this document. 3.1 Pressure transmitter The instrument that converts the process variables (pressure, pressure difference, liquid level, flow) into 4 mA ~ 20 mA standard electrical signals 3.2 Gauge pressure (or absolute pressure) transmitter Transmitter whose output electrical signal is proportional to gauge pressure (or absolute pressure) applied to the pressure tap. 3.3 Differential pressure transmitter The transmitter whose output electrical signal is proportional to the pressure difference between its two pressure taps. 3.4 Static pressure; differential pressure transmitter Gauge or absolute pressure applied to a pressure tap of the transmitter. 3.5 Gauge pressure; absolute pressure The pressure applied to the pressure tap of the transmitter for gauge pressure (or absolute pressure). 3.6 Influence quantities The quantity that is not measured but can affect the measurement result.

4 Qualification test requirements

4.1 General requirements The qualification of the pressure transmitter shall prove that during the life of the qualification, under the environmental conditions of the design basis accident, the pressure transmitter important for safety has the characteristics of implementing the safety functions specified in the technical specifications (including insulation resistance, accuracy, response time). 4.2 Basic requirements for qualification tests Each qualification test of the pressure transmitter shall be performed on the same type of pressure transmitter. The test sample shall be consistent with the actual transmitter in terms of design, material and manufacturing process. The test conditions shall meet or exceed the most severe environmental and operating conditions that may actually be experienced. 4.3 Qualification test documents The qualification test results of the pressure transmitter shall be documented as evidence that the pressure transmitter can implement its safety function during the qualification life period and design basis accident period.

5 Program of qualification test

5.1 Basic requirements The qualification of the pressure transmitter shall first compile the applicable qualification test program, detailing the inspections, tests, performance indicators, acceptance criteria, required analysis as required by the test sample��s qualification test to prove that the pressure transmitter implements its safety function. 5.2 Description of qualification device 5.2.1 Identification of device It shall detail the type, manufacturer, procurement technical specifications and manufacturing related documents of the pressure transmitter to be qualified (including descriptions of functional and structural characteristics, drawings, operation and maintenance manuals, material descriptions, relevant standard, specifications). 5.3 Qualification test conditions 5.3.1 Test conditions during normal and abnormal operation The qualification test program of the pressure transmitter shall determine the magnitude of the test conditions (including rated values and limit values) and their expected duration during normal and abnormal operation of the power plant. These conditions include at least the following. 5.3.2 Test conditions for design basis accidents The qualification test program of the pressure transmitter shall determine the simulation test conditions during and after the following design basis accidents, as well as the duration required to implement the safety function. These conditions include changes in temperature, pressure, radiation dose over time, chemical conditions, seismic loads, power supply surges. 5.4 Qualification life goals The qualification test program shall, based on the power plant��s management requirements and the pressure transmitter's technical specification requirements, determine the target value of pressure transmitter's qualification life. If the equipment specification does not determine the qualification life target, the qualification test program shall determine the qualification life target of the pressure transmitter according to GB/T 12727. 5.5 Qualification margin In order to ensure that the pressure transmitter has satisfactory performance under severe environmental and operating conditions, the qualification test shall consider the qualification margin. 5.6 Monitoring of functional characteristics during test The qualification test program shall determine the electrical performance and functional characteristics (insulation resistance, accuracy, and / or response time) to be measured during each test of the pressure transmitter and at the end of the test and after the equipment is restored. 5.7 Selection of test samples Some test items of the pressure transmitter��s qualification test may not be conducted on the same test sample. The test shall determine the number of test samples based on the installation location of the pressure transmitter (inside the containment, in the equipment compartment, in the containment annular space or outside the containment) as well as the configuration of the test item. 5.10 Test sequence The qualification test of the pressure transmitter shall be carried out in accordance with the test sequence requirements as specified in GB/T 12727. The test program shall formulate detailed test steps and sequences for transmitters of different types of qualification requirements; the test sequence��s configuration shall be such that the test samples are in the most severely degraded state at the end of the qualification life. Table 1 lists the test sequences for reference. 5.11 Acceptance criteria The test program shall determine the acceptance criteria for the electrical performance and functional characteristics of the test samples at each stage of the qualification test based on the performance requirements specified in the technical specifications for equipment purchase. 5.12 Evaluation of test process The values of functional characteristics monitored by each test during the qualification test shall be compared with the acceptance criteria. If a deviation occurs, it shall be based on the analysis and evaluation of the acceptance criteria to determine whether to continue or abort the test.

6 Qualification test

6.1 Compliance inspection and test preparation 6.1.1 Compliance inspection Prior to the start of the qualification test, it shall perform the compliance inspection of the test samples and relevant documents (including material qualification certificates, strength calculations, etc.), to confirm that the samples to be tested represent pressure transmitters that require on-site installation (see Appendix A). 6.1.2 Test preparation 6.1.2.1 Adjustment of pressure transmitter Each test of the pressure transmitter��s qualification test shall be conducted after the zero point and sensitivity are adjusted in accordance with the operating instructions of the pressure transmitter. Zero point and sensitivity are adjusted as follows. 6.1.2.2 Power supply and load resistance The power supply voltage used for testing and measurement is equal to the rated value given in the technical specifications; the ripple factor of the power supply is less than 0.1% of the power supply voltage; the load resistance value of the pressure transmitter is equal to the rated value specified in the identification file. 6.2 Reference test 6.2.1 Dielectric strength measurement 6.2.1.1 Test conditions The test is conducted by the use of an AC sine wave voltage which has a rated frequency of 50 Hz. The test voltage is as shown in Table 2. The test shall be conducted under normal atmospheric conditions, see JJG 882. The pressure transmitter, together with the electrical connector, is grounded as follows. 6.2.1.2 Test Disconnect the power supply of the pressure transmitter. Short-circuit the power terminal and the output terminal respectively. Measure the dielectric strength between the power terminal and the ground terminal (housing), the power terminal and the output terminal, the output terminal and the ground terminal (housing) on the withstanding voltage tester. 6.2.1.3 Acceptance criteria There shall be no breakdown or arcing in 1 minute. 6.2.2 Measurement of insulation resistance 6.3 Test of influence quantity limit 6.3.1 Dry heat test 6.3.1.1 Overview The purpose of this test is to verify the adaptability of the dry heat effect of the pressure transmitter during transportation and storage. 6.3.1.2 Test conditions This test shall be carried out in accordance with the provisions of GB/T 2423.2 (Test B). 6.3.1.3 Measurement After 4h restoration, it shall carry out the following measurements. 6.3.1.4 Acceptance criteria If the technical specifications do not specify clearly, it may adopt the following acceptance criteria. 6.3.2 Low temperature test 6.3.2.1 Overview The purpose of this test is to verify the low temperature adaptability of the pressure transmitter during transportation and storage. 6.3.2.2 Test conditions This test shall be carried out in accordance with the provisions of GB/T 2423.1 (Test A). 6.3.5 Mechanical shock resistance test 6.3.5.1 Overview The purpose of this test is to simulate the random impact adaptability that the pressure transmitter may be subjected to during use or transportation. 6.3.5.2 Test conditions This test shall meet the requirements of GB/T 2423.5. The test is carried out under normal atmospheric conditions. The equipment is not energized; it is fixed on a rigid bracket according to the on-site fixing method of the pressure transmitter. The impact force shall be applied vertically on each plane of the three reference axis of the pressure transmitter.

7 Records and reports

7.1 Qualification test record Qualification test records shall include at least. a) The model, identification and number of the device under test; b) The name, model and number of the test device, equipment and instruments used; c) Detailed data and recording curves of test conditions; d) Record (or record form) of each test; e) Abnormal conditions that occurred during the test; f) Tester's signature and date. 7.2 Qualification test report The qualification test report shall include at least. ......

Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Image 1     Image 2     Image 3     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of English version of NB/T 20149-2012 be delivered?Answer: The full copy PDF of English version of NB/T 20149-2012 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of NB/T 20149-2012_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 20149-2012_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- NB/T 20149-2012 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of NB/T 20149-2012?

A step-by-step guide to download PDF of NB/T 20149-2012_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "NB/T 20149-2012".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9