Home Cart Quotation About-Us
www.ChineseStandard.net
SEARCH

NB/T 20094-2012 English PDF

US$629.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 20094-2012: Containment ventilation system of pressurized water reactor nuclear power plant
Status: Valid
Standard IDUSDBUY PDFLead-DaysStandard Title (Description)Status
NB/T 20094-2012629 Add to Cart 5 days Containment ventilation system of pressurized water reactor nuclear power plant Valid

Similar standards

NB/T 20015   EJ/T 350   EJ/T 424   NB/T 20103   NB/T 20097   NB/T 20084   

Basic data

Standard ID: NB/T 20094-2012 (NB/T20094-2012)
Description (Translated English): Containment ventilation system of pressurized water reactor nuclear power plant
Sector / Industry: Energy Industry Standard (Recommended)
Classification of Chinese Standard: F69
Classification of International Standard: 27.120.20
Word Count Estimation: 24,215
Older Standard (superseded by this standard): EJ/T 385-1989
Quoted Standard: GB 6249; GB/T 12727; GB/T 12788; GB/T 13284.1; GB/T 13286; GB/T 13625; GB/T 13626; GB/T 17569; GB/T 17939; GB/T 22158; EJ/T 317; EJ/T 331; EJ/T 415; EJ/T 570; EJ/T 722; EJ/T 1082; EJ/T 1144; NB/T 20012; NB/T 20018; NB/T 20039.3; NB/T 20039.12; NB/T 20039.
Regulation (derived from): National Energy Board Notice No. 2 of 2012; industry standard for filing Notice No. 4 of 2012 (No. 148 overall)
Issuing agency(ies): National Energy Administration
Summary: This standard specifies the design criteria and basic requirements of the containment ventilation system and equipment for PWR nuclear power plants, as well as the physical design requirements. This standard applies to the pressurized water reactor nuclear power plant for a containment structure within the service, by the equipment, duct control devices, since the dynamic components for the implementation of exhaust, heating, air purification and ventilation ventilation system. This standard does not apply to containment circular space ventilation system, containment filter exhaust system, containment hydrogen control system, containment within the material channel blowing ventilation system, do not use air-cooled control rod drive mechanism cooling system, ice condenser Compartment environmental control system.
Image     

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of NB/T 20094-2012_English be delivered?

Answer: Upon your order, we will start to translate NB/T 20094-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of NB/T 20094-2012_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 20094-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.